X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505040108020

Well Details

Well ID: 0505040108020
Loading map...
Location: 02/08-01-050-04W5/0
Location Alias: 02/08-01-50-04 W5M
Location Alias 2: 02/08-01-050-04 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 04
Section: 01
County/Municipality: Leduc County
Well Name: JOURNEY PEMBINA 8-1-50-4
Operator Name: Journey Energy Inc.
License Number: 0093152
License Date: 1981-11-06
License Status: Suspension
Spud Date: 1981-11-07
Final Drill Date: 1981-11-18
Well Total Depth: 1657.00 m
Surface Hole Latitude: 53.283678
Surface Hole Longitude: -114.445477

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-11-06 Obtained License
1981-11-18 Finished Drilling
1981-11-18 Well Mode changed to Drilled and Cased
1981-11-22 Drill Stem Test Performed
1981-11-23 Production Casing Operation Performed
1982-03-03 Perforation Treatment Performed - Cement Squeeze
1982-03-03 Perforation Treatment Performed - Jet Perforation
1982-03-06 Perforation Treatment Performed - Jet Perforation
1982-08-06 Well Began Production
1982-08-06 Well Fluid changed to Crude Oil
1982-08-06 Well Mode changed to Flowing
1985-05-05 Well Began Injection
1985-05-05 Well Fluid changed to Water
1985-05-05 Well Type changed to Injection
1989-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-01 Well Fluid changed to Water
1999-01-01 Well Mode changed to Suspended
1999-01-01 Well Type changed to Injection
2009-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-01 Plug Back Performed
2009-03-01 Well Fluid changed to Water
2009-03-01 Well Log Performed
2009-03-01 Well Mode changed to Abandoned Zone
2009-03-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-03-03 Perforation 1610.00 1610.30 4
1982-03-03 Cement Squeeze 1610.00 1610.30 0
1982-03-06 Perforation 1595.50 1597.00 13
1989-12-09 Acid Treatment 1595.50 1597.00 0
2009-03-01 Packing Device Capped w/Cement 1579.00 1587.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 2556 0.0 0.0 0.0
1983 5367 0.0 0.0 0.0
1984 6483 0.0 0.0 0.0
1985 1289 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0

For data sources see[5]

References