X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0504263614030

Well Details

Well ID: 0504263614030
Loading map...
Location: 03/14-36-050-26W4/0
Location Alias: 03/14-36-50-26 W4M
Location Alias 2: 03/14-36-050-26 W4/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 4
Range: 26
Section: 36
County/Municipality: Edmonton
Well Name: NEP HZ 103 LEDUC-WB 14-36-50-26
Operator Name: NEP Canada ULC
License Number: 0468586
License Date: 2014-07-29
License Status: Amended
Spud Date: 2014-09-27
Final Drill Date: 2014-10-05
Well Total Depth: 2974.00 m
Surface Hole Latitude: 53.351441
Surface Hole Longitude: -113.672981

For data sources see[1][2]

Well History

Date Event
2014-07-29 Obtained License
2014-09-28 Surface Casing Operation Performed
2014-09-30 Direction Drilling Operation Performed - Deviate
2014-10-02 Direction Drilling Operation Performed - Horizontal
2014-10-02 Well Log Performed
2014-10-03 Intermediate Casing Operation Performed
2014-10-05 Finished Drilling
2014-10-05 Well Log Performed
2014-10-07 Liner Casing Operation Performed
2014-10-07 Rig Released
2014-10-07 Well Mode changed to Drilled and Cased
2014-11-10 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-11 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-12 Perforation Treatment Performed - Multi-Stage Fracture
2014-11-21 Well Log Performed
2014-12-06 Well Began Production
2014-12-06 Well Fluid changed to Crude Oil
2014-12-06 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-09-27 Savanna Drilling Corp. 426 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-09-30 1245.90 Deviate (5 - 79 degrees)
2014-10-02 1615.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-11-10 Multi-Stage Fracture 2914.90 2915.00 0
2014-11-11 Multi-Stage Fracture 2244.70 2244.80 0
2014-11-11 Multi-Stage Fracture 2171.40 2171.50 0
2014-11-11 Multi-Stage Fracture 2084.50 2084.60 0
2014-11-11 Multi-Stage Fracture 2060.00 2060.10 0
2014-11-11 Multi-Stage Fracture 2025.40 2025.50 0
2014-11-11 Multi-Stage Fracture 2015.00 2015.10 0
2014-11-11 Multi-Stage Fracture 1938.10 1938.20 0
2014-11-11 Multi-Stage Fracture 1837.10 1837.20 0
2014-11-12 Multi-Stage Fracture 1737.20 1737.30 0
2014-11-10 Multi-Stage Fracture 2827.50 2827.60 0
2014-11-10 Multi-Stage Fracture 2740.40 2740.50 0
2014-11-10 Multi-Stage Fracture 2653.20 2653.30 0
2014-11-10 Multi-Stage Fracture 2593.60 2593.70 0
2014-11-10 Multi-Stage Fracture 2492.50 2492.60 0
2014-11-10 Multi-Stage Fracture 2391.40 2391.50 0
2014-11-10 Multi-Stage Fracture 2318.10 2318.20 0
2014-11-11 Multi-Stage Fracture 2305.00 2305.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-11-10 2014-11-12 1,511 2,982 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.7664 N/A
Sand (20/40) Canyon Aluminum Oxide 1344-28-1 100 8.6446 N/A
Crystalline silica. quartz 14808-60-7 100 8.6446 N/A
Iron Oxide 1309-37-1 100 8.6446 N/A
Titanium Oxide 13463-67-7 100 8.6446 N/A
SiberProp (20/40) Canyon Crystalline silica. quartz 14808-60-7 100 3.3193 N/A
Phenol formaldehyde resin 9003-35-4 100 3.3193 N/A
HCL 15% Canyon Acid Hydrogen Chloride 7647-01-0 100 1.3006 N/A
Water 7732-18-5 100 1.3006 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.0137 N/A
Water 7732-18-5 100 0.0137 N/A
CAN-2300 Breaker (Enzyme HpH. 25L:1L) Canyon Breaker Cellulase Enzyme Solution Not Available 100 0.0411 N/A
Water 7732-18-5 100 0.0411 N/A
CAN-2321 Breaker (Oxidizer Delayed HT) Canyon Breaker Ammonium Persulfate 7727-54-0 100 0.0178 N/A
Crystalline silica. quartz 14808-60-7 100 0.0178 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Clay Control No hazardous ingredients Not Available 100 0.0949 N/A
CAN-1000 Corrosion Inhibitor Canyon Corrosion Inhibitor Refer to MSDS 8141 100 0.0063 N/A
CAN-2200 Crosslinker / pH buffer (Borate) Canyon Crosslinker Boric Acid 10043-35-3 100 0.2472 N/A
Monoethanolamine 141-43-5 100 0.2472 N/A
Water 7732-18-5 100 0.2472 N/A
CAN-1200 Anti-Sludge Agent / Non-Emulsifier Canyon Demulsifier Refer to MSDS 8251 100 0.0114 N/A
CAN-2000 Gellant (Guar) Canyon Gelling Agent Polysacharide Suspension Not Available 100 0.4244 N/A
CAN-1101 Iron Control Reduction Canyon Iron Control 2-Mercaptoethanol 60-24-2 100 0.0173 N/A
Cupric Chloride 7447-39-4 100 0.0173 N/A
Monoethanolamine 141-43-5 100 0.0173 N/A
CAN-1202 Acid Wetting Agent Canyon Surfactant 1-Methoxy-2-Propanol 107-98-2 100 0.0122 N/A
Water 7732-18-5 100 0.0122 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.0821 N/A
Methanol 67-56-1 100 0.0821 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.0821 N/A
Water 7732-18-5 100 0.0821 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-11-07 2014-11-09 Municipal Water 2982

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 599 0.0 0.0 0.0
2015 8331 0.0 0.0 0.0
2016 8752 0.0 0.0 0.0
2017 7711 0.0 0.0 0.0
2018 8438 0.0 0.0 0.0
2019 8645 0.0 0.0 0.0
2020 2040 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-07 No Incident Encountered 0.00 0.00
2014-11-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References