If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0505090909000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.30521,"lon":-115.273953,"icon":""}]} |
| Location: 00/09-09-050-09W5/0 | |
| Location Alias: 00/09-09-50-09 W5M | |
| Location Alias 2: 00/09-09-050-09 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 5 | |
| Range: 09 | |
| Section: 09 | |
| County/Municipality: Brazeau County | |
| Well Name: RIDGEBACK PEMBINA 9-9-50-9 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0427272 | |
| License Date: 2010-12-08 | |
| License Status: Issued | |
| Spud Date: 2011-01-12 | |
| Final Drill Date: 2011-01-20 | |
| Well Total Depth: 3109.00 m | |
| Surface Hole Latitude: 53.305210 | |
| Surface Hole Longitude: -115.273953 |
| Date | Event |
|---|---|
| 2010-12-08 | Obtained License |
| 2011-01-13 | Surface Casing Operation Performed |
| 2011-01-15 | Direction Drilling Operation Performed - Horizontal |
| 2011-01-16 | Well Log Performed |
| 2011-01-20 | Finished Drilling |
| 2011-01-20 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-01-20 | Well Log Performed |
| 2011-01-20 | Well Mode changed to Drilled and Cased |
| 2011-01-22 | Liner Casing Operation Performed |
| 2011-01-22 | Production Casing Operation Performed |
| 2011-01-22 | Rig Released |
| 2011-01-29 | Well Log Performed |
| 2011-02-21 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-02-22 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-02-22 | Well Began Production |
| 2011-02-22 | Well Fluid changed to Crude Oil |
| 2011-02-22 | Well Mode changed to Flowing |
| 2017-04-01 | Well Fluid changed to Crude Oil |
| 2017-04-01 | Well Mode changed to Pumping |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-01-15 | 1175.80 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-01-20 | Open Hole/Barefoot Completion | 3105.00 | 3109.00 | 0 |
| 2011-02-21 | Multi-Stage Fracture | 2537.20 | 2537.30 | 0 |
| 2011-02-21 | Multi-Stage Fracture | 2463.00 | 2463.10 | 0 |
| 2011-02-21 | Multi-Stage Fracture | 2400.40 | 2400.50 | 0 |
| 2011-02-22 | Multi-Stage Fracture | 2337.60 | 2337.70 | 0 |
| 2011-02-22 | Multi-Stage Fracture | 2264.60 | 2264.70 | 0 |
| 2011-02-22 | Multi-Stage Fracture | 2204.00 | 2204.10 | 0 |
| 2011-02-22 | Multi-Stage Fracture | 2133.00 | 2133.10 | 0 |
| 2011-02-22 | Multi-Stage Fracture | 2070.60 | 2070.70 | 0 |
| 2011-02-22 | Multi-Stage Fracture | 1997.60 | 1997.70 | 0 |
| 2011-02-22 | Multi-Stage Fracture | 1936.40 | 1936.50 | 0 |
| 2011-02-21 | Multi-Stage Fracture | 3070.80 | 3070.90 | 0 |
| 2011-02-22 | Multi-Stage Fracture | 1864.40 | 1864.50 | 0 |
| 2011-02-22 | Multi-Stage Fracture | 1792.40 | 1792.50 | 0 |
| 2011-02-21 | Multi-Stage Fracture | 3002.30 | 3002.40 | 0 |
| 2011-02-21 | Multi-Stage Fracture | 2941.00 | 2941.10 | 0 |
| 2011-02-21 | Multi-Stage Fracture | 2868.70 | 2868.80 | 0 |
| 2011-02-21 | Multi-Stage Fracture | 2806.70 | 2806.80 | 0 |
| 2011-02-21 | Multi-Stage Fracture | 2733.50 | 2733.60 | 0 |
| 2011-02-21 | Multi-Stage Fracture | 2671.50 | 2671.60 | 0 |
| 2011-02-21 | Multi-Stage Fracture | 2599.10 | 2599.20 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 6251 | 0.0 | 0.0 | 0.0 |
| 2012 | 8502 | 0.0 | 0.0 | 0.0 |
| 2013 | 8517 | 0.0 | 0.0 | 0.0 |
| 2014 | 8531 | 0.0 | 0.0 | 0.0 |
| 2015 | 8207 | 0.0 | 0.0 | 0.0 |
| 2016 | 8549 | 0.0 | 0.0 | 0.0 |
| 2017 | 7246 | 0.0 | 0.0 | 0.0 |
| 2018 | 8509 | 0.0 | 0.0 | 0.0 |
| 2019 | 8537 | 0.0 | 0.0 | 0.0 |
| 2020 | 2167 | 0.0 | 0.0 | 0.0 |
For data sources see[6]