X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515090411000

Well Details

Well ID: 0515090411000
Loading map...
Location: 00/11-04-051-09W5/0
Location Alias: 00/11-04-51-09 W5M
Location Alias 2: 00/11-04-051-09 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 09
Section: 04
County/Municipality: Yellowhead County
Well Name: KEYERA SW DISP BIGORAY 11-4-51-9
Operator Name: Keyera Energy Ltd.
License Number: 0069404
License Date: 1978-05-08
License Status: Issued
Spud Date: 1978-08-06
Final Drill Date: 1978-09-12
Well Total Depth: 2597.00 m
Surface Hole Latitude: 53.376475
Surface Hole Longitude: -115.270145

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-05-08 Obtained License
1978-08-19 Drill Stem Test Performed
1978-09-12 Finished Drilling
1978-09-12 Well Mode changed to Drilled and Cased
1978-09-15 Drill Stem Test Performed
1978-09-17 Drill Stem Test Performed
1978-09-19 Production Casing Operation Performed
1978-11-30 Perforation Treatment Performed - Jet Perforation
1978-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-04-06 Well Began Injection
1979-04-06 Well Fluid changed to Water
1979-04-06 Well Type changed to Injection
1980-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-06-10 Well Fluid changed to Water
1983-06-10 Well Mode changed to Suspended
1983-06-10 Well Type changed to Injection
1985-12-02 Well Log Performed
1986-02-05 Well Log Performed
1986-02-06 Perforation Treatment Performed - Cement Squeeze
1986-02-12 Perforation Treatment Performed - Jet Perforation
1986-02-13 Perforation Treatment Performed - Fractured
1986-03-15 Well Began Production
1986-03-15 Well Fluid changed to Crude Oil
1986-03-15 Well Mode changed to Pumping
1986-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-05-05 Perforation Treatment Performed - Jet Perforation
1986-05-06 Perforation Treatment Performed - Fractured
1986-08-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-23 Perforation Treatment Performed - Cement Squeeze
1986-10-07 Perforation Treatment Performed - Jet Perforation
1986-10-08 Perforation Treatment Performed - Fractured
1987-01-01 Well Fluid changed to Crude Oil
1987-01-01 Well Mode changed to Suspended
1990-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-10-04 Plug Back Performed
1990-10-04 Well Fluid changed to Crude Oil
1990-10-04 Well Mode changed to Abandoned Zone
1990-10-05 Well Log Performed
1990-10-07 Perforation Treatment Performed - Jet Perforation
1990-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-30 Perforation Treatment Performed - Jet Perforation
1991-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-31 Perforation Treatment Performed - Jet Perforation
1992-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-10-31 Perforation Treatment Performed - Jet Perforation
2001-09-06 Perforation Treatment Performed - Cement Squeeze
2001-09-06 Plug Back Performed
2001-09-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-08-13 Perforation Treatment Performed - Jet Perforation
2002-08-14 Perforation Treatment Performed - Jet Perforation
2002-08-14 Well Log Performed
2002-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-11-30 Perforation 2521.00 2531.10 13
1986-05-05 Perforation 2478.50 2482.00 13
1986-05-06 Fracture 2463.00 2482.00 0
1986-08-19 Acid Treatment 2463.00 2482.00 0
1986-09-23 Cement Squeeze 2478.50 2482.00 0
1986-10-07 Perforation 2469.30 2476.50 13
1986-10-07 Perforation 2463.00 2469.30 13
1986-10-08 Fracture 2463.00 2476.50 0
1990-10-04 Packing Device Capped w/Cement 2438.50 2448.50 0
1990-10-07 Perforation 2369.00 2378.00 13
1990-10-09 Acid Treatment 2369.00 2378.00 0
1978-12-05 Acid Treatment 2521.00 2531.10 0
1990-10-30 Perforation 2369.00 2378.00 20
1991-08-17 Acid Treatment 2369.00 2378.00 0
1991-10-30 Acid Treatment 2369.00 2378.00 0
1992-01-31 Perforation 2269.00 2278.00 13
1992-02-02 Acid Treatment 2269.00 2278.00 0
1994-10-29 Acid Treatment 2269.00 2378.00 0
1994-10-31 Perforation 1456.00 1463.00 20
2001-09-06 Cement Squeeze 1456.00 1463.00 0
2001-09-28 Acid Treatment 2369.00 2378.00 0
2001-09-28 Acid Treatment 2269.00 2278.00 0
1980-04-29 Acid Treatment 2521.00 2531.10 0
2002-02-15 Acid Treatment 2269.00 2378.00 0
2002-08-13 Perforation 2287.00 2290.00 13
2002-08-14 Perforation 2251.00 2254.00 13
2002-08-21 Acid Treatment 2251.00 2254.00 0
2002-08-21 Acid Treatment 2269.00 2278.00 0
2002-08-21 Acid Treatment 2287.00 2290.00 0
2002-08-21 Acid Treatment 2369.00 2378.00 0
1986-02-06 Cement Squeeze 2521.00 2531.00 0
1986-02-12 Perforation 2464.50 2470.50 13
1986-02-12 Perforation 2470.50 2476.50 13
1986-02-12 Perforation 2463.00 2464.50 13
1986-02-13 Fracture 2463.00 2476.50 0
1986-04-18 Acid Treatment 2463.00 2476.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1986 1356 0.0 0.0 0.0

For data sources see[5]

References