If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0505173413000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.353223,"lon":-116.404358,"icon":""}]} |
| Location: 00/13-34-050-17W5/0 | |
| Location Alias: 00/13-34-50-17 W5M | |
| Location Alias 2: 00/13-34-050-17 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 5 | |
| Range: 17 | |
| Section: 34 | |
| County/Municipality: Yellowhead County | |
| Well Name: ROGCI ET AL HZ EDSON 13-34-50-17 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0480712 | |
| License Date: 2016-10-11 | |
| License Status: Issued | |
| Spud Date: 2016-12-03 | |
| Final Drill Date: 2016-12-22 | |
| Well Total Depth: 4342.00 m | |
| Surface Hole Latitude: 53.353223 | |
| Surface Hole Longitude: -116.404358 |
| Date | Event |
|---|---|
| 2016-10-11 | Obtained License |
| 2016-12-04 | Surface Casing Operation Performed |
| 2016-12-08 | Direction Drilling Operation Performed - Deviate |
| 2016-12-09 | Well Log Performed |
| 2016-12-10 | Intermediate Casing Operation Performed |
| 2016-12-13 | Direction Drilling Operation Performed - Horizontal |
| 2016-12-22 | Finished Drilling |
| 2016-12-22 | Perforation Treatment Performed - Open-Hole Completion |
| 2016-12-22 | Production Casing Operation Performed |
| 2016-12-22 | Well Log Performed |
| 2016-12-22 | Well Mode changed to Drilled and Cased |
| 2016-12-24 | Rig Released |
| 2017-01-25 | Well Log Performed |
| 2017-04-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-04-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-04-14 | Well Fluid changed to Gas |
| 2017-04-14 | Well Mode changed to Testing |
| 2017-05-01 | Well Began Production |
| 2017-05-01 | Well Fluid changed to Gas |
| 2017-05-01 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2016-12-03 | Trinidad Drilling Ltd. | 418 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2016-12-08 | 2490.40 | Deviate (5 - 79 degrees) |
| 2016-12-13 | 2908.50 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2016-12-22 | Open Hole/Barefoot Completion | 4323.00 | 4342.00 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3747.70 | 3747.80 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3678.30 | 3678.40 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3609.90 | 3610.00 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3553.20 | 3553.30 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3482.30 | 3482.40 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3411.30 | 3411.40 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3341.10 | 3341.20 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3271.40 | 3271.50 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3200.70 | 3200.80 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3130.20 | 3130.30 | 0 |
| 2017-04-07 | Multi-Stage Fracture | 4283.10 | 4283.20 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3073.10 | 3073.20 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3000.10 | 3000.20 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 2932.80 | 2932.90 | 0 |
| 2017-04-07 | Multi-Stage Fracture | 4228.10 | 4228.20 | 0 |
| 2017-04-07 | Multi-Stage Fracture | 4171.80 | 4171.90 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 4101.20 | 4101.30 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 4030.60 | 4030.70 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3959.60 | 3959.70 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3889.00 | 3889.10 | 0 |
| 2017-04-08 | Multi-Stage Fracture | 3818.70 | 3818.80 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-04-07 | 2017-04-08 | 2,751 | 7,406 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 82.1214 | N/A | |||
| Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 12.8945 | N/A | ||
| Sand - Tier 2 (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 1.1715 | N/A | ||
| True North RCS (30/50) | Trican | aluminum oxide | 1344-28-1 | 100 | 3.4732 | N/A | ||
| hexamethylenetetramine | 100-97-0 | 100 | 3.4733 | N/A | ||||
| silica crystalline | 14808-60-7 | 100 | 3.4732 | N/A | ||||
| titanium dioxide | 13463-67-7 | 100 | 3.4733 | N/A | ||||
| AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0097 | N/A | |
| 2-mercaptoethanol | 60-24-2 | 100 | 0.0097 | N/A | ||||
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0097 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0097 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0097 | N/A | ||||
| CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1535 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.1535 | N/A | ||||
| TriVert 1000 | Trican | Diverting Agent | non-hazardous ingredients | Not Available | 100 | 0.0053 | N/A | |
| FR-18 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0845 | N/A | |
| distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0845 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0845 | N/A | ||||
| GSI-1W | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0449 | N/A | |
| propylene glycol | 57-55-6 | 100 | 0.0449 | N/A | ||||
| S-17W | Trican | Surfactant | ethylene/propylene oxide polymer | Not Available | 100 | 0.0412 | N/A | |
| methanol | 67-56-1 | 100 | 0.0412 | N/A | ||||
| water | Not Available | 100 | 0.0412 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-02-22 | 2017-02-23 | Municipal Water | 350 |
| 2017-02-22 | 2017-02-23 | Recycled Fracturing Water (treated at well site) | 1860 |
| 2017-04-01 | 2017-04-01 | Surface Water - Runoff | 30 |
| 2017-04-06 | 2017-04-10 | Surface Water - Lake | 5500 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 5583 | 0.0 | 0.0 | 0.0 |
| 2018 | 8420 | 0.0 | 0.0 | 0.0 |
| 2019 | 7918 | 0.0 | 0.0 | 0.0 |
| 2020 | 2116 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-12-22 | No Incident Encountered | 0.00 | 0.00 |
| 2017-04-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]