If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504263605003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.357704,"lon":-113.68138,"icon":""}]} |
Location: 00/05-36-050-26W4/3 | |
Location Alias: 00/05-36-50-26 W4M | |
Location Alias 2: 00/05-36-050-26 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 36 | |
County/Municipality: Edmonton | |
Well Name: MEC LEDUC-WB 5-36-50-26 | |
Operator Name: NEP Canada ULC | |
License Number: 0002089 | |
License Date: 1950-09-26 | |
License Status: Suspension | |
Spud Date: 1950-10-20 | |
Final Drill Date: 1950-11-16 | |
Well Total Depth: 1624.30 m | |
Surface Hole Latitude: 53.357704 | |
Surface Hole Longitude: -113.681380 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1950-09-26 | Obtained License |
1950-11-11 | Liner Casing Operation Performed |
1950-11-16 | Finished Drilling |
1950-11-16 | Well Mode changed to Drilled and Cased |
1950-11-26 | Perforation Treatment Performed - Acid Wash - No Pressure |
1950-11-26 | Perforation Treatment Performed - Bullet Perforation |
1977-07-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-07-16 | Perforation Treatment Performed - Cement Plug |
1981-07-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1981-07-21 | Perforation Treatment Performed - Jet Perforation |
1996-07-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-07-04 | Plug Back Performed |
1997-09-15 | Well Log Performed |
1997-09-16 | Perforation Treatment Performed - Jet Perforation |
2002-01-07 | Perforation Treatment Performed - Cement Squeeze |
2002-01-07 | Perforation Treatment Performed - Chemical Squeeze |
2002-01-07 | Plug Back Performed |
2002-01-11 | Perforation Treatment Performed - Jet Perforation |
2002-01-14 | Perforation Treatment Performed - Bridge Plug No Cement Required |
2002-01-14 | Perforation Treatment Performed - Jet Perforation |
2002-01-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-09-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2003-09-23 | Plug Back Performed |
2003-09-24 | Perforation Treatment Performed - Jet Perforation |
2003-09-24 | Well Log Performed |
2003-09-25 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2004-03-15 | Well Began Production |
2004-03-15 | Well Fluid changed to Gas |
2004-03-15 | Well Mode changed to Flowing |
2016-11-01 | Well Fluid changed to Gas |
2016-11-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1950-11-26 | Bullet Perforation | 1611.50 | 1613.00 | 13 |
1997-09-16 | Perforation | 1222.00 | 1224.00 | 19 |
2002-01-07 | Chemical Squeeze | 1222.00 | 1224.00 | 0 |
2002-01-07 | Cement Squeeze | 1222.00 | 1224.00 | 0 |
2002-01-11 | Perforation | 1575.00 | 1577.00 | 18 |
2002-01-14 | Bridge Plug, No Cement | 1570.00 | 1571.00 | 0 |
2002-01-14 | Perforation | 1557.00 | 1559.00 | 18 |
2002-01-15 | Acid Treatment | 1557.00 | 1559.00 | 0 |
2003-09-23 | Packing Device Capped w/Cement | 1542.00 | 1550.00 | 0 |
2003-09-24 | Perforation | 1330.50 | 1334.30 | 17 |
2003-09-24 | Perforation | 1316.60 | 1319.30 | 17 |
1950-11-26 | Acid Wash | 1611.50 | 1613.00 | 0 |
2003-09-24 | Perforation | 1311.80 | 1314.80 | 17 |
2003-09-25 | Acid Treatment | 1330.50 | 1334.30 | 0 |
2003-09-25 | Acid Treatment | 1316.60 | 1319.30 | 0 |
2003-09-25 | Acid Treatment | 1311.80 | 1314.80 | 0 |
1950-11-26 | Bullet Perforation | 1611.50 | 1613.00 | 7 |
1950-11-26 | Acid Wash | 1611.50 | 1613.00 | 0 |
1977-07-05 | Acid Treatment | 1611.50 | 1613.00 | 0 |
1981-07-16 | Cement Plug | 1611.50 | 1615.10 | 0 |
1981-07-21 | Perforation | 1611.20 | 1611.30 | 13 |
1981-07-21 | Acid Treatment | 1611.20 | 1611.30 | 0 |
1996-07-04 | Packing Device Capped w/Cement | 1600.00 | 1608.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2004 | 3663 | 0.0 | 0.0 | 0.0 |
2005 | 8605 | 0.0 | 0.0 | 0.0 |
2006 | 7710 | 0.0 | 0.0 | 0.0 |
2007 | 8446 | 0.0 | 0.0 | 0.0 |
2008 | 8135 | 0.0 | 0.0 | 0.0 |
2009 | 6709 | 0.0 | 0.0 | 0.0 |
2010 | 8371 | 0.0 | 0.0 | 0.0 |
2011 | 8633 | 0.0 | 0.0 | 0.0 |
2012 | 8515 | 0.0 | 0.0 | 0.0 |
2013 | 8225 | 0.0 | 0.0 | 0.0 |
2014 | 8516 | 0.0 | 0.0 | 0.0 |
2015 | 6658 | 0.0 | 0.0 | 0.0 |
For data sources see[5]