X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515160110002

Well Details

Well ID: 0515160110002
Loading map...
Location: 00/10-01-051-16W5/2
Location Alias: 00/10-01-51-16 W5M
Location Alias 2: 00/10-01-051-16 W5/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 16
Section: 01
County/Municipality: Yellowhead County
Well Name: TALISMAN WOLF SOUTH 10-1-51-16
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0287685
License Date: 2003-05-28
License Status: Issued
Spud Date: 2003-07-04
Final Drill Date: 2003-07-27
Well Total Depth: 2888.00 m
Surface Hole Latitude: 53.374231
Surface Hole Longitude: -116.219512

For data sources see[1][2]

Well History

Date Event
2003-05-28 Obtained License
2003-07-07 Surface Casing Operation Performed
2003-07-14 Direction Drilling Operation Performed - Deviate
2003-07-27 Finished Drilling
2003-07-27 Well Log Performed
2003-07-27 Well Mode changed to Drilled and Cased
2003-07-28 Well Log Performed
2003-07-30 Production Casing Operation Performed
2003-07-31 Rig Released
2003-09-05 Well Log Performed
2003-09-06 Perforation Treatment Performed - Jet Perforation
2003-09-06 Well Log Performed
2003-09-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-09 Plug Back Performed
2003-09-09 Well Log Performed
2003-09-10 Perforation Treatment Performed - Jet Perforation
2003-09-10 Well Log Performed
2003-09-11 Perforation Treatment Performed - Fractured
2003-10-17 Well Began Production
2003-10-17 Well Fluid changed to Gas
2003-10-17 Well Mode changed to Flowing
2004-01-01 Well Fluid changed to Gas
2004-01-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-07-14 1944.20 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-09-06 Perforation 2850.00 2854.00 17
2003-09-09 Packing Device Capped w/Cement 2837.00 2845.00 0
2003-09-10 Perforation 2775.00 2779.00 17
2003-09-11 Fracture 2775.00 2779.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 2208 0.0 0.0 0.0
2004 8648 0.0 0.0 0.0
2005 7860 0.0 0.0 0.0
2006 8135 0.0 0.0 0.0
2007 8706 0.0 0.0 0.0
2008 8040 0.0 0.0 0.0
2009 7463 0.0 0.0 0.0
2010 8453 0.0 0.0 0.0
2011 7080 0.0 0.0 0.0
2012 7395 0.0 0.0 0.0
2013 8447 0.0 0.0 0.0
2014 7255 0.0 0.0 0.0
2015 7754 0.0 0.0 0.0
2016 6555 0.0 0.0 0.0
2017 4489 0.0 0.0 0.0
2018 7011 0.0 0.0 0.0
2019 5112 0.0 0.0 0.0
2020 1872 0.0 0.0 0.0

For data sources see[6]

References