If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0505211909000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.33218,"lon":-117.051653,"icon":""}]} |
| Location: 00/09-19-050-21W5/0 | |
| Location Alias: 00/09-19-50-21 W5M | |
| Location Alias 2: 00/09-19-050-21 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 050 | |
| Meridian: 5 | |
| Range: 21 | |
| Section: 19 | |
| County/Municipality: Yellowhead County | |
| Well Name: TOURMALINE BANSHEE 9-19-50-21 | |
| Operator Name: Tourmaline Oil Corp. | |
| License Number: 0422575 | |
| License Date: 2010-08-12 | |
| License Status: Issued | |
| Spud Date: 2010-10-07 | |
| Final Drill Date: 2010-10-26 | |
| Well Total Depth: 3674.00 m | |
| Surface Hole Latitude: 53.332180 | |
| Surface Hole Longitude: -117.051653 |
| Date | Event |
|---|---|
| 2010-08-12 | Obtained License |
| 2010-10-09 | Surface Casing Operation Performed |
| 2010-10-15 | Well Log Performed |
| 2010-10-16 | Intermediate Casing Operation Performed |
| 2010-10-26 | Finished Drilling |
| 2010-10-26 | Well Mode changed to Drilled and Cased |
| 2010-10-27 | Well Log Performed |
| 2010-10-28 | Production Casing Operation Performed |
| 2010-10-29 | Rig Released |
| 2010-11-03 | Well Log Performed |
| 2010-11-05 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-05 | Well Log Performed |
| 2010-11-06 | Perforation Treatment Performed - Fractured |
| 2010-11-07 | Perforation Treatment Performed - Fractured |
| 2010-11-07 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-07 | Well Log Performed |
| 2010-11-08 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-08 | Well Log Performed |
| 2010-11-09 | Perforation Treatment Performed - Fractured |
| 2010-11-09 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-09 | Well Log Performed |
| 2010-11-10 | Perforation Treatment Performed - Fractured |
| 2010-11-10 | Perforation Treatment Performed - Jet Perforation |
| 2010-11-14 | Well Log Performed |
| 2011-04-06 | Well Began Production |
| 2011-04-06 | Well Fluid changed to Gas |
| 2011-04-06 | Well Mode changed to Flowing |
| 2012-07-20 | Well Fluid changed to Gas |
| 2012-07-20 | Well Mode changed to Pumping |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-11-05 | Perforation | 3654.00 | 3655.00 | 12 |
| 2010-11-08 | Perforation | 3396.50 | 3397.50 | 9 |
| 2010-11-08 | Perforation | 3378.00 | 3379.00 | 6 |
| 2010-11-09 | Fracture | 3378.00 | 3418.00 | 0 |
| 2010-11-09 | Perforation | 3350.00 | 3351.00 | 12 |
| 2010-11-09 | Perforation | 3273.50 | 3274.50 | 6 |
| 2010-11-09 | Perforation | 3253.50 | 3254.50 | 6 |
| 2010-11-09 | Perforation | 3244.50 | 3245.50 | 12 |
| 2010-11-10 | Fracture | 3244.50 | 3351.00 | 0 |
| 2010-11-10 | Perforation | 2787.50 | 2788.50 | 12 |
| 2010-11-10 | Perforation | 2779.50 | 2780.50 | 12 |
| 2010-11-05 | Perforation | 3646.00 | 3647.00 | 15 |
| 2010-11-10 | Perforation | 2774.00 | 2775.00 | 12 |
| 2010-11-10 | Fracture | 2774.00 | 2788.50 | 0 |
| 2010-11-05 | Perforation | 3615.50 | 3616.50 | 12 |
| 2010-11-06 | Fracture | 3615.50 | 3655.00 | 0 |
| 2010-11-07 | Perforation | 3569.50 | 3570.50 | 12 |
| 2010-11-07 | Perforation | 3557.00 | 3558.00 | 18 |
| 2010-11-07 | Fracture | 3557.00 | 3570.50 | 0 |
| 2010-11-08 | Perforation | 3417.00 | 3418.00 | 12 |
| 2010-11-08 | Perforation | 3403.00 | 3404.00 | 9 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 6433 | 0.0 | 0.0 | 0.0 |
| 2012 | 8497 | 0.0 | 0.0 | 0.0 |
| 2013 | 8646 | 0.0 | 0.0 | 0.0 |
| 2014 | 8069 | 0.0 | 0.0 | 0.0 |
| 2015 | 7080 | 0.0 | 0.0 | 0.0 |
| 2016 | 7803 | 0.0 | 0.0 | 0.0 |
| 2017 | 7863 | 0.0 | 0.0 | 0.0 |
| 2018 | 8404 | 0.0 | 0.0 | 0.0 |
| 2019 | 8250 | 0.0 | 0.0 | 0.0 |
| 2020 | 2087 | 0.0 | 0.0 | 0.0 |
For data sources see[5]