If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515040816020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.394899,"lon":-114.556909,"icon":""}]} |
| Location: 02/16-08-051-04W5/0 | |
| Location Alias: 02/16-08-51-04 W5M | |
| Location Alias 2: 02/16-08-051-04 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 04 | |
| Section: 08 | |
| County/Municipality: Parkland County | |
| Well Name: NEW STAR HZ HIGHVALE 16-8-51-4 | |
| Operator Name: New Star Energy Ltd. | |
| License Number: 0453664 | |
| License Date: 2013-01-16 | |
| License Status: Issued | |
| Spud Date: 2013-01-29 | |
| Final Drill Date: 2013-02-11 | |
| Well Total Depth: 2325.00 m | |
| Surface Hole Latitude: 53.394899 | |
| Surface Hole Longitude: -114.556909 |
| Date | Event |
|---|---|
| 2013-01-16 | Obtained License |
| 2013-01-30 | Lost Circulation Occurred |
| 2013-02-01 | Surface Casing Operation Performed |
| 2013-02-05 | Direction Drilling Operation Performed - Deviate |
| 2013-02-06 | Direction Drilling Operation Performed - Horizontal |
| 2013-02-08 | Intermediate Casing Operation Performed |
| 2013-02-11 | Finished Drilling |
| 2013-02-11 | Well Mode changed to Drilled and Cased |
| 2013-02-13 | Rig Released |
| 2013-02-26 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-02-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-02-28 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-03-03 | Well Began Production |
| 2013-03-03 | Well Fluid changed to Crude Oil |
| 2013-03-03 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-01-29 | Beaver Drilling Ltd. | 12 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-02-05 | 1337.30 | Deviate (5 - 79 degrees) |
| 2013-02-06 | 1720.50 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-02-26 | Multi-Stage Fracture | 2310.00 | 2320.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 2175.00 | 2185.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 2160.00 | 2170.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 2145.00 | 2155.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 2130.00 | 2140.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 2115.00 | 2125.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 2100.00 | 2110.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 2085.00 | 2095.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 2070.00 | 2080.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 2055.00 | 2065.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 2040.00 | 2050.00 | 0 |
| 2013-02-26 | Multi-Stage Fracture | 2295.00 | 2305.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 2025.00 | 2035.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 2010.00 | 2020.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 1995.00 | 2005.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 1980.00 | 1990.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 1965.00 | 1975.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 1950.00 | 1960.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 1935.00 | 1945.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 1920.00 | 1930.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 1905.00 | 1915.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 1890.00 | 1900.00 | 0 |
| 2013-02-26 | Multi-Stage Fracture | 2280.00 | 2290.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 1875.00 | 1885.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 1860.00 | 1870.00 | 0 |
| 2013-02-28 | Multi-Stage Fracture | 1845.00 | 1855.00 | 0 |
| 2013-02-28 | Multi-Stage Fracture | 1835.00 | 1845.00 | 0 |
| 2013-02-28 | Multi-Stage Fracture | 1820.00 | 1830.00 | 0 |
| 2013-02-28 | Multi-Stage Fracture | 1805.00 | 1815.00 | 0 |
| 2013-02-28 | Multi-Stage Fracture | 1795.00 | 1805.00 | 0 |
| 2013-02-26 | Multi-Stage Fracture | 2265.00 | 2275.00 | 0 |
| 2013-02-26 | Multi-Stage Fracture | 2250.00 | 2260.00 | 0 |
| 2013-02-26 | Multi-Stage Fracture | 2235.00 | 2245.00 | 0 |
| 2013-02-26 | Multi-Stage Fracture | 2220.00 | 2230.00 | 0 |
| 2013-02-26 | Multi-Stage Fracture | 2205.00 | 2215.00 | 0 |
| 2013-02-27 | Multi-Stage Fracture | 2190.00 | 2200.00 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-02-26 | 2013-02-28 | 1,609 | 436 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Hydrochloric acid | 7647-01-0 | 100 | 30.0797 | N/A | |||
| Hydrochloric acid dilution water | Not Available | 100 | 30.0797 | N/A | ||||
| Water | Not Available | 100 | 65.6823 | N/A | ||||
| DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0785 | N/A | |
| DAP-111 | Calfrac | Corrosion Inhibitor | Hydroxylated hydrocarbon | 8676 | 100 | 0.0858 | N/A | |
| Inorganic salt | 8676 | 100 | 0.0858 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0858 | N/A | ||||
| DAP-121 | Calfrac | Demulsifier | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0321 | N/A | |
| Sulfonated hydrocarbon | 8691 | 100 | 0.0321 | N/A | ||||
| DAP-131 | Calfrac | Demulsifier | 2-Propanol | 67-63-0 | 100 | 0.1916 | N/A | |
| Inorganic acid | 8692 | 100 | 0.1916 | N/A | ||||
| Sulfonated hydrocarbon | 8692 | 100 | 0.1916 | N/A | ||||
| DWP-602 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0957 | N/A | |
| DAP-101 | Calfrac | Iron Control | 2-Mercaptoethanol | 60-24-2 | 100 | 0.2564 | N/A | |
| Copper chloride | 7447-39-4 | 100 | 0.2564 | N/A | ||||
| Ethanolamine | 141-43-5 | 100 | 0.2564 | N/A | ||||
| Non-Hazardous Ingredients | Trade Secret | 100 | 0.2564 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.2564 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-02-23 | 2013-03-05 | Municipal Water | 244 |
| 2013-02-23 | 2013-03-05 | Oilfield Produced Water | 257 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 5515 | 0.0 | 0.0 | 0.0 |
| 2014 | 8225 | 0.0 | 0.0 | 0.0 |
| 2015 | 7899 | 0.0 | 0.0 | 0.0 |
| 2016 | 8219 | 0.0 | 0.0 | 0.0 |
| 2017 | 8413 | 0.0 | 0.0 | 0.0 |
| 2018 | 3495 | 0.0 | 0.0 | 0.0 |
| 2019 | 760 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-01-30 | Lost Circulation | 37.00 | 70.00 |
| 2013-03-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]