X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0505173413000

Well Details

Well ID: 0505173413000
Loading map...
Location: 00/13-34-050-17W5/0
Location Alias: 00/13-34-50-17 W5M
Location Alias 2: 00/13-34-050-17 W5/00
Country: Canada
Province: Alberta
Township: 050
Meridian: 5
Range: 17
Section: 34
County/Municipality: Yellowhead County
Well Name: ROGCI ET AL HZ EDSON 13-34-50-17
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0480712
License Date: 2016-10-11
License Status: Issued
Spud Date: 2016-12-03
Final Drill Date: 2016-12-22
Well Total Depth: 4342.00 m
Surface Hole Latitude: 53.353223
Surface Hole Longitude: -116.404358

For data sources see[1][2]

Well History

Date Event
2016-10-11 Obtained License
2016-12-04 Surface Casing Operation Performed
2016-12-08 Direction Drilling Operation Performed - Deviate
2016-12-09 Well Log Performed
2016-12-10 Intermediate Casing Operation Performed
2016-12-13 Direction Drilling Operation Performed - Horizontal
2016-12-22 Finished Drilling
2016-12-22 Perforation Treatment Performed - Open-Hole Completion
2016-12-22 Production Casing Operation Performed
2016-12-22 Well Log Performed
2016-12-22 Well Mode changed to Drilled and Cased
2016-12-24 Rig Released
2017-01-25 Well Log Performed
2017-04-07 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-08 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-14 Well Fluid changed to Gas
2017-04-14 Well Mode changed to Testing
2017-05-01 Well Began Production
2017-05-01 Well Fluid changed to Gas
2017-05-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-12-03 Trinidad Drilling Ltd. 418 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-12-08 2490.40 Deviate (5 - 79 degrees)
2016-12-13 2908.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-12-22 Open Hole/Barefoot Completion 4323.00 4342.00 0
2017-04-08 Multi-Stage Fracture 3747.70 3747.80 0
2017-04-08 Multi-Stage Fracture 3678.30 3678.40 0
2017-04-08 Multi-Stage Fracture 3609.90 3610.00 0
2017-04-08 Multi-Stage Fracture 3553.20 3553.30 0
2017-04-08 Multi-Stage Fracture 3482.30 3482.40 0
2017-04-08 Multi-Stage Fracture 3411.30 3411.40 0
2017-04-08 Multi-Stage Fracture 3341.10 3341.20 0
2017-04-08 Multi-Stage Fracture 3271.40 3271.50 0
2017-04-08 Multi-Stage Fracture 3200.70 3200.80 0
2017-04-08 Multi-Stage Fracture 3130.20 3130.30 0
2017-04-07 Multi-Stage Fracture 4283.10 4283.20 0
2017-04-08 Multi-Stage Fracture 3073.10 3073.20 0
2017-04-08 Multi-Stage Fracture 3000.10 3000.20 0
2017-04-08 Multi-Stage Fracture 2932.80 2932.90 0
2017-04-07 Multi-Stage Fracture 4228.10 4228.20 0
2017-04-07 Multi-Stage Fracture 4171.80 4171.90 0
2017-04-08 Multi-Stage Fracture 4101.20 4101.30 0
2017-04-08 Multi-Stage Fracture 4030.60 4030.70 0
2017-04-08 Multi-Stage Fracture 3959.60 3959.70 0
2017-04-08 Multi-Stage Fracture 3889.00 3889.10 0
2017-04-08 Multi-Stage Fracture 3818.70 3818.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-04-07 2017-04-08 2,751 7,406 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.1214 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 12.8945 N/A
Sand - Tier 2 (40/70) Trican silica crystalline 14808-60-7 100 1.1715 N/A
True North RCS (30/50) Trican aluminum oxide 1344-28-1 100 3.4732 N/A
hexamethylenetetramine 100-97-0 100 3.4733 N/A
silica crystalline 14808-60-7 100 3.4732 N/A
titanium dioxide 13463-67-7 100 3.4733 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0097 N/A
2-mercaptoethanol 60-24-2 100 0.0097 N/A
dibromoacetonitrile 3252-43-5 100 0.0097 N/A
non-hazardous ingredients Not Available 100 0.0097 N/A
sodium bromide 7647-15-6 100 0.0097 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1535 N/A
non-hazardous ingredients Not Available 100 0.1535 N/A
TriVert 1000 Trican Diverting Agent non-hazardous ingredients Not Available 100 0.0053 N/A
FR-18 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0845 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0845 N/A
non-hazardous ingredients Not Available 100 0.0845 N/A
GSI-1W Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0449 N/A
propylene glycol 57-55-6 100 0.0449 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0412 N/A
methanol 67-56-1 100 0.0412 N/A
water Not Available 100 0.0412 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-02-22 2017-02-23 Municipal Water 350
2017-02-22 2017-02-23 Recycled Fracturing Water (treated at well site) 1860
2017-04-01 2017-04-01 Surface Water - Runoff 30
2017-04-06 2017-04-10 Surface Water - Lake 5500

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 5583 0.0 0.0 0.0
2018 8420 0.0 0.0 0.0
2019 7918 0.0 0.0 0.0
2020 2116 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-22 No Incident Encountered 0.00 0.00
2017-04-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References