If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0505111401020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.307907,"lon":-115.516268,"icon":""}]} |
Location: 02/01-14-050-11W5/0 | |
Location Alias: 02/01-14-50-11 W5M | |
Location Alias 2: 02/01-14-050-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 050 | |
Meridian: 5 | |
Range: 11 | |
Section: 14 | |
County/Municipality: Brazeau County | |
Well Name: WHITECAP PEMBINA 1-14-50-11 | |
Operator Name: Whitecap Resources Inc. | |
License Number: 0456202 | |
License Date: 2013-04-02 | |
License Status: Amended | |
Spud Date: 2013-06-06 | |
Final Drill Date: 2013-06-13 | |
Well Total Depth: 3307.00 m | |
Surface Hole Latitude: 53.307907 | |
Surface Hole Longitude: -115.516268 |
Date | Event |
---|---|
2013-04-02 | Obtained License |
2013-06-08 | Surface Casing Operation Performed |
2013-06-09 | Direction Drilling Operation Performed - Deviate |
2013-06-11 | Direction Drilling Operation Performed - Horizontal |
2013-06-11 | Well Log Performed |
2013-06-13 | Finished Drilling |
2013-06-13 | Well Mode changed to Drilled and Cased |
2013-06-14 | Production Casing Operation Performed |
2013-06-14 | Well Log Performed |
2013-06-15 | Perforation Treatment Performed - Open-Hole Completion |
2013-06-15 | Rig Released |
2013-08-01 | Well Began Production |
2013-08-01 | Well Fluid changed to Crude Oil |
2013-08-01 | Well Mode changed to Pumping |
2013-08-06 | Well Log Performed |
2013-08-15 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-06-06 | Nabors Drilling Limited | 25 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-06-09 | 1079.00 | Deviate (5 - 79 degrees) |
2013-06-11 | 1878.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-06-15 | Open Hole/Barefoot Completion | 3299.00 | 3307.00 | 0 |
2013-08-15 | Multi-Stage Fracture | 2552.50 | 2552.60 | 0 |
2013-08-15 | Multi-Stage Fracture | 2460.70 | 2460.80 | 0 |
2013-08-15 | Multi-Stage Fracture | 2368.90 | 2369.00 | 0 |
2013-08-15 | Multi-Stage Fracture | 2277.60 | 2277.70 | 0 |
2013-08-15 | Multi-Stage Fracture | 2197.90 | 2198.00 | 0 |
2013-08-15 | Multi-Stage Fracture | 2106.50 | 2106.60 | 0 |
2013-08-15 | Multi-Stage Fracture | 2014.90 | 2015.00 | 0 |
2013-08-15 | Multi-Stage Fracture | 3254.90 | 3255.00 | 0 |
2013-08-15 | Multi-Stage Fracture | 3170.50 | 3170.60 | 0 |
2013-08-15 | Multi-Stage Fracture | 3078.80 | 3078.90 | 0 |
2013-08-15 | Multi-Stage Fracture | 2987.00 | 2987.10 | 0 |
2013-08-15 | Multi-Stage Fracture | 2907.40 | 2907.50 | 0 |
2013-08-15 | Multi-Stage Fracture | 2815.60 | 2815.70 | 0 |
2013-08-15 | Multi-Stage Fracture | 2724.00 | 2724.10 | 0 |
2013-08-15 | Multi-Stage Fracture | 2632.20 | 2632.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-08-15 | 2013-08-15 | 1,695 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Flowback Water | Not Available | 100 | 3.9703 | N/A | |||
Fresh water mix | Not Available | 100 | 82.9439 | N/A | ||||
Slickwater; N002 | Schlumberger | Crystalline silica | 14808-60-7 | 100 | 8.3354 | N/A | ||
Potash | Fluid Experts | Clay Control | Potassium Chloride | 7447-40-7 | 100 | 1.3858 | N/A | |
Sodium Chloride | 8028-77-1 | 100 | 0.0139 | N/A | ||||
Slickwater; N002 | Schlumberger | Energizing Fluid | 2-methyl-2h-isothiazol-3-one | 2682-20-4 | 100 | 0 | N/A | |
5-chloro-2-methyl-2h-isothiazolol-3-one | 26172-55-4 | 100 | 0.0001 | N/A | ||||
Acetic acid | 64-19-7 | 100 | 0 | N/A | ||||
Acetic acid; potassium salt | 127-08-2 | 100 | 0 | N/A | ||||
Acrylamide; 2-acrylamido-2-methylpropanesulfonic acid; sodiu |
38193-60-1 | 100 | 0.0076 | N/A | ||||
Alcohol; C11-14; ethoxylated | 78330-21-9 | 100 | 0.0007 | N/A | ||||
Alcohols; C9-11-iso-; C10-rich | 68526-85-2 | 100 | 0.0007 | N/A | ||||
Cristobalite | 14464-46-1 | 100 | 0 | N/A | ||||
Diatomaceous earth; calcined | 91053-39-3 | 100 | 0.0014 | N/A | ||||
Dicoco dimethyl quaternary ammonium chloride | 61789-77-3 | 100 | 0.0008 | N/A | ||||
Distillates (petroleum); hydrotreated light | 64742-47-8 | 100 | 0.0069 | N/A | ||||
Magnesium chloride | 7786-30-3 | 100 | 0.0001 | N/A | ||||
Magnesium nitrate | 10377-60-3 | 100 | 0.0002 | N/A | ||||
Nitrogen; liquid form | 7727-37-9 | 100 | 3.3065 | N/A | ||||
Polyethylene glycol monohexyl ether | 31726-34-8 | 100 | 0.0203 | N/A | ||||
Potassium hydroxide | 1310-58-3 | 100 | 0 | N/A | ||||
Propan-2-ol | 67-63-0 | 100 | 0.0001 | N/A | ||||
Sodium chloride | 7647-14-5 | 100 | 0.0033 | N/A | ||||
Sorbitan monooleate; ethoxylated | 9005-65-6 | 100 | 0.0003 | N/A | ||||
Sorbitan; (Z)-9-octadecenoate (2:3) | 8007-43-0 | 100 | 0.0005 | N/A | ||||
Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 100 | 0 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-08-14 | 2013-08-14 | Recycled Fracturing Water (treated at well site) | 148 |
2013-08-07 | 2013-08-18 | Central Water Distribution Facility | 2971 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 1900 | 0.0 | 0.0 | 0.0 |
2014 | 8016 | 0.0 | 0.0 | 0.0 |
2015 | 8424 | 0.0 | 0.0 | 0.0 |
2016 | 8745 | 0.0 | 0.0 | 0.0 |
2017 | 8693 | 0.0 | 0.0 | 0.0 |
2018 | 8715 | 0.0 | 0.0 | 0.0 |
2019 | 8093 | 0.0 | 0.0 | 0.0 |
2020 | 2175 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-06-15 | No Incident Encountered | 0.00 | 0.00 |
2013-09-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]