If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0514260406000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.372478,"lon":-113.778311,"icon":""}]} |
| Location: 00/06-04-051-26W4/0 | |
| Location Alias: 00/06-04-51-26 W4M | |
| Location Alias 2: 00/06-04-051-26 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 4 | |
| Range: 26 | |
| Section: 04 | |
| County/Municipality: Parkland County | |
| Well Name: MEC LEDUC-WB 6-4-51-26 | |
| Operator Name: NEP Canada ULC | |
| License Number: B0002729 | |
| License Date: 1949-03-25 | |
| License Status: Abandoned | |
| Spud Date: 1949-03-26 | |
| Final Drill Date: 1949-05-05 | |
| Well Total Depth: 1620.60 m | |
| Surface Hole Latitude: 53.372478 | |
| Surface Hole Longitude: -113.778311 |
| Date | Event |
|---|---|
| 1909-09-09 | Well Log Performed |
| 1949-03-25 | Obtained License |
| 1949-04-08 | Drill Stem Test Performed |
| 1949-04-09 | Drill Stem Test Performed |
| 1949-04-12 | Drill Stem Test Performed |
| 1949-04-13 | Drill Stem Test Performed |
| 1949-04-14 | Drill Stem Test Performed |
| 1949-04-15 | Drill Stem Test Performed |
| 1949-04-18 | Liner Casing Operation Performed |
| 1949-04-19 | Drill Stem Test Performed |
| 1949-04-22 | Drill Stem Test Performed |
| 1949-04-25 | Drill Stem Test Performed |
| 1949-04-26 | Drill Stem Test Performed |
| 1949-05-03 | Drill Stem Test Performed |
| 1949-05-05 | Finished Drilling |
| 1949-05-05 | Well Mode changed to Drilled and Cased |
| 1949-05-08 | Perforation Treatment Performed - Open-Hole Completion |
| 1949-05-11 | Well Began Production |
| 1949-05-11 | Well Fluid changed to Crude Oil |
| 1949-05-11 | Well Mode changed to Flowing |
| 1953-03-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1981-06-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1981-06-03 | Perforation Treatment Performed - Cement Plug |
| 1981-06-08 | Perforation Treatment Performed - Selective Jet Perforations |
| 1981-06-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1981-06-10 | Well Fluid changed to Crude Oil |
| 1981-06-10 | Well Mode changed to Pumping |
| 1983-04-11 | Well Fluid changed to Crude Oil |
| 1983-04-11 | Well Mode changed to Suspended |
| 1984-12-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1984-12-04 | Perforation Treatment Performed - Cement Squeeze |
| 1984-12-06 | Well Log Performed |
| 1984-12-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1984-12-07 | Perforation Treatment Performed - Jet Perforation |
| 1984-12-11 | Perforation Treatment Performed - Cement Squeeze |
| 1984-12-13 | Perforation Treatment Performed - Jet Perforation |
| 1984-12-13 | Well Log Performed |
| 1984-12-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1985-01-01 | Well Fluid changed to Crude Oil |
| 1985-01-01 | Well Mode changed to Flowing |
| 1986-10-01 | Well Fluid changed to Crude Oil |
| 1986-10-01 | Well Mode changed to Suspended |
| 1987-08-15 | Well Fluid changed to Crude Oil |
| 1987-08-15 | Well Mode changed to Flowing |
| 1988-08-15 | Well Fluid changed to Crude Oil |
| 1988-08-15 | Well Mode changed to Suspended |
| 1991-03-22 | Well Log Performed |
| 1991-03-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1991-04-04 | Perforation Treatment Performed - Cement Squeeze |
