X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514250602000

Well Details

Well ID: 0514250602000
Loading map...
Location: 00/02-06-051-25W4/0
Location Alias: 00/02-06-51-25 W4M
Location Alias 2: 00/02-06-051-25 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 25
Section: 06
County/Municipality: Edmonton
Well Name: PETRUS LEDUC-WB 2-6-51-25
Operator Name: Petrus Resources Corp.
License Number: 0095047
License Date: 1982-02-11
License Status: RecCertified
Spud Date: 1982-05-17
Final Drill Date: 1982-05-31
Well Total Depth: 1630.00 m
Surface Hole Latitude: 53.367759
Surface Hole Longitude: -113.673489

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-02-11 Obtained License
1982-05-17 Direction Drilling Operation Performed - 98
1982-05-31 Finished Drilling
1982-05-31 Well Mode changed to Drilled and Cased
1982-06-01 Drill Stem Test Performed
1982-06-02 Drill Stem Test Performed
1982-06-03 Production Casing Operation Performed
1982-07-21 Perforation Treatment Performed - Jet Perforation
1982-07-22 Well Began Production
1982-07-22 Well Fluid changed to Crude Oil
1982-07-22 Well Mode changed to Flowing
1982-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-16 Well Fluid changed to Crude Oil
1982-08-16 Well Mode changed to Pumping
1983-03-09 Well Fluid changed to Crude Oil
1983-03-09 Well Mode changed to Suspended
1985-06-02 Well Fluid changed to Crude Oil
1985-06-02 Well Mode changed to Flowing
1985-07-03 Well Fluid changed to Crude Oil
1985-07-03 Well Mode changed to Suspended
1998-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-12-02 Plug Back Performed
1998-12-02 Well Log Performed
1998-12-08 Well Abandoned
1998-12-08 Well Fluid changed to Crude Oil
1998-12-08 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1982-05-17 1396.00 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-07-21 Perforation 1608.00 1608.20 13
1982-07-24 Acid Treatment 1608.00 1608.20 0
1998-12-02 Packing Device Capped w/Cement 1592.00 1600.00 0
1998-12-02 Packing Device Capped w/Cement 1076.00 1084.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1764 0.0 0.0 0.0
1983 1801 0.0 0.0 0.0
1985 687 0.0 0.0 0.0

For data sources see[6]

References