If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514032508000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.43022,"lon":-110.30161,"icon":""}]} |
Location: 00/08-25-051-03W4/0 | |
Location Alias: 00/08-25-51-03 W4M | |
Location Alias 2: 00/08-25-051-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 03 | |
Section: 25 | |
County/Municipality: County of Vermilion River | |
Well Name: CREW LLOYD 8-25-51-3 | |
Operator Name: Crew Energy Inc. | |
License Number: 0381052 | |
License Date: 2007-08-28 | |
License Status: Suspension | |
Spud Date: 2007-09-20 | |
Final Drill Date: 2007-09-22 | |
Well Total Depth: 639.00 m | |
Surface Hole Latitude: 53.430220 | |
Surface Hole Longitude: -110.301610 |
Date | Event |
---|---|
2007-08-28 | Obtained License |
2007-09-21 | Surface Casing Operation Performed |
2007-09-22 | Finished Drilling |
2007-09-22 | Well Log Performed |
2007-09-22 | Well Mode changed to Drilled and Cased |
2007-09-23 | Production Casing Operation Performed |
2007-09-23 | Rig Released |
2007-10-05 | Perforation Treatment Performed - Jet Perforation |
2007-10-05 | Well Began Production |
2007-10-05 | Well Fluid changed to Crude Oil |
2007-10-05 | Well Mode changed to Pumping |
2007-12-20 | Well Log Performed |
2008-01-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2008-01-23 | Plug Back Performed |
2008-01-23 | Well Fluid changed to Crude Oil |
2008-01-23 | Well Mode changed to Abandoned Zone |
2008-01-24 | Perforation Treatment Performed - Jet Perforation |
2008-01-24 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2007-10-05 | Perforation | 587.00 | 592.00 | 26 |
2008-01-23 | Packing Device Capped w/Cement | 577.20 | 585.20 | 0 |
2008-01-24 | Perforation | 537.00 | 539.00 | 26 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2007 | 1295 | 0.0 | 0.0 | 0.0 |
2008 | 48 | 0.0 | 0.0 | 0.0 |
For data sources see[5]