X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263613000

Well Details

Well ID: 0504263613000
Loading map...
Location: 00/13-36-050-26W4/0
Location Alias: 00/13-36-50-26 W4M
Location Alias 2: 00/13-36-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 36
County/Municipality: Edmonton
Well Name: IMPERIAL LEDUC NO. 249
Operator Name: Imperial Oil Resources Limited
License Number: 0001279
License Date: 1950-03-20
License Status: RecCertified
Spud Date: 1950-04-30
Final Drill Date: 1950-07-08
Well Total Depth: 1627.00 m
Surface Hole Latitude: 53.363803
Surface Hole Longitude: -113.680752

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-03-20 Obtained License
1950-04-30 Direction Drilling Operation Performed - 98
1950-06-12 Drill Stem Test Performed
1950-06-14 Drill Stem Test Performed
1950-07-04 Liner Casing Operation Performed
1950-07-08 Finished Drilling
1950-07-08 Well Mode changed to Drilled and Cased
1950-07-12 Perforation Treatment Performed - Acid Wash - No Pressure
1950-07-12 Perforation Treatment Performed - Jet Perforation
1950-07-13 Well Began Production
1950-07-13 Well Fluid changed to Crude Oil
1950-07-13 Well Mode changed to Flowing
1972-06-20 Well Fluid changed to Crude Oil
1972-06-20 Well Mode changed to Pumping
1981-09-17 Perforation Treatment Performed - Cement Squeeze
1981-09-18 Perforation Treatment Performed - Jet Perforation
1981-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-15 Perforation Treatment Performed - Cement Squeeze
1984-05-17 Well Log Performed
1984-05-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-05-18 Perforation Treatment Performed - Jet Perforation
1989-11-01 Well Fluid changed to Crude Oil
1989-11-01 Well Mode changed to Suspended
1992-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-01 Plug Back Performed
1992-06-01 Well Log Performed
1992-06-02 Perforation Treatment Performed - Jet Perforation
1992-06-02 Well Log Performed
1992-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-03 Perforation Treatment Performed - Remedial Casing
1992-06-03 Well Fluid changed to Crude Oil
1992-06-03 Well Mode changed to Abandoned and Re-entered
1992-06-09 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1950-04-30 1214.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-07-12 Perforation 1623.70 1625.20 13
1992-06-01 Packing Device Capped w/Cement 1555.00 1563.00 0
1992-06-02 Perforation 237.00 237.50 13
1992-06-03 Remedial Casing Cementing 237.00 237.50 0
1992-06-03 Packing Device Capped w/Cement 207.50 220.00 0
1950-07-12 Acid Wash 1623.70 1625.20 0
1981-09-17 Cement Squeeze 1623.70 1625.20 0
1981-09-18 Perforation 1621.80 1621.90 10
1981-09-22 Acid Treatment 1621.80 1621.90 0
1984-05-15 Cement Squeeze 1621.80 1621.90 0
1984-05-18 Perforation 1620.00 1620.10 3
1984-05-18 Acid Treatment 1620.00 1620.10 0
1992-06-01 Packing Device Capped w/Cement 1595.00 1603.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 3257 0.0 0.0 0.0
1968 3666 0.0 0.0 0.0
1969 1176 0.0 0.0 0.0
1970 2236 0.0 0.0 0.0
1971 3242 0.0 0.0 0.0
1972 3624 0.0 0.0 0.0
1973 8240 0.0 0.0 0.0
1974 7999 0.0 0.0 0.0
1975 8117 0.0 0.0 0.0
1976 8220 0.0 0.0 0.0
1977 7419 0.0 0.0 0.0
1978 1512 0.0 0.0 0.0
1981 1904 0.0 0.0 0.0
1982 8595 0.0 0.0 0.0
1983 2112 0.0 0.0 0.0
1984 4789 0.0 0.0 0.0
1985 6912 0.0 0.0 0.0
1986 8205 0.0 0.0 0.0
1987 8426 0.0 0.0 0.0
1988 8356 0.0 0.0 0.0
1989 6272 0.0 0.0 0.0

For data sources see[6]

References