If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0505120108020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.271382,"lon":-115.619803,"icon":""}]} |
| Location: 02/08-01-050-12W5/0 | |
| Location Alias: 02/08-01-50-12 W5M | |
| Location Alias 2: 02/08-01-050-12 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 5 | |
| Range: 12 | |
| Section: 01 | |
| County/Municipality: Yellowhead County | |
| Well Name: RIDGEBACK PEMBINA 8-1-50-12 | |
| Operator Name: Ridgeback Resources Inc. | |
| License Number: 0445461 | |
| License Date: 2012-04-23 | |
| License Status: Issued | |
| Spud Date: 2012-07-12 | |
| Final Drill Date: 2012-07-23 | |
| Well Total Depth: 3416.50 m | |
| Surface Hole Latitude: 53.271382 | |
| Surface Hole Longitude: -115.619803 |
| Date | Event |
|---|---|
| 2012-04-23 | Obtained License |
| 2012-07-08 | Well Log Performed |
| 2012-07-14 | Surface Casing Operation Performed |
| 2012-07-14 | Well Log Performed |
| 2012-07-16 | Direction Drilling Operation Performed - Deviate |
| 2012-07-17 | Direction Drilling Operation Performed - Horizontal |
| 2012-07-23 | Finished Drilling |
| 2012-07-23 | Well Log Performed |
| 2012-07-23 | Well Mode changed to Drilled and Cased |
| 2012-07-25 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-07-25 | Production Casing Operation Performed |
| 2012-07-25 | Rig Released |
| 2012-08-08 | Well Log Performed |
| 2012-08-16 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-08-17 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-08-24 | Well Began Production |
| 2012-08-24 | Well Fluid changed to Crude Oil |
| 2012-08-24 | Well Log Performed |
| 2012-08-24 | Well Mode changed to Flowing |
| 2012-10-06 | Well Fluid changed to Crude Oil |
| 2012-10-06 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-07-12 | Precision Drilling Corporation | 232 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-07-16 | 1422.40 | Deviate (5 - 79 degrees) |
| 2012-07-17 | 1957.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-07-25 | Open Hole/Barefoot Completion | 3411.00 | 3416.50 | 0 |
| 2012-08-16 | Multi-Stage Fracture | 2826.40 | 2826.50 | 0 |
| 2012-08-16 | Multi-Stage Fracture | 2764.10 | 2764.20 | 0 |
| 2012-08-16 | Multi-Stage Fracture | 2687.60 | 2687.70 | 0 |
| 2012-08-16 | Multi-Stage Fracture | 2625.40 | 2625.50 | 0 |
| 2012-08-17 | Multi-Stage Fracture | 2549.00 | 2549.10 | 0 |
| 2012-08-17 | Multi-Stage Fracture | 2486.50 | 2486.60 | 0 |
| 2012-08-17 | Multi-Stage Fracture | 2412.10 | 2412.20 | 0 |
| 2012-08-17 | Multi-Stage Fracture | 2336.80 | 2336.90 | 0 |
| 2012-08-17 | Multi-Stage Fracture | 2274.40 | 2274.50 | 0 |
| 2012-08-17 | Multi-Stage Fracture | 2198.50 | 2198.60 | 0 |
| 2012-08-16 | Multi-Stage Fracture | 3385.90 | 3386.00 | 0 |
| 2012-08-17 | Multi-Stage Fracture | 2136.30 | 2136.40 | 0 |
| 2012-08-17 | Multi-Stage Fracture | 2061.00 | 2061.10 | 0 |
| 2012-08-16 | Multi-Stage Fracture | 3316.90 | 3317.00 | 0 |
| 2012-08-16 | Multi-Stage Fracture | 3241.60 | 3241.70 | 0 |
| 2012-08-16 | Multi-Stage Fracture | 3179.60 | 3179.70 | 0 |
| 2012-08-16 | Multi-Stage Fracture | 3103.30 | 3103.40 | 0 |
| 2012-08-16 | Multi-Stage Fracture | 3040.70 | 3040.80 | 0 |
| 2012-08-16 | Multi-Stage Fracture | 2963.90 | 2964.00 | 0 |
| 2012-08-16 | Multi-Stage Fracture | 2902.20 | 2902.30 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 2618 | 0.0 | 0.0 | 0.0 |
| 2013 | 8149 | 0.0 | 0.0 | 0.0 |
| 2014 | 8554 | 0.0 | 0.0 | 0.0 |
| 2015 | 7804 | 0.0 | 0.0 | 0.0 |
| 2016 | 8469 | 0.0 | 0.0 | 0.0 |
| 2017 | 8540 | 0.0 | 0.0 | 0.0 |
| 2018 | 8337 | 0.0 | 0.0 | 0.0 |
| 2019 | 8740 | 0.0 | 0.0 | 0.0 |
| 2020 | 2172 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-07-25 | No Incident Encountered | 0.00 | 0.00 |
| 2012-08-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]