If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0505200514000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.280562,"lon":-116.884525,"icon":""}]} |
| Location: 00/14-05-050-20W5/0 | |
| Location Alias: 00/14-05-50-20 W5M | |
| Location Alias 2: 00/14-05-050-20 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 5 | |
| Range: 20 | |
| Section: 05 | |
| County/Municipality: Yellowhead County | |
| Well Name: TOURMALINE HZ ANSELL 14-5-50-20 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0470708 | |
| License Date: 2014-10-17 | |
| License Status: Amended | |
| Spud Date: 2015-01-20 | |
| Final Drill Date: 2015-02-18 | |
| Well Total Depth: 4684.00 m | |
| Surface Hole Latitude: 53.280562 | |
| Surface Hole Longitude: -116.884525 |
| Date | Event |
|---|---|
| 2014-10-17 | Obtained License |
| 2015-01-22 | Surface Casing Operation Performed |
| 2015-01-29 | Intermediate Casing Operation Performed |
| 2015-02-03 | Direction Drilling Operation Performed - Deviate |
| 2015-02-07 | Direction Drilling Operation Performed - Horizontal |
| 2015-02-07 | Well Log Performed |
| 2015-02-18 | Finished Drilling |
| 2015-02-18 | Well Log Performed |
| 2015-02-18 | Well Mode changed to Drilled and Cased |
| 2015-02-22 | Production Casing Operation Performed |
| 2015-02-23 | Rig Released |
| 2015-03-02 | Well Log Performed |
| 2015-03-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-12 | Well Began Production |
| 2015-03-12 | Well Fluid changed to Gas |
| 2015-03-12 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2015-01-20 | Patterson-UTI Drilling Co. Canada | 14E | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2015-02-03 | 3006.50 | Deviate (5 - 79 degrees) |
| 2015-02-07 | 3388.70 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2015-03-06 | Multi-Stage Fracture | 4634.40 | 4634.50 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 4009.60 | 4009.70 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 3956.80 | 3956.90 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3904.00 | 3904.10 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3851.20 | 3851.30 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3798.50 | 3798.60 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3746.80 | 3746.90 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3694.10 | 3694.20 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3641.30 | 3641.40 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3588.50 | 3588.60 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3536.10 | 3536.20 | 0 |
| 2015-03-06 | Multi-Stage Fracture | 4536.80 | 4536.90 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3483.30 | 3483.40 | 0 |
| 2015-03-10 | Multi-Stage Fracture | 3430.50 | 3430.60 | 0 |
| 2015-03-06 | Multi-Stage Fracture | 4431.40 | 4431.50 | 0 |
| 2015-03-06 | Multi-Stage Fracture | 4378.70 | 4378.80 | 0 |
| 2015-03-08 | Multi-Stage Fracture | 4273.30 | 4273.40 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 4220.50 | 4220.60 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 4167.70 | 4167.80 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 4114.90 | 4115.00 | 0 |
| 2015-03-09 | Multi-Stage Fracture | 4062.20 | 4062.30 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-03-06 | 2015-03-10 | 3,290 | 5,349 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 93.8076 | N/A | |||
| Prime Plus 40/70 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 2.3432 | N/A | ||
| silica crystalline | 14808-60-7 | 100 | 2.3432 | N/A | ||||
| Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 5.0216 | N/A | ||
| Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.855 | N/A | ||
| Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0117 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0117 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0117 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.0117 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0117 | N/A | ||||
| CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.2069 | N/A | |
| water | Not Available | 100 | 0.2069 | N/A | ||||
| FR-9 | Trican | Friction Reducer | alcohols. C10-16. ethoxylated | 68002-97-1 | 100 | 0.0621 | N/A | |
| alcohols. C12-14. ethoxylated | 68439-50-9 | 100 | 0.0621 | N/A | ||||
| alcohols. C12-16. ethoxylated | 68551-12-2 | 100 | 0.0621 | N/A | ||||
| distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0621 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0621 | N/A | ||||
| GFR-1 | Trican | Friction Reducer | non-hazardous ingredients | Not Available | 100 | 0.0499 | N/A | |
| S-2 | Trican | Surfactant | 2-ethylhexanol | 104-76-7 | 100 | 0.0888 | N/A | |
| isopropanol | 67-63-0 | 100 | 0.0888 | N/A | ||||
| methanol | 67-56-1 | 100 | 0.0888 | N/A | ||||
| oxydiethylenebis(alkyldimethyl ammonium chloride) | 68607-28-3 | 100 | 0.0888 | N/A | ||||
| solvent naphtha (petroleum). heavy aromatic | 64742-94-5 | 100 | 0.0888 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-03-02 | 2015-03-09 | Recycled Fracturing Water (treated at well site) | 2460 |
| 2015-03-03 | 2015-03-10 | Recycled Fracturing Water (treated at well site) | 2100 |
| 2015-03-05 | 2015-03-09 | Recycled Fracturing Water (treated at well site) | 790 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 6216 | 0.0 | 0.0 | 0.0 |
| 2016 | 7291 | 0.0 | 0.0 | 0.0 |
| 2017 | 4455 | 0.0 | 0.0 | 0.0 |
| 2018 | 8455 | 0.0 | 0.0 | 0.0 |
| 2019 | 8732 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2015-02-18 | No Incident Encountered | 0.00 | 0.00 |
| 2015-03-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]