If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0505041603000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.309611,"lon":-114.503705,"icon":""}]} |
| Location: 00/03-16-050-04W5/0 | |
| Location Alias: 00/03-16-50-04 W5M | |
| Location Alias 2: 00/03-16-050-04 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 5 | |
| Range: 04 | |
| Section: 16 | |
| County/Municipality: Leduc County | |
| Well Name: NEW STAR HZ HIGHVALE 3-16-50-4 | |
| Operator Name: New Star Energy Ltd. | |
| License Number: 0477853 | |
| License Date: 2015-11-23 | |
| License Status: Issued | |
| Spud Date: 2015-11-29 | |
| Final Drill Date: 2015-12-09 | |
| Well Total Depth: 3077.00 m | |
| Surface Hole Latitude: 53.309611 | |
| Surface Hole Longitude: -114.503705 |
| Date | Event |
|---|---|
| 2015-11-23 | Obtained License |
| 2015-11-30 | Surface Casing Operation Performed |
| 2015-12-02 | Direction Drilling Operation Performed - Deviate |
| 2015-12-03 | Direction Drilling Operation Performed - Horizontal |
| 2015-12-05 | Intermediate Casing Operation Performed |
| 2015-12-09 | Finished Drilling |
| 2015-12-09 | Well Mode changed to Drilled and Cased |
| 2015-12-10 | Well Log Performed |
| 2015-12-11 | Rig Released |
| 2015-12-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-12-16 | Perforation Treatment Performed - Open-Hole Completion |
| 2015-12-19 | Well Began Production |
| 2015-12-19 | Well Fluid changed to Crude Oil |
| 2015-12-19 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2015-11-29 | Nabors Drilling Limited | 26 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-12-02 | 1357.60 | Deviate (5 - 79 degrees) |
| 2015-12-03 | 1722.10 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-12-16 | Open Hole/Barefoot Completion | 1755.00 | 3077.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2782.00 | 2792.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2752.00 | 2762.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2722.00 | 2732.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2692.00 | 2702.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2662.00 | 2672.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2632.00 | 2642.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2602.00 | 2612.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2572.00 | 2582.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2542.00 | 2552.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2512.00 | 2522.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 3016.00 | 3026.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2482.00 | 2492.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2452.00 | 2462.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2422.00 | 2432.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2392.00 | 2402.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2362.00 | 2372.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2332.00 | 2342.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2302.00 | 2312.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2272.00 | 2282.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2242.00 | 2252.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2212.00 | 2222.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2992.00 | 3002.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2182.00 | 2192.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2152.00 | 2162.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2122.00 | 2132.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2092.00 | 2102.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2062.00 | 2072.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2032.00 | 2042.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2002.00 | 2012.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 1972.00 | 1982.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 1942.00 | 1952.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 1912.00 | 1922.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2962.00 | 2972.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 1882.00 | 1892.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 1852.00 | 1862.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 1822.00 | 1832.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 1794.00 | 1804.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 1762.00 | 1772.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2932.00 | 2942.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2902.00 | 2912.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2872.00 | 2882.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2842.00 | 2852.00 | 0 |
| 2015-12-16 | Multi-Stage Fracture | 2812.00 | 2822.00 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-12-16 | 2015-12-16 | 1,609 | 178 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Non-Hazardous Ingredients | Trade Secret | 100 | 49.3944 | N/A | |||
| Water | Not Available | 100 | 50.4975 | N/A | ||||
| DWP-949 | Calfrac | Demulsifier | Ethoxylated alcohols | 8300 | 100 | 0.0296 | N/A | |
| Ethoxylated phenolic resin | 8300 | 100 | 0.0296 | N/A | ||||
| Isobutyl ketone | 8300 | 100 | 0.0296 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.0296 | N/A | ||||
| Organic acid salts 1 | 8300 | 100 | 0.0296 | N/A | ||||
| Organic acid salts 2 | 8300 | 100 | 0.0296 | N/A | ||||
| Organic acid salts 3 | 8300 | 100 | 0.0296 | N/A | ||||
| DWP-602 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 1.0913 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-12-22 | 2015-12-27 | Central Water Distribution Facility | 195 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 489 | 0.0 | 0.0 | 0.0 |
| 2016 | 8468 | 0.0 | 0.0 | 0.0 |
| 2017 | 8578 | 0.0 | 0.0 | 0.0 |
| 2018 | 7835 | 0.0 | 0.0 | 0.0 |
| 2019 | 1946 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-12-11 | No Incident Encountered | 0.00 | 0.00 |
| 2015-12-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]