If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514260305002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.372401,"lon":-113.759799,"icon":""}]} |
Location: 00/05-03-051-26W4/2 | |
Location Alias: 00/05-03-51-26 W4M | |
Location Alias 2: 00/05-03-051-26 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 26 | |
Section: 03 | |
County/Municipality: Parkland County | |
Well Name: WHITE ROSE WDBD 8 LEDUC 5-3MU-51-26 | |
Operator Name: NEP Canada ULC | |
License Number: 0000427 | |
License Date: 1949-08-02 | |
License Status: RecCertified | |
Spud Date: 1949-07-31 | |
Final Drill Date: 1949-08-31 | |
Well Total Depth: 1617.60 m | |
Surface Hole Latitude: 53.372401 | |
Surface Hole Longitude: -113.759799 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1949-08-02 | Obtained License |
1949-08-21 | Drill Stem Test Performed |
1949-08-22 | Drill Stem Test Performed |
1949-08-25 | Liner Casing Operation Performed |
1949-08-31 | Finished Drilling |
1949-08-31 | Perforation Treatment Performed - Open-Hole Completion |
1949-08-31 | Well Mode changed to Drilled and Cased |
1955-06-21 | Perforation Treatment Performed - Bullet Perforation |
1955-06-22 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1955-06-22 | Perforation Treatment Performed - Acid Wash - No Pressure |
1955-06-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1955-06-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1955-07-31 | Well Began Production |
1955-07-31 | Well Fluid changed to Crude Oil |
1955-07-31 | Well Mode changed to Flowing |
1961-05-05 | Well Fluid changed to Crude Oil |
1961-05-05 | Well Mode changed to Pumping |
1973-09-01 | Well Fluid changed to Crude Oil |
1973-09-01 | Well Mode changed to Suspended |
1977-11-29 | Well Fluid changed to Crude Oil |
1977-11-29 | Well Mode changed to Pumping |
1986-11-02 | Well Fluid changed to Crude Oil |
1986-11-02 | Well Mode changed to Suspended |
1988-08-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-08-08 | Well Log Performed |
1988-08-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-08-09 | Perforation Treatment Performed - Cement Squeeze |
1988-08-09 | Plug Back Performed |
1988-08-09 | Well Fluid changed to Crude Oil |
1988-08-09 | Well Mode changed to Suspended |
1988-08-10 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-08-10 | Perforation Treatment Performed - Jet Perforation |
1988-08-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-09-06 | Well Fluid changed to Crude Oil |
1988-09-06 | Well Mode changed to Pumping |
1996-09-01 | Well Fluid changed to Crude Oil |
1996-09-01 | Well Mode changed to Suspended |
2003-07-31 | Perforation Treatment Performed - Cement Squeeze |
2003-07-31 | Plug Back Performed |
2003-07-31 | Well Fluid changed to Crude Oil |
2003-07-31 | Well Mode changed to Abandoned Zone |
2003-08-11 | Perforation Treatment Performed - Jet Perforation |
2003-08-11 | Well Log Performed |
2003-08-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2003-08-14 | Well Log Performed |
2007-03-21 | Perforation Treatment Performed - Cement Plug |
2007-03-21 | Plug Back Performed |
2007-03-23 | Perforation Treatment Performed - Jet Perforation |
2007-03-23 | Well Log Performed |
2007-03-24 | Perforation Treatment Performed - Cement Squeeze |
2007-03-27 | Perforation Treatment Performed - Cement Squeeze |
2007-03-27 | Perforation Treatment Performed - Jet Perforation |
2007-03-28 | Perforation Treatment Performed - Cement Squeeze |
2007-03-28 | Perforation Treatment Performed - Jet Perforation |
2007-03-28 | Plug Back Performed |
2007-03-30 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1949-08-31 | Open Hole/Barefoot Completion | 1616.00 | 1617.60 | 0 |
1988-08-09 | Cement Squeeze | 1616.00 | 1617.60 | 0 |
1988-08-10 | Packing Device Capped w/Cement | 1543.40 | 1554.00 | 0 |
1988-08-10 | Perforation | 1514.00 | 1518.00 | 13 |
1988-08-10 | Perforation | 1521.00 | 1541.00 | 13 |
1988-08-12 | Acid Treatment | 1514.00 | 1541.00 | 0 |
2003-07-31 | Cement Squeeze | 1514.00 | 1518.00 | 0 |
2003-07-31 | Cement Squeeze | 1521.00 | 1541.00 | 0 |
2003-08-11 | Perforation | 1604.00 | 1605.50 | 17 |
2003-08-13 | Acid Treatment | 1604.00 | 1605.50 | 0 |
2007-03-21 | Cement Plug | 1456.00 | 1591.00 | 0 |
1955-06-21 | Bullet Perforation | 1524.60 | 1530.70 | 26 |
2007-03-23 | Perforation | 1090.00 | 1091.00 | 17 |
2007-03-23 | Perforation | 1059.00 | 1060.00 | 17 |
2007-03-24 | Cement Squeeze | 1090.00 | 1091.00 | 0 |
2007-03-24 | Cement Squeeze | 1059.00 | 1060.00 | 0 |
2007-03-27 | Perforation | 305.00 | 306.00 | 17 |
2007-03-27 | Cement Squeeze | 305.00 | 306.00 | 0 |
2007-03-28 | Perforation | 179.00 | 180.00 | 17 |
2007-03-28 | Cement Squeeze | 179.00 | 180.00 | 0 |
1955-06-21 | Bullet Perforation | 1533.80 | 1539.20 | 26 |
1955-06-22 | Acid Wash | 1524.60 | 1530.70 | 0 |
1955-06-22 | Acid Treatment | 1533.80 | 1539.20 | 0 |
1955-06-24 | Acid Treatment | 1524.60 | 1539.20 | 0 |
1955-06-30 | Acid Treatment | 1524.60 | 1539.20 | 0 |
1988-08-08 | Acid Treatment | 1616.00 | 1617.60 | 0 |
1988-08-09 | Acid Treatment | 1616.00 | 1617.60 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 6551 | 0.0 | 0.0 | 0.0 |
1968 | 5016 | 0.0 | 0.0 | 0.0 |
1969 | 2904 | 0.0 | 0.0 | 0.0 |
1970 | 3119 | 0.0 | 0.0 | 0.0 |
1971 | 7559 | 0.0 | 0.0 | 0.0 |
1972 | 7523 | 0.0 | 0.0 | 0.0 |
1973 | 2232 | 0.0 | 0.0 | 0.0 |
1977 | 288 | 0.0 | 0.0 | 0.0 |
1978 | 792 | 0.0 | 0.0 | 0.0 |
1980 | 1080 | 0.0 | 0.0 | 0.0 |
1981 | 5058 | 0.0 | 0.0 | 0.0 |
1982 | 1497 | 0.0 | 0.0 | 0.0 |
1986 | 2256 | 0.0 | 0.0 | 0.0 |
1987 | 2883 | 0.0 | 0.0 | 0.0 |
1988 | 2808 | 0.0 | 0.0 | 0.0 |
1989 | 8292 | 0.0 | 0.0 | 0.0 |
1990 | 7449 | 0.0 | 0.0 | 0.0 |
1991 | 7956 | 0.0 | 0.0 | 0.0 |
1992 | 8126 | 0.0 | 0.0 | 0.0 |
1993 | 4993 | 0.0 | 0.0 | 0.0 |
1994 | 7810 | 0.0 | 0.0 | 0.0 |
1995 | 8745 | 0.0 | 0.0 | 0.0 |
1996 | 3711 | 0.0 | 0.0 | 0.0 |
For data sources see[5]