| 1991-04-08 | Well Log Performed |
| 1991-04-09 | Well Log Performed |
| 1991-04-10 | Well Log Performed |
| 1991-05-28 | Perforation Treatment Performed - Jet Perforation |
| 1991-05-28 | Well Log Performed |
| 1991-05-29 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 1991-08-19 | Well Fluid changed to Gas |
| 1991-08-19 | Well Mode changed to Flowing |
| 1992-02-15 | Well Log Performed |
| 1992-05-23 | Well Log Performed |
| 1992-08-06 | Well Log Performed |
| 1992-08-11 | Well Log Performed |
| 1993-03-18 | Well Log Performed |
| 1993-07-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1993-07-02 | Plug Back Performed |
| 1993-07-02 | Well Log Performed |
| 1994-06-03 | Well Log Performed |
| 1994-10-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 1994-10-20 | Plug Back Performed |
| 1994-10-20 | Well Log Performed |
| 1995-11-01 | Well Fluid changed to Gas |
| 1995-11-01 | Well Mode changed to Suspended |
| 1996-07-01 | Well Fluid changed to Gas |
| 1996-07-01 | Well Mode changed to Flowing |
| 1996-10-01 | Well Fluid changed to Gas |
| 1996-10-01 | Well Mode changed to Suspended |
| 2006-06-05 | Perforation Treatment Performed - Cement Plug |
| 2006-06-05 | Plug Back Performed |
| 2006-06-05 | Well Fluid changed to Gas |
| 2006-06-05 | Well Mode changed to Abandoned Zone |
| 2009-05-30 | Well Log Performed |
| 2009-06-03 | Perforation Treatment Performed - Cement Plug |
| 2009-06-03 | Plug Back Performed |
| 2009-06-04 | Perforation Treatment Performed - Cement Squeeze |
| 2009-06-04 | Perforation Treatment Performed - Jet Perforation |
| 2009-06-04 | Plug Back Performed |
| 2009-06-04 | Well Log Performed |
| 2009-06-05 | Perforation Treatment Performed - Cement Squeeze |
| 2009-06-05 | Perforation Treatment Performed - Jet Perforation |
| 2009-06-05 | Plug Back Performed |
| 2009-06-05 | Well Log Performed |
| 2009-06-06 | Well Log Performed |
| 2009-06-08 | Perforation Treatment Performed - Cement Squeeze |
| 2009-06-08 | Perforation Treatment Performed - Jet Perforation |
| 2009-06-08 | Plug Back Performed |
| 2009-06-08 | Well Log Performed |
| 2009-06-12 | Well Log Performed |
| 2009-06-15 | Perforation Treatment Performed - Cement Squeeze |
| 2009-06-15 | Perforation Treatment Performed - Jet Perforation |
| 2009-06-15 | Plug Back Performed |
| 2009-06-15 | Well Log Performed |
| 2009-06-17 | Perforation Treatment Performed - Cement Squeeze |
| 2009-06-17 | Perforation Treatment Performed - Jet Perforation |
| 2009-06-17 | Plug Back Performed |
| 2009-06-17 | Well Log Performed |
| 2009-06-19 | Perforation Treatment Performed - Cement Squeeze |
| 2009-06-19 | Perforation Treatment Performed - Jet Perforation |
| 2009-06-19 | Plug Back Performed |
| 2009-06-19 | Well Log Performed |
| 2009-06-22 | Perforation Treatment Performed - Cement Squeeze |
| 2009-06-22 | Perforation Treatment Performed - Jet Perforation |
| 2009-06-22 | Plug Back Performed |
| 2009-06-22 | Well Log Performed |
| 2009-06-24 | Perforation Treatment Performed - Cement Squeeze |
| 2009-06-24 | Perforation Treatment Performed - Jet Perforation |
| 2009-06-24 | Plug Back Performed |
| 2009-06-24 | Well Log Performed |
| 2009-06-26 | Perforation Treatment Performed - Cement Plug |
| 2009-06-26 | Perforation Treatment Performed - Cement Squeeze |
