If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0505102605000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.341829,"lon":-115.340394,"icon":""}]} |
| Location: 00/05-26-050-10W5/0 | |
| Location Alias: 00/05-26-50-10 W5M | |
| Location Alias 2: 00/05-26-050-10 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 5 | |
| Range: 10 | |
| Section: 26 | |
| County/Municipality: Brazeau County | |
| Well Name: CLEARVIEW PEMBINA 5-26-50-10 | |
| Operator Name: Clearview Resources Ltd. | |
| License Number: 0440349 | |
| License Date: 2011-12-05 | |
| License Status: Issued | |
| Spud Date: 2012-01-04 | |
| Final Drill Date: 2012-01-19 | |
| Well Total Depth: 3064.00 m | |
| Surface Hole Latitude: 53.341829 | |
| Surface Hole Longitude: -115.340394 |
| Date | Event |
|---|---|
| 2011-12-05 | Obtained License |
| 2012-01-04 | Lost Circulation Occurred |
| 2012-01-06 | Surface Casing Operation Performed |
| 2012-01-06 | Well Log Performed |
| 2012-01-09 | Direction Drilling Operation Performed - Horizontal |
| 2012-01-09 | Well Log Performed |
| 2012-01-11 | Intermediate Casing Operation Performed |
| 2012-01-19 | Finished Drilling |
| 2012-01-19 | Well Mode changed to Drilled and Cased |
| 2012-01-20 | Well Log Performed |
| 2012-01-22 | Liner Casing Operation Performed |
| 2012-01-23 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-01-23 | Rig Released |
| 2012-01-31 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-02-01 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-02-03 | Well Began Production |
| 2012-02-03 | Well Fluid changed to Crude Oil |
| 2012-02-03 | Well Mode changed to Pumping |
| 2020-03-31 | Well Fluid changed to Crude Oil |
| 2020-03-31 | Well Mode changed to Suspended |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-01-04 | Canelson Drilling Inc. | 7 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-01-09 | 1692.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-01-23 | Open Hole/Barefoot Completion | 3059.00 | 3064.00 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2490.50 | 2490.60 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2423.50 | 2423.60 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2351.60 | 2351.70 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2278.70 | 2278.80 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2206.80 | 2206.90 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2133.70 | 2133.80 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2075.20 | 2075.30 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 2003.30 | 2003.40 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 1932.50 | 1932.60 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 1859.40 | 1859.50 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 3049.70 | 3049.80 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 1786.70 | 1786.80 | 0 |
| 2012-02-01 | Multi-Stage Fracture | 1740.30 | 1740.40 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2982.90 | 2983.00 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2912.80 | 2912.90 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2840.80 | 2840.90 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2768.30 | 2768.40 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2695.30 | 2695.40 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2636.00 | 2636.10 | 0 |
| 2012-01-31 | Multi-Stage Fracture | 2564.00 | 2564.10 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 2188 | 0.0 | 0.0 | 0.0 |
| 2013 | 4429 | 0.0 | 0.0 | 0.0 |
| 2014 | 4476 | 0.0 | 0.0 | 0.0 |
| 2015 | 4764 | 0.0 | 0.0 | 0.0 |
| 2016 | 4656 | 0.0 | 0.0 | 0.0 |
| 2017 | 4272 | 0.0 | 0.0 | 0.0 |
| 2018 | 4608 | 0.0 | 0.0 | 0.0 |
| 2019 | 5472 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-01-04 | Lost Circulation | 211.00 | 397.00 |
For data sources see[8]