X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505122103000

Well Details

Well ID: 0505122103000
Loading map...
Location: 00/03-21-050-12W5/0
Location Alias: 00/03-21-50-12 W5M
Location Alias 2: 00/03-21-050-12 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 12
Section: 21
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 3-21-50-12
Operator Name: Ridgeback Resources Inc.
License Number: 0431644
License Date: 2011-02-16
License Status: Issued
Spud Date: 2011-02-25
Final Drill Date: 2011-03-07
Well Total Depth: 3449.00 m
Surface Hole Latitude: 53.340156
Surface Hole Longitude: -115.701689

For data sources see[1][2]

Well History

Date Event
2011-02-16 Obtained License
2011-02-26 Lost Circulation Occurred
2011-02-28 Surface Casing Operation Performed
2011-02-28 Well Log Performed
2011-03-02 Direction Drilling Operation Performed - Horizontal
2011-03-07 Finished Drilling
2011-03-07 Well Log Performed
2011-03-07 Well Mode changed to Drilled and Cased
2011-03-09 Production Casing Operation Performed
2011-03-10 Perforation Treatment Performed - Open-Hole Completion
2011-03-10 Rig Released
2011-03-12 Well Log Performed
2011-03-28 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-29 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-31 Well Began Production
2011-03-31 Well Fluid changed to Crude Oil
2011-03-31 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-03-02 1428.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-10 Open Hole/Barefoot Completion 3445.00 3449.00 0
2011-03-29 Multi-Stage Fracture 2858.60 2858.70 0
2011-03-29 Multi-Stage Fracture 2786.50 2786.60 0
2011-03-29 Multi-Stage Fracture 2729.40 2729.50 0
2011-03-29 Multi-Stage Fracture 2657.70 2657.80 0
2011-03-29 Multi-Stage Fracture 2585.90 2586.00 0
2011-03-29 Multi-Stage Fracture 2527.20 2527.30 0
2011-03-29 Multi-Stage Fracture 2455.20 2455.30 0
2011-03-29 Multi-Stage Fracture 2383.60 2383.70 0
2011-03-29 Multi-Stage Fracture 2325.30 2325.40 0
2011-03-29 Multi-Stage Fracture 2253.70 2253.80 0
2011-03-28 Multi-Stage Fracture 3380.80 3380.90 0
2011-03-29 Multi-Stage Fracture 2181.90 2182.00 0
2011-03-29 Multi-Stage Fracture 2123.90 2124.00 0
2011-03-28 Multi-Stage Fracture 3315.20 3315.30 0
2011-03-28 Multi-Stage Fracture 3257.90 3258.00 0
2011-03-28 Multi-Stage Fracture 3186.00 3186.10 0
2011-03-29 Multi-Stage Fracture 3127.80 3127.90 0
2011-03-29 Multi-Stage Fracture 3057.40 3057.50 0
2011-03-29 Multi-Stage Fracture 2988.80 2988.90 0
2011-03-29 Multi-Stage Fracture 2930.70 2930.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 4791 0.0 0.0 0.0
2012 8450 0.0 0.0 0.0
2013 8390 0.0 0.0 0.0
2014 8615 0.0 0.0 0.0
2015 7415 0.0 0.0 0.0
2016 8753 0.0 0.0 0.0
2017 8737 0.0 0.0 0.0
2018 8743 0.0 0.0 0.0
2019 8718 0.0 0.0 0.0
2020 2176 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-02-26 Lost Circulation 23.00 330.00

For data sources see[7]

References