X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505091708002

Well Details

Well ID: 0505091708002
Loading map...
Location: 00/08-17-050-09W5/2
Location Alias: 00/08-17-50-09 W5M
Location Alias 2: 00/08-17-050-09 W5/02
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 09
Section: 17
County/Municipality: Brazeau County
Well Name: RIDGEBACK PEMBINA 5-17-50-9
Operator Name: Ridgeback Resources Inc.
License Number: 0440218
License Date: 2011-12-02
License Status: Amended
Spud Date: 2012-01-04
Final Drill Date: 2012-01-24
Well Total Depth: 3113.80 m
Surface Hole Latitude: 53.311561
Surface Hole Longitude: -115.296509

For data sources see[1][2]

Well History

Date Event
2011-12-02 Obtained License
2012-01-05 Surface Casing Operation Performed
2012-01-13 Direction Drilling Operation Performed - Horizontal
2012-01-17 Well Log Performed
2012-01-24 Finished Drilling
2012-01-24 Well Log Performed
2012-01-24 Well Mode changed to Drilled and Cased
2012-01-25 Perforation Treatment Performed - Open-Hole Completion
2012-01-25 Production Casing Operation Performed
2012-01-25 Rig Released
2012-02-03 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-04 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-06 Well Began Production
2012-02-06 Well Fluid changed to Crude Oil
2012-02-06 Well Mode changed to Flowing
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-01-13 1610.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-25 Open Hole/Barefoot Completion 3111.60 3113.80 0
2012-02-03 Multi-Stage Fracture 2552.30 2552.40 0
2012-02-03 Multi-Stage Fracture 2479.20 2479.30 0
2012-02-03 Multi-Stage Fracture 2420.80 2420.90 0
2012-02-03 Multi-Stage Fracture 2347.60 2347.70 0
2012-02-04 Multi-Stage Fracture 2275.40 2275.50 0
2012-02-04 Multi-Stage Fracture 2218.80 2218.90 0
2012-02-04 Multi-Stage Fracture 2146.50 2146.60 0
2012-02-04 Multi-Stage Fracture 2074.80 2074.90 0
2012-02-04 Multi-Stage Fracture 2017.20 2017.30 0
2012-02-04 Multi-Stage Fracture 1946.80 1946.90 0
2012-02-03 Multi-Stage Fracture 3084.80 3084.90 0
2012-02-04 Multi-Stage Fracture 1876.00 1876.10 0
2012-02-04 Multi-Stage Fracture 1818.40 1818.50 0
2012-02-03 Multi-Stage Fracture 3018.10 3018.20 0
2012-02-03 Multi-Stage Fracture 2944.80 2944.90 0
2012-02-03 Multi-Stage Fracture 2885.80 2885.90 0
2012-02-03 Multi-Stage Fracture 2813.50 2813.60 0
2012-02-03 Multi-Stage Fracture 2755.50 2755.60 0
2012-02-03 Multi-Stage Fracture 2685.10 2685.20 0
2012-02-03 Multi-Stage Fracture 2611.90 2612.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7465 0.0 0.0 0.0
2013 8590 0.0 0.0 0.0
2014 8581 0.0 0.0 0.0
2015 8068 0.0 0.0 0.0
2016 8615 0.0 0.0 0.0
2017 8498 0.0 0.0 0.0
2018 8386 0.0 0.0 0.0
2019 8418 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References