If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0504263606000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.357724,"lon":-113.674599,"icon":""}]} |
Location: 00/06-36-050-26W4/0 | |
Location Alias: 00/06-36-50-26 W4M | |
Location Alias 2: 00/06-36-050-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 4 | |
Range: 26 | |
Section: 36 | |
County/Municipality: Edmonton | |
Well Name: IMPERIAL LEDUC NO. 230 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0000864 | |
License Date: 1949-11-07 | |
License Status: Re-Entered | |
Spud Date: 1949-11-10 | |
Final Drill Date: 1949-12-08 | |
Well Total Depth: 1614.80 m | |
Surface Hole Latitude: 53.357724 | |
Surface Hole Longitude: -113.674599 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1949-11-07 | Obtained License |
1949-11-30 | Drill Stem Test Performed |
1949-12-03 | Liner Casing Operation Performed |
1949-12-08 | Finished Drilling |
1949-12-08 | Well Mode changed to Drilled and Cased |
1949-12-12 | Perforation Treatment Performed - Bullet Perforation |
1949-12-13 | Perforation Treatment Performed - Acid Wash - No Pressure |
1949-12-14 | Perforation Treatment Performed - Bullet Perforation |
1949-12-14 | Perforation Treatment Performed - Jet Perforation |
1949-12-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1949-12-16 | Well Began Production |
1949-12-16 | Well Fluid changed to Crude Oil |
1949-12-16 | Well Mode changed to Flowing |
1979-09-04 | Well Fluid changed to Crude Oil |
1979-09-04 | Well Mode changed to Pumping |
1984-09-19 | Well Log Performed |
1984-09-20 | Perforation Treatment Performed - Cement Squeeze |
1984-09-25 | Well Log Performed |
1984-09-26 | Perforation Treatment Performed - Jet Perforation |
1984-09-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-10-04 | Perforation Treatment Performed - Cement Squeeze |
1984-10-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1984-10-09 | Perforation Treatment Performed - Jet Perforation |
1989-12-05 | Well Fluid changed to Crude Oil |
1989-12-05 | Well Mode changed to Suspended |
1996-10-31 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-10-31 | Perforation Treatment Performed - Jet Perforation |
1996-10-31 | Plug Back Performed |
1996-10-31 | Well Fluid changed to Crude Oil |
1996-10-31 | Well Log Performed |
1996-10-31 | Well Mode changed to Abandoned Zone |
1997-03-25 | Perforation Treatment Performed - Remedial Casing |
1997-06-04 | Well Abandoned |
1997-06-04 | Well Fluid changed to Crude Oil |
1997-06-04 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-12-12 | Bullet Perforation | 1611.20 | 1612.70 | 7 |
1984-10-09 | Perforation | 1610.20 | 1610.40 | 13 |
1984-10-09 | Acid Treatment | 1610.20 | 1610.40 | 0 |
1996-10-31 | Packing Device Capped w/Cement | 1592.00 | 1600.00 | 0 |
1996-10-31 | Packing Device Capped w/Cement | 1192.00 | 1200.00 | 0 |
1996-10-31 | Perforation | 160.00 | 161.00 | 13 |
1997-03-25 | Remedial Casing Cementing | 160.00 | 161.00 | 0 |
1949-12-13 | Acid Wash | 1611.20 | 1612.70 | 0 |
1949-12-14 | Bullet Perforation | 1610.60 | 1612.70 | 20 |
1949-12-14 | Perforation | 1610.60 | 1612.10 | 7 |
1949-12-15 | Acid Treatment | 1610.60 | 1612.70 | 0 |
1984-09-20 | Cement Squeeze | 1610.60 | 1612.70 | 0 |
1984-09-26 | Perforation | 1609.90 | 1610.10 | 13 |
1984-09-27 | Acid Treatment | 1609.90 | 1610.10 | 0 |
1984-10-04 | Cement Squeeze | 1609.90 | 1610.10 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 6433 | 0.0 | 0.0 | 0.0 |
1969 | 264 | 0.0 | 0.0 | 0.0 |
1970 | 1884 | 0.0 | 0.0 | 0.0 |
1971 | 96 | 0.0 | 0.0 | 0.0 |
1972 | 5228 | 0.0 | 0.0 | 0.0 |
1973 | 7880 | 0.0 | 0.0 | 0.0 |
1974 | 7538 | 0.0 | 0.0 | 0.0 |
1975 | 7215 | 0.0 | 0.0 | 0.0 |
1976 | 8547 | 0.0 | 0.0 | 0.0 |
1977 | 8515 | 0.0 | 0.0 | 0.0 |
1978 | 8379 | 0.0 | 0.0 | 0.0 |
1979 | 8187 | 0.0 | 0.0 | 0.0 |
1980 | 8482 | 0.0 | 0.0 | 0.0 |
1981 | 8080 | 0.0 | 0.0 | 0.0 |
1982 | 7708 | 0.0 | 0.0 | 0.0 |
1983 | 8579 | 0.0 | 0.0 | 0.0 |
1984 | 5930 | 0.0 | 0.0 | 0.0 |
1985 | 7575 | 0.0 | 0.0 | 0.0 |
1986 | 8502 | 0.0 | 0.0 | 0.0 |
1987 | 6809 | 0.0 | 0.0 | 0.0 |
1988 | 6501 | 0.0 | 0.0 | 0.0 |
1989 | 5374 | 0.0 | 0.0 | 0.0 |
For data sources see[5]