X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514092014003

Well Details

Well ID: 0514092014003
Loading map...
Location: 00/14-20-051-09W4/3
Location Alias: 00/14-20-51-09 W4M
Location Alias 2: 00/14-20-051-09 W4/03
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 09
Section: 20
County/Municipality: County of Minburn No. 27
Well Name: POC MANN 14-20-51-9
Operator Name: Perpetual Operating Corp.
License Number: 0077998
License Date: 1979-09-13
License Status: Issued
Spud Date: 1979-09-13
Final Drill Date: 1979-09-16
Well Total Depth: 679.00 m
Surface Hole Latitude: 53.422453
Surface Hole Longitude: -111.297898

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-09-13 Obtained License
1979-09-16 Drill Stem Test Performed
1979-09-16 Finished Drilling
1979-09-16 Well Mode changed to Drilled and Cased
1979-09-19 Production Casing Operation Performed
1979-11-02 Perforation Treatment Performed - Jet Perforation
1979-11-04 Perforation Treatment Performed - Jet Perforation
1979-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-01-16 Perforation Treatment Performed - Cement Squeeze
2001-01-16 Well Log Performed
2001-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-19 Plug Back Performed
2001-01-20 Perforation Treatment Performed - Jet Perforation
2001-01-20 Well Log Performed
2001-01-24 Well Began Production
2001-01-24 Well Fluid changed to Gas
2001-01-24 Well Mode changed to Flowing
2017-06-20 Perforation Treatment Performed - Jet Perforation
2017-06-20 Well Log Performed
2017-06-23 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-11-02 Perforation 652.50 654.00 7
1979-11-04 Perforation 527.80 530.80 7
1979-11-09 Acid Treatment 527.80 530.80 0
2001-01-16 Cement Squeeze 527.80 530.80 0
2001-01-19 Packing Device Capped w/Cement 637.00 645.00 0
2001-01-20 Perforation 554.00 557.50 17
2001-01-20 Perforation 486.00 488.00 17
2017-06-20 Perforation 489.00 492.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 7886 0.0 0.0 0.0
2002 8617 0.0 0.0 0.0
2003 8539 0.0 0.0 0.0
2004 8551 0.0 0.0 0.0
2005 8755 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 5423 0.0 0.0 0.0
2010 8621 0.0 0.0 0.0
2011 8519 0.0 0.0 0.0
2012 8269 0.0 0.0 0.0
2013 8596 0.0 0.0 0.0
2014 7434 0.0 0.0 0.0
2015 6468 0.0 0.0 0.0
2016 8624 0.0 0.0 0.0
2017 3973 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-06-14 No Incident Encountered 0.00 0.00
2017-06-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References