If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0514272412003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.419311,"lon":-113.858554,"icon":""}]} |
Location: 00/12-24-051-27W4/3 | |
Location Alias: 00/12-24-51-27 W4M | |
Location Alias 2: 00/12-24-051-27 W4/03 | |
Country: Canada | |
Province: Alberta | |
Township: 051 | |
Meridian: 4 | |
Range: 27 | |
Section: 24 | |
County/Municipality: Parkland County | |
Well Name: CEDAR CREEK GSPIKE 12-24-51-27 | |
Operator Name: MAGA Energy Operations Ltd. | |
License Number: 0016179 | |
License Date: 1958-11-05 | |
License Status: Suspension | |
Spud Date: 1958-11-13 | |
Final Drill Date: 1976-06-08 | |
Well Total Depth: 1818.10 m | |
Surface Hole Latitude: 53.419311 | |
Surface Hole Longitude: -113.858554 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1958-11-05 | Obtained License |
1958-11-18 | Drill Stem Test Performed |
1958-11-20 | Drill Stem Test Performed |
1958-11-21 | Drill Stem Test Performed |
1958-11-22 | Drill Stem Test Performed |
1958-11-24 | Drill Stem Test Performed |
1958-11-25 | Drill Stem Test Performed |
1958-11-26 | Drill Stem Test Performed |
1958-11-27 | Drill Stem Test Performed |
1958-11-29 | Drill Stem Test Performed |
1958-12-03 | Drill Stem Test Performed |
1959-01-20 | Perforation Treatment Performed - Open-Hole Completion |
1959-01-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-01-31 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-02-11 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1959-02-11 | Perforation Treatment Performed - Fractured |
1959-02-20 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-06-07 | Drill Stem Test Performed |
1976-06-08 | Finished Drilling |
1976-06-08 | Liner Casing Operation Performed |
1976-06-08 | Perforation Treatment Performed - Cement Squeeze |
1976-06-10 | Perforation Treatment Performed - Open-Hole Completion |
1976-06-11 | Perforation Treatment Performed - Jet Perforation |
1976-06-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-06-16 | Perforation Treatment Performed - Cement Plug |
1976-06-16 | Perforation Treatment Performed - Open-Hole Completion |
1976-06-18 | Well Mode changed to Drilled and Cased |
1983-09-13 | Well Log Performed |
1983-09-16 | Well Log Performed |
1983-09-29 | Perforation Treatment Performed - Jet Perforation |
1983-09-29 | Well Mode changed to Drilled and Cased |
1984-09-21 | Well Began Production |
1984-09-21 | Well Fluid changed to Crude Oil |
1984-09-21 | Well Mode changed to Pumping |
1985-01-01 | Well Fluid changed to Crude Oil |
1985-01-01 | Well Mode changed to Suspended |
1987-10-23 | Well Log Performed |
1987-10-27 | Perforation Treatment Performed - Acid Wash - No Pressure |
1987-10-27 | Perforation Treatment Performed - Cement Squeeze |
1987-11-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1987-11-03 | Well Fluid changed to Crude Oil |
1987-11-03 | Well Mode changed to Abandoned Zone |
1987-11-04 | Perforation Treatment Performed - Jet Perforation |
1987-11-04 | Well Log Performed |
1987-11-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1994-07-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1994-07-18 | Well Log Performed |
1994-07-21 | Perforation Treatment Performed - Jet Perforation |
1994-07-21 | Well Log Performed |
1994-07-22 | Perforation Treatment Performed - Fractured |
1994-07-29 | Well Log Performed |
1994-07-30 | Perforation Treatment Performed - Jet Perforation |
1995-10-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1998-02-11 | Perforation Treatment Performed - Jet Perforation |
1998-02-11 | Well Log Performed |