| 2009-06-26 | Perforation Treatment Performed - Jet Perforation |
| 2009-06-26 | Plug Back Performed |
| 2009-06-26 | Well Log Performed |
| 2009-09-09 | Well Abandoned |
| 2009-09-09 | Well Fluid changed to Gas |
| 2009-09-09 | Well Mode changed to Abandoned |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 1949-05-08 | Open Hole/Barefoot Completion | 1619.40 | 1620.60 | 0 |
| 1984-12-07 | Acid Treatment | 1617.00 | 1617.10 | 0 |
| 1984-12-11 | Cement Squeeze | 1617.00 | 1617.10 | 0 |
| 1984-12-13 | Perforation | 1616.30 | 1616.40 | 13 |
| 1984-12-14 | Acid Treatment | 1616.30 | 1616.40 | 0 |
| 1991-03-28 | Acid Treatment | 1616.30 | 1616.40 | 0 |
| 1991-04-04 | Cement Squeeze | 1616.30 | 1616.40 | 0 |
| 1991-05-28 | Perforation | 1584.00 | 1587.00 | 19 |
| 1991-05-28 | Perforation | 1592.50 | 1595.50 | 19 |
| 1991-05-28 | Perforation | 1600.00 | 1603.00 | 19 |
| 1991-05-29 | Acid Treatment | 1584.00 | 1603.00 | 0 |
| 1953-03-31 | Acid Treatment | 1619.40 | 1620.60 | 0 |
| 1993-07-02 | Packing Device Capped w/Cement | 1596.70 | 1598.50 | 0 |
| 1994-10-20 | Packing Device Capped w/Cement | 1589.00 | 1591.00 | 0 |
| 2006-06-05 | Cement Plug | 1575.00 | 1587.00 | 0 |
| 2009-06-03 | Cement Plug | 1518.00 | 1575.00 | 0 |
| 2009-06-04 | Perforation | 1082.00 | 1083.00 | 17 |
| 2009-06-04 | Cement Squeeze | 1082.00 | 1083.00 | 0 |
| 2009-06-05 | Perforation | 566.00 | 567.00 | 17 |
| 2009-06-05 | Cement Squeeze | 566.00 | 567.00 | 0 |
| 2009-06-08 | Perforation | 180.00 | 181.00 | 17 |
| 2009-06-08 | Cement Squeeze | 180.00 | 181.00 | 0 |
| 1981-06-03 | Acid Treatment | 1619.40 | 1620.60 | 0 |
| 2009-06-15 | Perforation | 590.00 | 591.00 | 17 |
| 2009-06-15 | Cement Squeeze | 590.00 | 591.00 | 0 |
| 2009-06-17 | Perforation | 500.00 | 501.00 | 17 |
| 2009-06-17 | Cement Squeeze | 500.00 | 501.00 | 0 |
| 2009-06-19 | Perforation | 410.00 | 411.00 | 17 |
| 2009-06-19 | Cement Squeeze | 410.00 | 411.00 | 0 |
| 2009-06-22 | Perforation | 310.00 | 311.00 | 17 |
| 2009-06-22 | Cement Squeeze | 310.00 | 311.00 | 0 |
| 2009-06-24 | Perforation | 170.00 | 171.00 | 17 |
| 2009-06-24 | Cement Squeeze | 170.00 | 171.00 | 0 |
| 1981-06-03 | Cement Plug | 1619.30 | 1620.60 | 0 |
| 2009-06-26 | Perforation | 105.00 | 106.00 | 17 |
| 2009-06-26 | Cement Squeeze | 105.00 | 106.00 | 0 |
| 2009-06-26 | Cement Plug | 63.70 | 104.00 | 0 |
| 1981-06-08 | Selective Jet Perforations | 1618.90 | 1619.10 | 0 |
| 1981-06-10 | Acid Treatment | 1618.90 | 1619.10 | 0 |
| 1984-12-04 | Acid Treatment | 1618.90 | 1619.10 | 0 |
| 1984-12-04 | Cement Squeeze | 1618.90 | 1619.10 | 0 |
| 1984-12-07 | Perforation | 1617.00 | 1617.10 | 3 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 1961 | 0 | 0.0 | 0.0 | 0.0 |
| 1962 | 0 | 0.0 | 0.0 | 0.0 |
| 1963 | 0 | 0.0 | 0.0 | 0.0 |
| 1964 | 0 | 0.0 | 0.0 | 0.0 |
| 1965 | 0 | 0.0 | 0.0 | 0.0 |
| 1981 | 4203 | 0.0 | 0.0 | 0.0 |
| 1982 | 3883 | 0.0 | 0.0 | 0.0 |
| 1985 | 6956 | 0.0 | 0.0 | 0.0 |
| 1987 | 3330 | 0.0 | 0.0 | 0.0 |
| 1988 | 5010 | 0.0 | 0.0 | 0.0 |
| 1991 | 3170 | 0.0 | 0.0 | 0.0 |
| 1992 | 8708 | 0.0 | 0.0 | 0.0 |
| 1993 | 8582 | 0.0 | 0.0 | 0.0 |
| 1994 | 8510 | 0.0 | 0.0 | 0.0 |
| 1995 | 5038 | 0.0 | 0.0 | 0.0 |
| 1996 | 516 | 0.0 | 0.0 | 0.0 |
For data sources see[5]