If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514243206000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.444884,"lon":-113.507158,"icon":""}]} |
Location: 00/06-32-051-24W4/0 | |
Location Alias: 00/06-32-51-24 W4M | |
Location Alias 2: 00/06-32-051-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 24 | |
Section: 32 | |
County/Municipality: Edmonton | |
Well Name: N.D. ELLERSLIE 6-32-51-24 | |
Operator Name: Northern Development Company Limited | |
License Number: 0003885 | |
License Date: 1951-12-01 | |
License Status: RecCertified | |
Spud Date: 1951-12-07 | |
Final Drill Date: 1952-01-30 | |
Well Total Depth: 1200.30 m | |
Surface Hole Latitude: 53.444884 | |
Surface Hole Longitude: -113.507158 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-12-01 | Obtained License |
1952-01-26 | Drill Stem Test Performed |
1952-01-29 | Drill Stem Test Performed |
1952-01-30 | Finished Drilling |
1952-01-30 | Well Mode changed to Drilled and Cased |
1952-02-01 | Drill Stem Test Performed |
1952-02-02 | Production Casing Operation Performed |
1952-02-05 | Perforation Treatment Performed - Bullet Perforation |
1952-04-22 | Perforation Treatment Performed - Cement Squeeze |
1952-04-26 | Perforation Treatment Performed - Bullet Perforation |
1952-04-29 | Well Began Production |
1952-04-29 | Well Fluid changed to Crude Oil |
1952-04-29 | Well Mode changed to Pumping |
1958-07-16 | Well Fluid changed to Crude Oil |
1958-07-16 | Well Mode changed to Suspended |
1960-12-09 | Well Fluid changed to Crude Oil |
1960-12-09 | Well Mode changed to Pumping |
1961-02-05 | Perforation Treatment Performed - Jet Perforation |
1962-10-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1968-03-22 | Well Fluid changed to Crude Oil |
1968-03-22 | Well Mode changed to Suspended |
1970-06-03 | Perforation Treatment Performed - Cement Plug |
1970-06-12 | Well Abandoned |
1970-06-12 | Well Fluid changed to Crude Oil |
1970-06-12 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1952-02-05 | Bullet Perforation | 1187.80 | 1188.40 | 20 |
1952-04-22 | Cement Squeeze | 1187.80 | 1188.40 | 20 |
1952-04-26 | Bullet Perforation | 1189.00 | 1189.00 | 13 |
1961-02-05 | Perforation | 1188.40 | 1189.30 | 13 |
1962-10-05 | Acid Treatment | 1188.40 | 1189.30 | 0 |
1970-06-03 | Cement Plug | 1173.50 | 1194.20 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]