X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505040316000

Well Details

Well ID: 0505040316000
Loading map...
Location: 00/16-03-050-04W5/0
Location Alias: 00/16-03-50-04 W5M
Location Alias 2: 00/16-03-050-04 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 04
Section: 03
County/Municipality: Leduc County
Well Name: ESSO PCP PEMBINA 16-3-50-4
Operator Name: Eclipse Resources Ltd.
License Number: 0092656
License Date: 1981-10-08
License Status: Abandoned
Spud Date: 1981-10-17
Final Drill Date: 1981-11-08
Well Total Depth: 1675.00 m
Surface Hole Latitude: 53.290915
Surface Hole Longitude: -114.490944

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-10-08 Obtained License
1981-10-17 Lost Circulation Occurred
1981-10-21 Drill Stem Test Performed
1981-10-25 Drill Stem Test Performed
1981-10-29 Drill Stem Test Performed
1981-11-01 Drill Stem Test Performed
1981-11-03 Drill Stem Test Performed
1981-11-05 Drill Stem Test Performed
1981-11-06 Drill Stem Test Performed
1981-11-07 Drill Stem Test Performed
1981-11-08 Finished Drilling
1981-11-08 Well Mode changed to Drilled and Cased
1981-11-09 Well Log Performed
1981-11-10 Production Casing Operation Performed
1981-11-28 Perforation Treatment Performed - Fractured
1981-11-28 Perforation Treatment Performed - Jet Perforation
1982-02-07 Perforation Treatment Performed - Cement Squeeze
1982-02-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-02-08 Perforation Treatment Performed - Jet Perforation
1982-02-09 Perforation Treatment Performed - Fractured
1982-03-05 Well Began Production
1982-03-05 Well Fluid changed to Crude Oil
1982-03-05 Well Mode changed to Pumping
1982-03-23 Perforation Treatment Performed - Cement Squeeze
1983-01-01 Well Fluid changed to Crude Oil
1983-01-01 Well Mode changed to Suspended
1995-07-01 Well Fluid changed to Crude Oil
1995-07-01 Well Mode changed to Pumping
1998-03-03 Well Fluid changed to Crude Oil
1998-03-03 Well Mode changed to Suspended
1999-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-26 Perforation Treatment Performed - Jet Perforation
1999-11-26 Plug Back Performed
1999-11-26 Well Fluid changed to Crude Oil
1999-11-26 Well Log Performed
1999-11-26 Well Mode changed to Abandoned Zone
1999-11-28 Perforation Treatment Performed - Fractured
1999-11-30 Perforation Treatment Performed - Jet Perforation
1999-11-30 Well Log Performed
2009-09-30 Perforation Treatment Performed - Cement Plug
2009-09-30 Plug Back Performed
2009-10-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-01 Perforation Treatment Performed - Jet Perforation
2009-10-01 Well Log Performed
2009-10-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-03 Perforation Treatment Performed - Jet Perforation
2009-10-03 Well Log Performed
2009-10-05 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-11-28 Perforation 1620.00 1622.00 7
1982-02-07 Cement Squeeze 1620.00 1639.50 4
1982-02-08 Perforation 1620.50 1621.50 4
1982-02-08 Perforation 1608.00 1609.00 4
1982-02-08 Acid Treatment 1608.00 1609.00 0
1982-02-09 Fracture 1608.00 1621.50 0
1982-03-23 Cement Squeeze 1608.00 1609.00 0
1999-11-26 Packing Device Capped w/Cement 1587.00 1595.00 0
1999-11-26 Perforation 733.50 736.00 17
1999-11-28 Fracture 733.50 736.00 0
1999-11-30 Perforation 588.00 591.50 17
1981-11-28 Perforation 1623.50 1625.50 7
1999-11-30 Perforation 594.00 596.00 14
1999-11-30 Perforation 644.00 666.00 17
1999-11-30 Perforation 698.00 699.00 17
1999-11-30 Perforation 702.00 704.00 17
1999-11-30 Perforation 756.50 759.50 14
2009-09-30 Cement Plug 525.10 781.00 0
2009-10-01 Perforation 470.00 471.00 14
2009-10-01 Packing Device Capped w/Cement 448.00 457.00 0
2009-10-03 Perforation 350.00 351.00 14
2009-10-03 Packing Device Capped w/Cement 319.00 340.00 0
1981-11-28 Perforation 1626.50 1627.50 7
1981-11-28 Perforation 1628.00 1629.50 7
1981-11-28 Perforation 1631.00 1633.00 7
1981-11-28 Perforation 1634.50 1635.50 7
1981-11-28 Perforation 1636.00 1637.00 7
1981-11-28 Perforation 1638.00 1639.50 7
1981-11-28 Fracture 1620.00 1639.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1149 0.0 0.0 0.0
1995 2976 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-10-17 Lost Circulation 200.00 200.00

For data sources see[6]

References