X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514101410003

Well Details

Well ID: 0514101410003
Loading map...
Location: 00/10-14-051-10W4/3
Location Alias: 00/10-14-51-10 W4M
Location Alias 2: 00/10-14-051-10 W4/03
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 10
Section: 14
County/Municipality: County of Minburn No. 27
Well Name: POC MANN 10-14-51-10
Operator Name: Perpetual Operating Corp.
License Number: 0065582
License Date: 1977-09-07
License Status: Abandoned
Spud Date: 1977-09-13
Final Drill Date: 1977-09-16
Well Total Depth: 790.30 m
Surface Hole Latitude: 53.406417
Surface Hole Longitude: -111.359610

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-09-07 Obtained License
1977-09-16 Finished Drilling
1977-09-16 Well Mode changed to Drilled and Cased
1977-09-17 Drill Stem Test Performed
1977-09-20 Production Casing Operation Performed
1978-09-02 Well Log Performed
1978-09-03 Perforation Treatment Performed - Jet Perforation
1978-09-05 Perforation Treatment Performed - Jet Perforation
1986-01-10 Perforation Treatment Performed - Cement Squeeze
1986-01-10 Plug Back Performed
1986-01-13 Perforation Treatment Performed - Jet Perforation
1986-01-13 Well Log Performed
1986-01-17 Well Began Production
1986-01-17 Well Fluid changed to Gas
1986-01-17 Well Mode changed to Flowing
1986-03-01 Well Fluid changed to Gas
1986-03-01 Well Mode changed to Suspended
1989-05-26 Perforation Treatment Performed - Jet Perforation
1989-05-26 Well Log Performed
2004-12-10 Well Structure changed to Commingled
2016-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-08-07 Plug Back Performed
2016-08-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-08-08 Plug Back Performed
2016-08-08 Well Mode changed to Abandoned Zone
2016-08-08 Well Structure changed to Commingled
2016-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-08-09 Plug Back Performed
2016-08-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-09-03 Perforation 657.80 658.70 7
2016-08-08 Packing Device Capped w/Cement 553.00 561.00 0
2016-08-09 Packing Device Capped w/Cement 158.00 251.00 0
1978-09-05 Perforation 607.10 608.40 7
1986-01-10 Cement Squeeze 607.10 608.40 0
1986-01-13 Perforation 570.50 571.50 13
1986-01-13 Perforation 566.90 567.80 13
1986-01-13 Perforation 572.40 573.00 13
1989-05-26 Perforation 657.10 658.90 13
1989-05-26 Perforation 662.00 662.60 13
2016-08-07 Packing Device Capped w/Cement 643.00 651.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 315 0.0 0.0 0.0
1988 168 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-08-07 No Incident Encountered 0.00 0.00
2016-08-08 No Incident Encountered 0.00 0.00
2016-08-09 No Incident Encountered 0.00 0.00

For data sources see[6]

References