X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505010901000

Well Details

Well ID: 0505010901000
Loading map...
Location: 00/01-09-050-01W5/0
Location Alias: 00/01-09-50-01 W5M
Location Alias 2: 00/01-09-050-01 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 01
Section: 09
County/Municipality: Leduc County
Well Name: BLACKSPUR THORSBY LEDUC-WB 1-9-50-1
Operator Name: Blackspur Oil Corp.
License Number: 0472210
License Date: 2014-11-27
License Status: Issued
Spud Date: 2015-07-05
Final Drill Date: 2015-07-13
Well Total Depth: 2971.00 m
Surface Hole Latitude: 53.293624
Surface Hole Longitude: -114.101371

For data sources see[1][2]

Well History

Date Event
2014-11-27 Obtained License
2015-07-05 Surface Casing Operation Performed
2015-07-07 Direction Drilling Operation Performed - Deviate
2015-07-08 Direction Drilling Operation Performed - Horizontal
2015-07-09 Intermediate Casing Operation Performed
2015-07-13 Finished Drilling
2015-07-13 Well Mode changed to Drilled and Cased
2015-07-14 Liner Casing Operation Performed
2015-07-15 Rig Released
2015-07-31 Well Log Performed
2015-08-04 Well Fluid changed to Crude Oil
2015-08-04 Well Mode changed to Drilling and Completing
2015-08-06 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-07 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-01 Well Began Production
2015-10-01 Well Fluid changed to Crude Oil
2015-10-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-07-05 Bonanza Drilling Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-07-07 1084.70 Deviate (5 - 79 degrees)
2015-07-08 1500.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-08-06 Multi-Stage Fracture 2939.10 2939.20 0
2015-08-07 Multi-Stage Fracture 2368.70 2368.80 0
2015-08-07 Multi-Stage Fracture 2296.30 2296.40 0
2015-08-07 Multi-Stage Fracture 2237.40 2237.50 0
2015-08-07 Multi-Stage Fracture 2178.60 2178.70 0
2015-08-07 Multi-Stage Fracture 2106.20 2106.30 0
2015-08-07 Multi-Stage Fracture 2047.30 2047.40 0
2015-08-07 Multi-Stage Fracture 1974.80 1974.90 0
2015-08-07 Multi-Stage Fracture 1902.40 1902.50 0
2015-08-07 Multi-Stage Fracture 1843.50 1843.60 0
2015-08-07 Multi-Stage Fracture 1771.10 1771.20 0
2015-08-06 Multi-Stage Fracture 2880.20 2880.30 0
2015-08-07 Multi-Stage Fracture 1712.20 1712.30 0
2015-08-07 Multi-Stage Fracture 1653.30 1653.40 0
2015-08-07 Multi-Stage Fracture 1594.40 1594.50 0
2015-08-06 Multi-Stage Fracture 2821.30 2821.40 0
2015-08-06 Multi-Stage Fracture 2762.40 2762.50 0
2015-08-06 Multi-Stage Fracture 2693.00 2693.10 0
2015-08-06 Multi-Stage Fracture 2629.30 2629.40 0
2015-08-07 Multi-Stage Fracture 2570.40 2570.50 0
2015-08-07 Multi-Stage Fracture 2498.00 2498.10 0
2015-08-07 Multi-Stage Fracture 2427.70 2427.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-06 2015-08-07 1,362 1,631 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 69.6837 N/A
Sand 16/30 Trican silica crystalline 14808-60-7 100 16.8012 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 12.8021 N/A
SiberProp 16/30 Trican silica crystalline 14808-60-7 100 5.9699 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0097 N/A
dibromoacetonitrile 3252-43-5 100 0.0097 N/A
non-hazardous ingredients Not Available 100 0.0097 N/A
polyethylene glycol 25322-68-3 100 0.0097 N/A
sodium bromide 7647-15-6 100 0.0097 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0147 N/A
CC-6 Trican Clay Control choline chloride 67-48-1 100 0.1258 N/A
formic acid 64-18-6 100 0.1258 N/A
non-hazardous ingredients Not Available 100 0.1258 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.1407 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1407 N/A
DF-1 Trican Defoamer non-hazardous ingredients Not Available 100 0.0051 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0682 N/A
propylene glycol 57-55-6 100 0.0682 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.1975 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-07-31 2015-08-02 Surface Water - Runoff 2096

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2206 0.0 0.0 0.0
2016 6006 0.0 0.0 0.0
2017 8042 0.0 0.0 0.0
2018 8607 0.0 0.0 0.0
2019 8348 0.0 0.0 0.0
2020 2138 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-07-15 No Incident Encountered 0.00 0.00
2015-08-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References