If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505093413000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.364791,"lon":-115.241427,"icon":""}]} |
Location: 00/13-34-050-09W5/0 | |
Location Alias: 00/13-34-50-09 W5M | |
Location Alias 2: 00/13-34-050-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 09 | |
Section: 34 | |
County/Municipality: Brazeau County | |
Well Name: HUBER PEMBINA 13-34-50-9 | |
Operator Name: J. M. Huber Corporation | |
License Number: 0084350 | |
License Date: 1980-07-22 | |
License Status: RecCertified | |
Spud Date: 1980-07-31 | |
Final Drill Date: 1980-08-15 | |
Well Total Depth: 1500.00 m | |
Surface Hole Latitude: 53.364791 | |
Surface Hole Longitude: -115.241427 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1980-07-22 | Obtained License |
1980-07-31 | Lost Circulation Occurred |
1980-08-15 | Finished Drilling |
1980-08-15 | Well Log Performed |
1980-08-16 | Drill Stem Test Performed |
1980-08-17 | Production Casing Operation Performed |
1980-09-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1980-09-11 | Perforation Treatment Performed - Jet Perforation |
1980-09-17 | Perforation Treatment Performed - Fractured |
1980-10-15 | Well Mode changed to Drilled and Cased |
1988-12-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-12-23 | Plug Back Performed |
1988-12-23 | Well Abandoned |
1988-12-23 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1980-09-11 | Perforation | 1458.50 | 1460.00 | 7 |
1980-09-11 | Perforation | 1461.50 | 1463.00 | 7 |
1980-09-11 | Perforation | 1463.50 | 1464.50 | 7 |
1980-09-11 | Perforation | 1470.00 | 1471.00 | 0 |
1980-09-11 | Acid Treatment | 1458.50 | 1471.00 | 0 |
1980-09-17 | Fracture | 1458.50 | 1471.00 | 0 |
1988-12-23 | Packing Device Capped w/Cement | 1439.00 | 1450.00 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1980-07-31 | Lost Circulation | 69.00 | 116.00 |
For data sources see[5]