X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505043206000

Well Details

Well ID: 0505043206000
Loading map...
Location: 00/06-32-050-04W5/0
Location Alias: 00/06-32-50-04 W5M
Location Alias 2: 00/06-32-050-04 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 04
Section: 32
County/Municipality: Parkland County
Well Name: ANDEX ET AL HIGHVALE 6-32-50-4
Operator Name: New Star Energy Ltd.
License Number: 0101026
License Date: 1983-03-17
License Status: Issued
Spud Date: 1983-03-21
Final Drill Date: 1983-03-28
Well Total Depth: 1660.00 m
Surface Hole Latitude: 53.356692
Surface Hole Longitude: -114.555068

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-03-17 Obtained License
1983-03-28 Finished Drilling
1983-03-28 Well Mode changed to Drilled and Cased
1983-03-29 Drill Stem Test Performed
1983-03-30 Production Casing Operation Performed
1983-04-18 Perforation Treatment Performed - Jet Perforation
1983-04-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-04-19 Well Began Production
1983-04-19 Well Fluid changed to Crude Oil
1983-04-19 Well Mode changed to Pumping
1991-02-16 Perforation Treatment Performed - Acid Wash - No Pressure
1991-02-16 Perforation Treatment Performed - Jet Perforation
1991-02-16 Well Log Performed
1991-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-13 Well Log Performed
1997-12-14 Perforation Treatment Performed - Jet Perforation
1997-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-04-18 Perforation 1592.50 1595.50 13
1983-04-19 Acid Treatment 1592.50 1595.50 0
1991-02-16 Perforation 1596.50 1600.00 13
1991-02-16 Acid Wash 1592.50 1600.00 0
1991-02-17 Acid Treatment 1592.50 1600.00 0
1997-12-14 Perforation 1592.50 1595.50 16
1997-12-14 Perforation 1596.50 1600.00 16
1997-12-15 Acid Treatment 1592.50 1600.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 5373 0.0 0.0 0.0
1984 6669 0.0 0.0 0.0
1985 7340 0.0 0.0 0.0
1986 8200 0.0 0.0 0.0
1987 8250 0.0 0.0 0.0
1988 8388 0.0 0.0 0.0
1989 8671 0.0 0.0 0.0
1990 8213 0.0 0.0 0.0
1991 8573 0.0 0.0 0.0
1992 8441 0.0 0.0 0.0
1993 8733 0.0 0.0 0.0
1994 8734 0.0 0.0 0.0
1995 8601 0.0 0.0 0.0
1996 8764 0.0 0.0 0.0
1997 8496 0.0 0.0 0.0
1998 8619 0.0 0.0 0.0
1999 8362 0.0 0.0 0.0
2000 8738 0.0 0.0 0.0
2001 8416 0.0 0.0 0.0
2002 7199 0.0 0.0 0.0
2003 7788 0.0 0.0 0.0
2004 6985 0.0 0.0 0.0
2005 8288 0.0 0.0 0.0
2006 8399 0.0 0.0 0.0
2007 5379 0.0 0.0 0.0
2008 6544 0.0 0.0 0.0
2009 2112 0.0 0.0 0.0
2010 3596 0.0 0.0 0.0
2011 8705 0.0 0.0 0.0
2012 7910 0.0 0.0 0.0
2013 8300 0.0 0.0 0.0
2014 8667 0.0 0.0 0.0
2015 8431 0.0 0.0 0.0
2016 8728 0.0 0.0 0.0
2017 8015 0.0 0.0 0.0
2018 8487 0.0 0.0 0.0
2019 8487 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References