If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0505102404000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.326694,"lon":-115.315496,"icon":""}]} |
| Location: 00/04-24-050-10W5/0 | |
| Location Alias: 00/04-24-50-10 W5M | |
| Location Alias 2: 00/04-24-050-10 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 5 | |
| Range: 10 | |
| Section: 24 | |
| County/Municipality: Brazeau County | |
| Well Name: CLEARVIEW PEMBINA 4-24-50-10 | |
| Operator Name: Clearview Resources Ltd. | |
| License Number: 0433968 | |
| License Date: 2011-06-02 | |
| License Status: Amended | |
| Spud Date: 2011-09-28 | |
| Final Drill Date: 2011-10-10 | |
| Well Total Depth: 3123.00 m | |
| Surface Hole Latitude: 53.326694 | |
| Surface Hole Longitude: -115.315496 |
| Date | Event |
|---|---|
| 2011-06-02 | Obtained License |
| 2011-09-30 | Surface Casing Operation Performed |
| 2011-10-02 | Direction Drilling Operation Performed - Horizontal |
| 2011-10-03 | Well Log Performed |
| 2011-10-05 | Intermediate Casing Operation Performed |
| 2011-10-10 | Finished Drilling |
| 2011-10-10 | Well Log Performed |
| 2011-10-10 | Well Mode changed to Drilled and Cased |
| 2011-10-13 | Liner Casing Operation Performed |
| 2011-10-14 | Perforation Treatment Performed - Open-Hole Completion |
| 2011-10-14 | Rig Released |
| 2011-11-05 | Well Log Performed |
| 2011-11-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-11-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-11-12 | Well Began Production |
| 2011-11-12 | Well Fluid changed to Crude Oil |
| 2011-11-12 | Well Mode changed to Pumping |
| 2020-03-31 | Well Fluid changed to Crude Oil |
| 2020-03-31 | Well Mode changed to Suspended |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-10-02 | 1330.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-10-14 | Open Hole/Barefoot Completion | 3117.00 | 3123.00 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2565.30 | 2565.40 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2492.90 | 2493.00 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2419.90 | 2420.00 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2359.10 | 2359.20 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2287.60 | 2287.70 | 0 |
| 2011-11-10 | Multi-Stage Fracture | 2214.90 | 2215.00 | 0 |
| 2011-11-10 | Multi-Stage Fracture | 2154.60 | 2154.70 | 0 |
| 2011-11-10 | Multi-Stage Fracture | 2081.10 | 2081.20 | 0 |
| 2011-11-10 | Multi-Stage Fracture | 2021.60 | 2021.70 | 0 |
| 2011-11-10 | Multi-Stage Fracture | 1950.20 | 1950.30 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3107.70 | 3107.80 | 0 |
| 2011-11-10 | Multi-Stage Fracture | 1877.00 | 1877.10 | 0 |
| 2011-11-10 | Multi-Stage Fracture | 1830.00 | 1830.10 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 3045.40 | 3045.50 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2977.80 | 2977.90 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2909.00 | 2909.10 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2841.30 | 2841.40 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2761.40 | 2761.50 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2693.60 | 2693.70 | 0 |
| 2011-11-09 | Multi-Stage Fracture | 2625.90 | 2626.00 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 843 | 0.0 | 0.0 | 0.0 |
| 2012 | 8320 | 0.0 | 0.0 | 0.0 |
| 2013 | 8309 | 0.0 | 0.0 | 0.0 |
| 2014 | 8205 | 0.0 | 0.0 | 0.0 |
| 2015 | 8099 | 0.0 | 0.0 | 0.0 |
| 2016 | 8312 | 0.0 | 0.0 | 0.0 |
| 2017 | 5542 | 0.0 | 0.0 | 0.0 |
| 2018 | 7891 | 0.0 | 0.0 | 0.0 |
| 2019 | 6479 | 0.0 | 0.0 | 0.0 |
For data sources see[6]