X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514080810000

Well Details

Well ID: 0514080810000
Loading map...
Location: 00/10-08-051-08W4/0
Location Alias: 00/10-08-51-08 W4M
Location Alias 2: 00/10-08-051-08 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 08
Section: 08
County/Municipality: County of Minburn No. 27
Well Name: POC MANN 10-8-51-8
Operator Name: Perpetual Operating Corp.
License Number: 0202558
License Date: 1997-06-16
License Status: Abandoned
Spud Date: 1997-06-18
Final Drill Date: 1997-06-21
Well Total Depth: 725.00 m
Surface Hole Latitude: 53.390634
Surface Hole Longitude: -111.141824

For data sources see[1][2]

Well History

Date Event
1997-06-16 Obtained License
1997-06-19 Direction Drilling Operation Performed - Deviate
1997-06-19 Surface Casing Operation Performed
1997-06-21 Finished Drilling
1997-06-21 Well Log Performed
1997-06-21 Well Mode changed to Drilled and Cased
1997-06-22 Production Casing Operation Performed
1997-06-22 Rig Released
1997-07-02 Perforation Treatment Performed - Jet Perforation
1997-07-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-03 Perforation Treatment Performed - Jet Perforation
1997-07-03 Well Log Performed
1997-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-07-04 Perforation Treatment Performed - Jet Perforation
1997-07-05 Perforation Treatment Performed - Jet Perforation
1997-07-05 Well Log Performed
1997-07-20 Well Log Performed
1997-08-10 Well Began Production
1997-08-10 Well Fluid changed to Gas
1997-08-10 Well Mode changed to Flowing
2016-12-16 Perforation Treatment Performed - Jet Perforation
2016-12-16 Well Log Performed
2016-12-30 Well Fluid changed to Gas
2016-12-30 Well Mode changed to Flowing
2019-10-31 Well Fluid changed to Gas
2019-10-31 Well Mode changed to Suspended
2020-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-11 Plug Back Performed
2020-03-11 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-06-19 155.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-07-02 Perforation 637.50 639.00 14
1997-07-03 Packing Device Capped w/Cement 634.00 636.00 0
1997-07-03 Perforation 620.00 622.00 14
1997-07-04 Packing Device Capped w/Cement 610.00 618.00 0
1997-07-04 Perforation 572.00 574.00 14
1997-07-05 Perforation 514.50 515.50 14
2016-12-16 Perforation 559.50 563.50 20
2020-03-11 Packing Device Capped w/Cement 502.00 510.00 0
2020-03-11 Packing Device Capped w/Cement 547.00 555.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3403 0.0 0.0 0.0
1998 8751 0.0 0.0 0.0
1999 8751 0.0 0.0 0.0
2000 8734 0.0 0.0 0.0
2001 8374 0.0 0.0 0.0
2002 6636 0.0 0.0 0.0
2003 8331 0.0 0.0 0.0
2004 8319 0.0 0.0 0.0
2005 8735 0.0 0.0 0.0
2006 8551 0.0 0.0 0.0
2007 8635 0.0 0.0 0.0
2008 8686 0.0 0.0 0.0
2009 6112 0.0 0.0 0.0
2010 2786 0.0 0.0 0.0
2011 6540 0.0 0.0 0.0
2012 3788 0.0 0.0 0.0
2013 5389 0.0 0.0 0.0
2014 6811 0.0 0.0 0.0
2015 6039 0.0 0.0 0.0
2016 2736 0.0 0.0 0.0
2017 3074 0.0 0.0 0.0
2018 4845 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-14 No Incident Encountered 0.00 0.00
2016-12-16 No Incident Encountered 0.00 0.00
2020-03-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References