If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514243212002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.448475,"lon":-113.513232,"icon":""}]} |
Location: 00/12-32-051-24W4/2 | |
Location Alias: 00/12-32-51-24 W4M | |
Location Alias 2: 00/12-32-051-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 24 | |
Section: 32 | |
County/Municipality: Edmonton | |
Well Name: N.D. ELLERSLIE 12-32-51-24 | |
Operator Name: Northern Development Company Limited | |
License Number: 0021781 | |
License Date: 1961-12-06 | |
License Status: RecCertified | |
Spud Date: 1961-12-12 | |
Final Drill Date: 1961-12-17 | |
Well Total Depth: 1274.40 m | |
Surface Hole Latitude: 53.448475 | |
Surface Hole Longitude: -113.513232 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1961-12-06 | Obtained License |
1961-12-17 | Finished Drilling |
1961-12-20 | Production Casing Operation Performed |
1961-12-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-12-27 | Perforation Treatment Performed - Jet Perforation |
1962-05-18 | Perforation Treatment Performed - Fractured |
1963-05-01 | Perforation Treatment Performed - Cement Squeeze |
1963-05-06 | Drill Stem Test Performed |
1963-05-09 | Perforation Treatment Performed - Bullet Perforation |
1963-10-03 | Well Mode changed to Drilled and Cased |
1963-10-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-11-16 | Perforation Treatment Performed - Cement Plug |
1966-11-18 | Well Fluid changed to Crude Oil |
1966-11-18 | Well Mode changed to Potential |
1966-11-19 | Well Abandoned |
1966-11-19 | Well Fluid changed to Crude Oil |
1966-11-19 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1961-12-27 | Perforation | 1187.20 | 1188.10 | 13 |
1963-05-09 | Bullet Perforation | 1197.60 | 1198.50 | 13 |
1963-10-15 | Acid Treatment | 1186.30 | 1198.50 | 0 |
1966-11-16 | Cement Plug | 1109.50 | 1208.50 | 0 |
1961-12-27 | Perforation | 1189.90 | 1190.50 | 13 |
1961-12-27 | Acid Treatment | 1187.20 | 1190.50 | 0 |
1962-05-18 | Fracture | 1187.20 | 1190.50 | 0 |
1963-05-01 | Cement Squeeze | 1187.20 | 1188.10 | 0 |
1963-05-01 | Cement Squeeze | 1189.90 | 1190.50 | 0 |
1963-05-09 | Bullet Perforation | 1186.30 | 1187.50 | 13 |
1963-05-09 | Bullet Perforation | 1192.70 | 1193.60 | 13 |
1963-05-09 | Bullet Perforation | 1194.20 | 1195.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1962 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]