If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514243210000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.448891,"lon":-113.501567,"icon":""}]} |
Location: 00/10-32-051-24W4/0 | |
Location Alias: 00/10-32-51-24 W4M | |
Location Alias 2: 00/10-32-051-24 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 24 | |
Section: 32 | |
County/Municipality: Edmonton | |
Well Name: N.D. ELLERSLIE 10-32-51-24 | |
Operator Name: Northern Development Company Limited | |
License Number: 0002853 | |
License Date: 1951-05-09 | |
License Status: RecCertified | |
Spud Date: 1951-05-08 | |
Final Drill Date: 1951-05-23 | |
Well Total Depth: 1199.40 m | |
Surface Hole Latitude: 53.448891 | |
Surface Hole Longitude: -113.501567 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-05-09 | Obtained License |
1951-05-20 | Drill Stem Test Performed |
1951-05-21 | Drill Stem Test Performed |
1951-05-22 | Drill Stem Test Performed |
1951-05-23 | Finished Drilling |
1951-05-23 | Production Casing Operation Performed |
1951-05-23 | Well Mode changed to Drilled and Cased |
1951-05-26 | Perforation Treatment Performed - Jet Perforation |
1951-05-27 | Well Began Production |
1951-05-27 | Well Fluid changed to Crude Oil |
1951-05-27 | Well Mode changed to Pumping |
1961-03-16 | Perforation Treatment Performed - Jet Perforation |
1961-08-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-08-12 | Perforation Treatment Performed - Cement Squeeze |
1961-08-14 | Perforation Treatment Performed - Abrasa-Jet Perforation |
1970-08-05 | Perforation Treatment Performed - Cement Plug |
1970-08-12 | Well Abandoned |
1970-08-12 | Well Fluid changed to Crude Oil |
1970-08-12 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-05-26 | Perforation | 1187.20 | 1187.80 | 13 |
1961-03-16 | Perforation | 1186.00 | 1186.90 | 13 |
1961-08-12 | Acid Treatment | 1186.00 | 1187.80 | 0 |
1961-08-12 | Cement Squeeze | 1186.00 | 1187.80 | 0 |
1961-08-14 | Hydra Jet Perforation | 1186.60 | 1186.60 | 0 |
1970-08-05 | Cement Plug | 1172.00 | 1199.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 4589 | 0.0 | 0.0 | 0.0 |
1968 | 1535 | 0.0 | 0.0 | 0.0 |
1969 | 254 | 0.0 | 0.0 | 0.0 |
For data sources see[5]