X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505091506030

Well Details

Well ID: 0505091506030
Loading map...
Location: 03/06-15-050-09W5/0
Location Alias: 03/06-15-50-09 W5M
Location Alias 2: 03/06-15-050-09 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 09
Section: 15
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 6-15-50-9
Operator Name: Ridgeback Resources Inc.
License Number: 0457735
License Date: 2013-06-26
License Status: Issued
Spud Date: 2013-08-20
Final Drill Date: 2013-08-29
Well Total Depth: 3800.00 m
Surface Hole Latitude: 53.311550
Surface Hole Longitude: -115.272725

For data sources see[1][2]

Well History

Date Event
2013-06-26 Obtained License
2013-08-22 Surface Casing Operation Performed
2013-08-24 Direction Drilling Operation Performed - Deviate
2013-08-26 Direction Drilling Operation Performed - Horizontal
2013-08-29 Finished Drilling
2013-08-29 Well Mode changed to Drilled and Cased
2013-08-30 Well Log Performed
2013-08-31 Production Casing Operation Performed
2013-09-01 Perforation Treatment Performed - Open-Hole Completion
2013-09-01 Rig Released
2013-09-06 Well Log Performed
2013-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2013-09-17 Well Began Production
2013-09-17 Well Fluid changed to Crude Oil
2013-09-17 Well Mode changed to Flowing
2013-09-24 Well Log Performed
2013-10-19 Well Fluid changed to Crude Oil
2013-10-19 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-08-20 Precision Drilling Corporation 403 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-08-24 1156.80 Deviate (5 - 79 degrees)
2013-08-26 1800.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-09-01 Open Hole/Barefoot Completion 3701.00 3800.00 0
2013-09-16 Multi-Stage Fracture 3029.70 3029.80 0
2013-09-16 Multi-Stage Fracture 2968.00 2968.10 0
2013-09-16 Multi-Stage Fracture 2893.50 2893.60 0
2013-09-16 Multi-Stage Fracture 2833.20 2833.30 0
2013-09-16 Multi-Stage Fracture 2758.20 2758.30 0
2013-09-16 Multi-Stage Fracture 2698.50 2698.60 0
2013-09-16 Multi-Stage Fracture 2623.40 2623.50 0
2013-09-16 Multi-Stage Fracture 2563.60 2563.70 0
2013-09-16 Multi-Stage Fracture 2488.60 2488.70 0
2013-09-16 Multi-Stage Fracture 2428.00 2428.10 0
2013-09-16 Multi-Stage Fracture 3645.40 3645.50 0
2013-09-16 Multi-Stage Fracture 2352.50 2352.60 0
2013-09-16 Multi-Stage Fracture 2290.80 2290.90 0
2013-09-16 Multi-Stage Fracture 2216.80 2216.90 0
2013-09-16 Multi-Stage Fracture 2156.00 2156.10 0
2013-09-16 Multi-Stage Fracture 2080.60 2080.70 0
2013-09-16 Multi-Stage Fracture 2019.40 2019.50 0
2013-09-16 Multi-Stage Fracture 1944.20 1944.30 0
2013-09-16 Multi-Stage Fracture 1885.80 1885.90 0
2013-09-16 Multi-Stage Fracture 3569.00 3569.10 0
2013-09-16 Multi-Stage Fracture 3509.50 3509.60 0
2013-09-16 Multi-Stage Fracture 3434.10 3434.20 0
2013-09-16 Multi-Stage Fracture 3372.80 3372.90 0
2013-09-16 Multi-Stage Fracture 3297.80 3297.90 0
2013-09-16 Multi-Stage Fracture 3164.00 3164.10 0
2013-09-16 Multi-Stage Fracture 3103.80 3103.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-09-16 2013-09-16 1,516 2,647 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 80.0673 N/A
20/40 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 13.3945 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 3.7667 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.3495 N/A
Tolcide PS75LT Calfrac Bactericide/Biocide Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) 55566-30-8 100 0.0133 N/A
Water 7732-18-5 100 0.0142 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.1881 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.0865 N/A
Ethoxylated phenolic resin 8300 100 0.0898 N/A
Isobutyl ketone 8300 100 0.087 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1117 N/A
Organic acid salts 1 8300 100 0.0865 N/A
Organic acid salts 2 8300 100 0.0887 N/A
Organic acid salts 3 8300 100 0.0898 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 2.9057 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0635 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-09-16 2013-09-16 Surface Water - Lake 2600

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 1740 0.0 0.0 0.0
2014 8424 0.0 0.0 0.0
2015 8127 0.0 0.0 0.0
2016 8615 0.0 0.0 0.0
2017 8712 0.0 0.0 0.0
2018 8149 0.0 0.0 0.0
2019 8430 0.0 0.0 0.0
2020 2136 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-09-01 No Incident Encountered 0.00 0.00
2013-09-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References