X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0514260309020

Well Details

Well ID: 0514260309020
Loading map...
Location: 02/09-03-051-26W4/0
Location Alias: 02/09-03-51-26 W4M
Location Alias 2: 02/09-03-051-26 W4/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 4
Range: 26
Section: 03
County/Municipality: Parkland County
Well Name: NEP 102 HZ LEDUC-WB 9-3-51-26
Operator Name: NEP Canada ULC
License Number: 0476017
License Date: 2015-07-07
License Status: Issued
Spud Date: 2015-08-20
Final Drill Date: 2015-08-28
Well Total Depth: 3327.40 m
Surface Hole Latitude: 53.373003
Surface Hole Longitude: -113.771429

For data sources see[1][2]

Well History

Date Event
2015-07-07 Obtained License
2015-08-21 Surface Casing Operation Performed
2015-08-22 Direction Drilling Operation Performed - Deviate
2015-08-24 Direction Drilling Operation Performed - Horizontal
2015-08-25 Intermediate Casing Operation Performed
2015-08-28 Finished Drilling
2015-08-28 Well Mode changed to Drilled and Cased
2015-08-30 Liner Casing Operation Performed
2015-08-30 Rig Released
2015-09-17 Well Log Performed
2015-09-22 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-23 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-25 Perforation Treatment Performed - Multi-Stage Fracture
2015-09-26 Perforation Treatment Performed - Multi-Stage Fracture
2015-10-10 Well Began Production
2015-10-10 Well Fluid changed to Crude Oil
2015-10-10 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-08-22 1131.30 Deviate (5 - 79 degrees)
2015-08-24 1682.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-09-22 Multi-Stage Fracture 3293.40 3295.30 0
2015-09-24 Multi-Stage Fracture 2548.00 2549.50 0
2015-09-25 Multi-Stage Fracture 2462.30 2464.20 0
2015-09-25 Multi-Stage Fracture 2376.60 2378.50 0
2015-09-25 Multi-Stage Fracture 2304.30 2306.20 0
2015-09-25 Multi-Stage Fracture 2205.10 2207.00 0
2015-09-25 Multi-Stage Fracture 2119.30 2121.20 0
2015-09-25 Multi-Stage Fracture 2034.00 2035.90 0
2015-09-26 Multi-Stage Fracture 1948.20 1950.10 0
2015-09-26 Multi-Stage Fracture 1862.60 1864.50 0
2015-09-26 Multi-Stage Fracture 1777.30 1779.20 0
2015-09-22 Multi-Stage Fracture 3207.40 3209.30 0
2015-09-22 Multi-Stage Fracture 3121.60 3123.50 0
2015-09-23 Multi-Stage Fracture 3035.80 3037.70 0
2015-09-23 Multi-Stage Fracture 2950.00 2951.90 0
2015-09-23 Multi-Stage Fracture 2864.30 2866.20 0
2015-09-23 Multi-Stage Fracture 2778.50 2780.40 0
2015-09-23 Multi-Stage Fracture 2706.00 2707.90 0
2015-09-24 Multi-Stage Fracture 2633.80 2635.70 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-09-22 2015-09-26 1,537 3,432 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.0061 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 11.7624 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.5031 N/A
SiberProp 20/40 Trican silica crystalline 14808-60-7 100 4.9398 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0102 N/A
dibromoacetonitrile 3252-43-5 100 0.0102 N/A
non-hazardous ingredients Not Available 100 0.0102 N/A
polyethylene glycol 25322-68-3 100 0.0102 N/A
sodium bromide 7647-15-6 100 0.0102 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0081 N/A
DRA-2 Trican Buffer non-hazardous ingredients Not Available 100 0.0928 N/A
CC-6 Trican Clay Control choline chloride 67-48-1 100 0.1411 N/A
formic acid 64-18-6 100 0.1411 N/A
non-hazardous ingredients Not Available 100 0.1411 N/A
WXB-10 Trican Crosslinker borate salts 1319-33-1 100 0.1852 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.1852 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0833 N/A
propylene glycol 57-55-6 100 0.0833 N/A
WG-111d Trican Gelling Agent guar gum 9000-30-0 100 0.2451 N/A
GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.0222 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-09-21 2015-09-28 Municipal Water 3942

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1876 0.0 0.0 0.0
2016 7929 0.0 0.0 0.0
2017 7939 0.0 0.0 0.0
2018 8216 0.0 0.0 0.0
2019 8605 0.0 0.0 0.0
2020 2022 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-08-30 No Incident Encountered 0.00 0.00
2015-09-27 No Incident Encountered 0.00 0.00

For data sources see[9]

References