If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514092906003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.429189,"lon":-111.296779,"icon":""}]} |
Location: 00/06-29-051-09W4/3 | |
Location Alias: 00/06-29-51-09 W4M | |
Location Alias 2: 00/06-29-051-09 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 09 | |
Section: 29 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: POC MANN 6-29-51-9 | |
Operator Name: Perpetual Operating Corp. | |
License Number: 0060774 | |
License Date: 1976-10-22 | |
License Status: Suspension | |
Spud Date: 1976-10-26 | |
Final Drill Date: 1976-10-29 | |
Well Total Depth: 660.20 m | |
Surface Hole Latitude: 53.429189 | |
Surface Hole Longitude: -111.296779 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-10-22 | Obtained License |
1976-10-29 | Finished Drilling |
1976-10-29 | Production Casing Operation Performed |
1976-10-29 | Well Mode changed to Drilled and Cased |
1976-11-22 | Perforation Treatment Performed - Jet Perforation |
1976-11-24 | Perforation Treatment Performed - Jet Perforation |
1977-01-16 | Well Began Production |
1977-01-16 | Well Fluid changed to Gas |
1977-01-16 | Well Mode changed to Flowing |
1980-08-04 | Well Fluid changed to Gas |
1980-08-04 | Well Mode changed to Suspended |
1983-07-01 | Perforation Treatment Performed - Chemical Squeeze |
1984-02-17 | Perforation Treatment Performed - Cement Squeeze |
1984-02-17 | Plug Back Performed |
1984-02-17 | Well Fluid changed to Gas |
1984-02-17 | Well Mode changed to Abandoned Zone |
1984-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2004-12-16 | Well Log Performed |
2004-12-17 | Perforation Treatment Performed - Jet Perforation |
2004-12-17 | Well Log Performed |
2005-02-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-02-11 | Perforation Treatment Performed - Jet Perforation |
2005-02-11 | Plug Back Performed |
2005-02-11 | Well Log Performed |
2005-02-13 | Perforation Treatment Performed - Remedial Casing |
2005-02-15 | Well Log Performed |
2005-02-16 | Perforation Treatment Performed - Jet Perforation |
2005-02-16 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-11-22 | Perforation | 637.60 | 638.60 | 10 |
1984-02-20 | Packing Device Capped w/Cement | 641.90 | 641.90 | 0 |
2004-12-17 | Perforation | 473.00 | 481.00 | 17 |
2005-02-11 | Packing Device Capped w/Cement | 617.00 | 625.00 | 0 |
2005-02-11 | Perforation | 339.00 | 339.30 | 36 |
2005-02-11 | Packing Device Capped w/Cement | 502.00 | 510.00 | 0 |
2005-02-11 | Packing Device Capped w/Cement | 460.00 | 468.00 | 0 |
2005-02-13 | Remedial Casing Cementing | 339.00 | 339.30 | 0 |
2005-02-16 | Perforation | 345.90 | 349.60 | 17 |
1976-11-22 | Perforation | 641.60 | 642.50 | 10 |
1976-11-24 | Perforation | 517.90 | 519.10 | 7 |
1976-11-24 | Perforation | 521.50 | 523.00 | 7 |
1976-11-24 | Perforation | 474.30 | 474.90 | 7 |
1976-11-24 | Perforation | 477.30 | 477.90 | 7 |
1976-11-24 | Perforation | 479.10 | 480.40 | 7 |
1983-07-01 | Chemical Squeeze | 517.90 | 523.00 | 0 |
1984-02-17 | Cement Squeeze | 474.30 | 480.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1977 | 1527 | 0.0 | 0.0 | 0.0 |
1978 | 6785 | 0.0 | 0.0 | 0.0 |
1979 | 7206 | 0.0 | 0.0 | 0.0 |
1980 | 4202 | 0.0 | 0.0 | 0.0 |
For data sources see[5]