X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514131911000

Well Details

Well ID: 0514131911000
Loading map...
Location: 00/11-19-051-13W4/0
Location Alias: 00/11-19-51-13 W4M
Location Alias 2: 00/11-19-051-13 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 13
Section: 19
County/Municipality: County of Minburn No. 27
Well Name: OMERS ENERGY WARWICK 11-19-51-13
Operator Name: AlphaBow Energy Ltd.
License Number: 0038717
License Date: 1970-09-03
License Status: Issued
Spud Date: 1970-09-03
Final Drill Date: 1970-09-06
Well Total Depth: 841.20 m
Surface Hole Latitude: 53.421244
Surface Hole Longitude: -111.911913

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-09-03 Obtained License
1970-09-06 Finished Drilling
1970-09-06 Well Mode changed to Drilled and Cased
1970-09-07 Drill Stem Test Performed
1970-09-07 Production Casing Operation Performed
1970-09-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-09-17 Perforation Treatment Performed - Jet Perforation
1970-09-18 Perforation Treatment Performed - Cement Squeeze
1970-09-20 Perforation Treatment Performed - Jet Perforation
1971-02-02 Well Began Production
1971-02-02 Well Fluid changed to Gas
1971-02-02 Well Mode changed to Flowing
1980-09-21 Perforation Treatment Performed - Jet Perforation
1980-09-21 Well Fluid changed to Gas
1980-09-21 Well Mode changed to Flowing
1994-09-08 Well Log Performed
1994-09-09 Well Log Performed
1994-09-10 Perforation Treatment Performed - Jet Perforation
1994-09-10 Well Fluid changed to Gas
1994-09-10 Well Log Performed
1994-09-10 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-09-17 Perforation 727.90 730.30 7
1970-09-17 Acid Treatment 727.90 730.30 0
1970-09-18 Cement Squeeze 727.90 730.30 0
1970-09-20 Perforation 758.30 760.80 7
1980-09-21 Perforation 763.20 766.40 13
1994-09-10 Perforation 758.30 761.30 13
1994-09-10 Perforation 621.80 623.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 7652 0.0 0.0 0.0
1972 8297 0.0 0.0 0.0
1973 8394 0.0 0.0 0.0
1974 8501 0.0 0.0 0.0
1975 8712 0.0 0.0 0.0
1976 8768 0.0 0.0 0.0
1977 8700 0.0 0.0 0.0
1978 7478 0.0 0.0 0.0
1979 7313 0.0 0.0 0.0
1980 5801 0.0 0.0 0.0
1981 6062 0.0 0.0 0.0
1982 7656 0.0 0.0 0.0
1983 151 0.0 0.0 0.0
1984 2922 0.0 0.0 0.0
1985 8670 0.0 0.0 0.0
1986 8646 0.0 0.0 0.0
1987 5132 0.0 0.0 0.0
1988 7219 0.0 0.0 0.0
1989 7427 0.0 0.0 0.0
1990 6301 0.0 0.0 0.0
1991 5096 0.0 0.0 0.0
1992 7782 0.0 0.0 0.0
1993 8689 0.0 0.0 0.0
1994 8636 0.0 0.0 0.0
1995 8703 0.0 0.0 0.0
1996 8781 0.0 0.0 0.0
1997 8668 0.0 0.0 0.0
1998 8724 0.0 0.0 0.0
1999 8737 0.0 0.0 0.0
2000 7912 0.0 0.0 0.0
2001 7940 0.0 0.0 0.0
2002 8622 0.0 0.0 0.0
2003 8498 0.0 0.0 0.0
2004 8638 0.0 0.0 0.0
2005 8659 0.0 0.0 0.0
2006 8659 0.0 0.0 0.0
2007 8755 0.0 0.0 0.0
2008 8780 0.0 0.0 0.0
2009 8685 0.0 0.0 0.0
2010 8657 0.0 0.0 0.0
2011 8065 0.0 0.0 0.0
2012 7855 0.0 0.0 0.0
2013 8739 0.0 0.0 0.0
2014 8629 0.0 0.0 0.0
2015 8755 0.0 0.0 0.0
2016 8759 0.0 0.0 0.0
2017 8663 0.0 0.0 0.0
2018 8282 0.0 0.0 0.0
2019 6384 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[5]

References