1998-02-12 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-03-07 | Perforation Treatment Performed - Jet Perforation |
2002-03-07 | Well Log Performed |
2008-11-19 | Perforation Treatment Performed - Cement Squeeze |
2008-11-19 | Plug Back Performed |
2008-12-02 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2009-06-17 | Perforation Treatment Performed - Jet Perforation |
2009-06-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2009-06-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2009-11-04 | Perforation Treatment Performed - Chemical Squeeze |
2012-06-12 | Perforation Treatment Performed - Jet Perforation |
2013-11-13 | Perforation Treatment Performed - Cement Squeeze |
2013-11-13 | Plug Back Performed |
2013-11-22 | Perforation Treatment Performed - Cement Squeeze |
2013-11-22 | Plug Back Performed |
2013-12-05 | Perforation Treatment Performed - Jet Perforation |
2013-12-10 | Perforation Treatment Performed - Jet Perforation |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1959-01-20 | Open Hole/Barefoot Completion | 1759.30 | 1805.00 | 0 |
1976-06-14 | Acid Treatment | 1807.50 | 1818.10 | 0 |
1976-06-16 | Cement Plug | 1813.90 | 1818.10 | 0 |
1976-06-16 | Open Hole/Barefoot Completion | 1807.50 | 1813.90 | 0 |
1983-09-29 | Perforation | 1267.50 | 1270.50 | 7 |
1987-10-27 | Acid Wash | 1267.50 | 1270.50 | 0 |
1987-10-27 | Cement Squeeze | 1267.50 | 1270.50 | 0 |
1987-11-03 | Packing Device Capped w/Cement | 1803.50 | 1804.00 | 0 |
1987-11-04 | Perforation | 1796.50 | 1799.30 | 13 |
1987-11-05 | Acid Treatment | 1796.50 | 1799.30 | 0 |
1994-07-18 | Packing Device Capped w/Cement | 1708.00 | 1716.00 | 0 |
1959-01-21 | Acid Treatment | 1759.30 | 1805.00 | 0 |
1994-07-21 | Perforation | 1271.00 | 1274.00 | 13 |
1994-07-22 | Fracture | 1271.00 | 1274.00 | 0 |
1994-07-30 | Perforation | 1373.70 | 1379.50 | 13 |
1994-07-30 | Perforation | 1381.00 | 1385.90 | 13 |
1995-10-04 | Acid Treatment | 1373.70 | 1385.90 | 0 |
1998-02-11 | Perforation | 1396.00 | 1400.00 | 13 |
1998-02-11 | Perforation | 1401.50 | 1402.50 | 13 |
1998-02-12 | Acid Treatment | 1396.00 | 1402.50 | 0 |
2002-03-07 | Perforation | 1264.00 | 1274.00 | 13 |
2008-11-19 | Cement Squeeze | 1264.00 | 1274.00 | 0 |
1959-01-31 | Acid Treatment | 1759.30 | 1805.00 | 0 |
2008-12-02 | Acid Treatment | 1373.70 | 1385.90 | 0 |
2009-06-17 | Perforation | 1411.50 | 1418.50 | 20 |
2009-06-18 | Acid Treatment | 1411.50 | 1418.50 | 0 |
2009-06-19 | Acid Treatment | 1411.50 | 1418.50 | 0 |
2009-11-04 | Chemical Squeeze | 1373.70 | 1418.50 | 0 |
2012-06-12 | Perforation | 1264.00 | 1270.00 | 20 |
2013-11-13 | Cement Squeeze | 1264.00 | 1270.00 | 0 |
2013-11-22 | Cement Squeeze | 1373.70 | 1418.50 | 0 |
2013-12-05 | Perforation | 1796.50 | 1799.30 | 13 |
2013-12-10 | Perforation | 1760.00 | 1765.00 | 20 |
1959-02-11 | Fracture | 1759.30 | 1805.00 | 0 |
2013-12-10 | Perforation | 1771.00 | 1777.00 | 20 |
2013-12-10 | Perforation | 1793.50 | 1797.50 | 20 |
2013-12-10 | Perforation | 1766.50 | 1769.00 | 20 |
2013-12-10 | Perforation | 1789.50 | 1793.50 | 20 |
1959-02-11 | Acid Treatment | 1759.30 | 1805.00 | 0 |
1959-02-20 | Acid Treatment | 1759.30 | 1805.00 | 0 |
1976-06-08 | Cement Squeeze | 1759.30 | 1805.00 | 0 |
1976-06-10 | Open Hole/Barefoot Completion | 1807.50 | 1818.10 | 0 |
1976-06-11 | Perforation | 1812.00 | 1814.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 1298 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-06-12 | No Incident Encountered | 0.00 | 0.00 |
2013-12-12 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]