If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514092914004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.436772,"lon":-111.297584,"icon":""}]} |
Location: 00/14-29-051-09W4/4 | |
Location Alias: 00/14-29-51-09 W4M | |
Location Alias 2: 00/14-29-051-09 W4/04 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 09 | |
Section: 29 | |
County/Municipality: County of Minburn No. 27 | |
Well Name: POC MANN 14-29-51-9 | |
Operator Name: Perpetual Operating Corp. | |
License Number: 0143355 | |
License Date: 1990-02-21 | |
License Status: Suspension | |
Spud Date: 1990-02-27 | |
Final Drill Date: 1990-03-01 | |
Well Total Depth: 676.00 m | |
Surface Hole Latitude: 53.436772 | |
Surface Hole Longitude: -111.297584 |
Date | Event |
---|---|
1990-02-21 | Obtained License |
1990-02-27 | Surface Casing Operation Performed |
1990-03-01 | Finished Drilling |
1990-03-01 | Well Log Performed |
1990-03-01 | Well Mode changed to Drilled and Cased |
1990-03-02 | Drill Stem Test Performed |
1990-03-02 | Production Casing Operation Performed |
1990-03-02 | Rig Released |
1990-03-11 | Well Log Performed |
1990-03-12 | Perforation Treatment Performed - Jet Perforation |
1990-03-13 | Perforation Treatment Performed - Jet Perforation |
1990-03-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-03-17 | Perforation Treatment Performed - Jet Perforation |
1990-03-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2001-04-02 | Perforation Treatment Performed - Cement Squeeze |
2001-04-02 | Plug Back Performed |
2001-04-03 | Perforation Treatment Performed - Cement Squeeze |
2001-04-03 | Plug Back Performed |
2001-04-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2001-04-06 | Perforation Treatment Performed - Jet Perforation |
2001-04-06 | Plug Back Performed |
2001-04-10 | Well Began Production |
2001-04-10 | Well Fluid changed to Gas |
2001-04-10 | Well Mode changed to Flowing |
2003-12-03 | Well Fluid changed to Gas |
2003-12-03 | Well Mode changed to Suspended |
2008-07-02 | Perforation Treatment Performed - Cement Plug |
2008-07-02 | Plug Back Performed |
2008-07-02 | Well Fluid changed to Gas |
2008-07-02 | Well Mode changed to Abandoned Zone |
2008-07-06 | Perforation Treatment Performed - Jet Perforation |
2008-07-06 | Perforation Treatment Performed - Remedial Casing |
2008-07-06 | Well Log Performed |
2008-07-07 | Well Log Performed |
2008-07-09 | Perforation Treatment Performed - Jet Perforation |
2008-07-09 | Perforation Treatment Performed - Remedial Casing |
2009-03-16 | Well Log Performed |
2017-11-25 | Perforation Treatment Performed - Jet Perforation |
2017-11-25 | Well Log Performed |
2018-02-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-02-22 | Plug Back Performed |
2018-02-23 | Well Log Performed |
2018-03-01 | Perforation Treatment Performed - Jet Perforation |
2018-03-01 | Perforation Treatment Performed - Remedial Casing |
2018-03-01 | Well Log Performed |
2018-10-26 | Well Log Performed |
2018-11-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-11-01 | Well Log Performed |
2018-11-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2018-11-02 | Perforation Treatment Performed - Jet Perforation |
2018-11-02 | Well Log Performed |
2018-11-03 | Perforation Treatment Performed - Cement Plug |
2018-11-03 | Perforation Treatment Performed - Cement Squeeze |
2018-11-03 | Perforation Treatment Performed - Jet Perforation |
2018-11-03 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-03-12 | Perforation | 506.50 | 507.30 | 13 |
2001-04-06 | Perforation | 644.50 | 646.00 | 17 |
2001-04-06 | Packing Device Capped w/Cement | 635.00 | 643.00 | 0 |
2001-04-06 | Perforation | 625.50 | 626.30 | 17 |
2008-07-02 | Cement Plug | 533.00 | 628.00 | 0 |
2008-07-06 | Perforation | 251.00 | 252.00 | 17 |
2008-07-06 | Remedial Casing Cementing | 251.00 | 252.00 | 0 |
2008-07-09 | Perforation | 177.00 | 178.00 | 17 |
2008-07-09 | Remedial Casing Cementing | 177.00 | 178.00 | 0 |
2017-11-25 | Perforation | 525.50 | 535.00 | 17 |
2018-02-22 | Packing Device Capped w/Cement | 512.00 | 520.00 | 0 |
1990-03-13 | Perforation | 502.00 | 504.00 | 13 |
2018-03-01 | Perforation | 425.00 | 426.00 | 14 |
2018-03-01 | Remedial Casing Cementing | 425.00 | 426.00 | 0 |
2018-11-01 | Packing Device Capped w/Cement | 487.00 | 495.00 | 0 |
2018-11-01 | Packing Device Capped w/Cement | 446.00 | 454.00 | 0 |
2018-11-02 | Packing Device Capped w/Cement | 411.00 | 419.00 | 0 |
2018-11-02 | Perforation | 185.00 | 186.00 | 23 |
2018-11-03 | Cement Squeeze | 185.00 | 186.00 | 0 |
2018-11-03 | Cement Plug | 175.00 | 183.00 | 0 |
2018-11-03 | Perforation | 160.00 | 160.50 | 23 |
2018-11-03 | Cement Squeeze | 160.00 | 160.50 | 0 |
1990-03-14 | Acid Treatment | 502.00 | 507.30 | 0 |
2018-11-03 | Cement Plug | 65.00 | 175.00 | 0 |
1990-03-17 | Perforation | 459.00 | 460.00 | 13 |
1990-03-17 | Perforation | 461.50 | 462.50 | 13 |
1990-03-17 | Perforation | 464.00 | 465.50 | 13 |
1990-03-19 | Acid Treatment | 459.00 | 465.50 | 0 |
2001-04-02 | Cement Squeeze | 502.00 | 507.30 | 0 |
2001-04-03 | Cement Squeeze | 459.00 | 465.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 3473 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-11-23 | No Incident Encountered | 0.00 | 0.00 |
2017-11-25 | No Incident Encountered | 0.00 | 0.00 |
2018-03-01 | No Incident Encountered | 0.00 | 0.00 |
2018-02-22 | No Incident Encountered | 0.00 | 0.00 |
2018-11-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]