X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514111011000

Well Details

Well ID: 0514111011000
Loading map...
Location: 00/11-10-051-11W4/0
Location Alias: 00/11-10-51-11 W4M
Location Alias 2: 00/11-10-051-11 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 11
Section: 10
County/Municipality: County of Minburn No. 27
Well Name: PALOMA BIRCH 11-10-51-11
Operator Name: Sunoma Energy Corp.
License Number: 0086118
License Date: 1980-10-06
License Status: RecCertified
Spud Date: 1980-10-11
Final Drill Date: 1980-10-15
Well Total Depth: 822.00 m
Surface Hole Latitude: 53.392346
Surface Hole Longitude: -111.545130

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-10-06 Obtained License
1980-10-13 Drill Stem Test Performed
1980-10-15 Finished Drilling
1980-10-15 Well Mode changed to Drilled and Cased
1980-10-16 Drill Stem Test Performed
1980-10-16 Production Casing Operation Performed
1980-10-27 Perforation Treatment Performed - Jet Perforation
1981-01-01 Well Began Production
1981-01-01 Well Fluid changed to Gas
1981-01-01 Well Mode changed to Flowing
1981-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-06-16 Perforation Treatment Performed - Jet Perforation
1981-06-16 Well Fluid changed to Gas
1981-06-16 Well Mode changed to Abandoned Zone
1981-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-08-11 Perforation Treatment Performed - Fractured
1988-10-29 Perforation Treatment Performed - Cement Squeeze
1988-10-29 Plug Back Performed
1988-10-31 Perforation Treatment Performed - Jet Perforation
1988-10-31 Well Log Performed
1988-11-01 Perforation Treatment Performed - Jet Perforation
1988-11-03 Well Fluid changed to Gas
1988-11-03 Well Mode changed to Suspended
1988-12-01 Well Fluid changed to Gas
1988-12-01 Well Mode changed to Flowing
1989-09-30 Well Fluid changed to Gas
1989-09-30 Well Mode changed to Suspended
1989-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-10-22 Plug Back Performed
1989-10-22 Well Abandoned
1989-10-22 Well Fluid changed to Gas
1989-10-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-10-27 Perforation 644.50 645.50 14
1988-11-01 Perforation 647.00 648.50 7
1989-10-22 Packing Device Capped w/Cement 630.00 640.00 0
1989-10-22 Packing Device Capped w/Cement 590.00 600.00 0
1981-06-16 Packing Device Capped w/Cement 629.00 637.00 0
1981-06-16 Perforation 605.00 606.50 14
1981-06-16 Perforation 608.50 609.50 14
1981-06-27 Acid Treatment 605.00 609.50 0
1981-08-11 Fracture 605.00 609.50 0
1988-10-29 Cement Squeeze 605.00 609.50 0
1988-10-31 Perforation 644.50 645.50 14
1988-11-01 Perforation 644.00 646.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 2354 0.0 0.0 0.0
1988 651 0.0 0.0 0.0
1989 899 0.0 0.0 0.0

For data sources see[5]

References