If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514020805D00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.387037,"lon":-110.270714,"icon":""}]} |
Location: D0/05-08-051-02W4/0 | |
Location Alias: D0/05-08-51-02 W4M | |
Location Alias 2: D0/05-08-051-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 02 | |
Section: 08 | |
County/Municipality: County of Vermilion River | |
Well Name: MOBIL-GC ET AL LLOYD 5D-8-51-2 | |
Operator Name: ExxonMobil Canada Ltd. | |
License Number: 0060459 | |
License Date: 1976-10-01 | |
License Status: RecCertified | |
Spud Date: 1976-10-01 | |
Final Drill Date: 1976-10-02 | |
Well Total Depth: 600.50 m | |
Surface Hole Latitude: 53.387037 | |
Surface Hole Longitude: -110.270714 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-10-01 | Obtained License |
1976-10-02 | Finished Drilling |
1976-10-02 | Lost Circulation Occurred |
1976-10-02 | Well Mode changed to Drilled and Cased |
1976-10-03 | Production Casing Operation Performed |
1976-10-19 | Perforation Treatment Performed - Jet Perforation |
1976-10-26 | Well Began Production |
1976-10-26 | Well Fluid changed to Crude Oil |
1976-10-26 | Well Mode changed to Pumping |
1980-09-30 | Well Fluid changed to Crude Oil |
1980-09-30 | Well Mode changed to Suspended |
1990-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1990-08-10 | Plug Back Performed |
1990-08-10 | Well Abandoned |
1990-08-10 | Well Fluid changed to Crude Oil |
1990-08-10 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-10-19 | Perforation | 577.30 | 580.90 | 13 |
1990-08-10 | Packing Device Capped w/Cement | 562.00 | 572.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 319 | 0.0 | 0.0 | 0.0 |
1977 | 7885 | 0.0 | 0.0 | 0.0 |
1978 | 2043 | 0.0 | 0.0 | 0.0 |
1979 | 538 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1976-10-02 | Lost Circulation | 455.40 | 600.50 |
For data sources see[6]