X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515161601000

Well Details

Well ID: 0515161601000
Loading map...
Location: 00/01-16-051-16W5/0
Location Alias: 00/01-16-51-16 W5M
Location Alias 2: 00/01-16-051-16 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 16
Section: 16
County/Municipality: Yellowhead County
Well Name: POC HZ EDSON 1-16-51-16
Operator Name: Perpetual Operating Corp.
License Number: 0471364
License Date: 2014-11-13
License Status: Issued
Spud Date: 2014-11-21
Final Drill Date: 2014-12-06
Well Total Depth: 4713.00 m
Surface Hole Latitude: 53.411633
Surface Hole Longitude: -116.313464

For data sources see[1][2]

Well History

Date Event
2014-11-13 Obtained License
2014-11-22 Surface Casing Operation Performed
2014-11-27 Direction Drilling Operation Performed - Deviate
2014-11-29 Direction Drilling Operation Performed - Horizontal
2014-11-30 Intermediate Casing Operation Performed
2014-12-06 Finished Drilling
2014-12-06 Well Log Performed
2014-12-06 Well Mode changed to Drilled and Cased
2014-12-07 Liner Casing Operation Performed
2014-12-09 Perforation Treatment Performed - Open-Hole Completion
2014-12-09 Rig Released
2015-01-17 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-23 Well Began Production
2015-01-23 Well Fluid changed to Gas
2015-01-23 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-21 Ironhand Drilling Inc. 9 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-11-27 2360.00 Deviate (5 - 79 degrees)
2014-11-27 2360.00 Deviate (5 - 79 degrees)
2014-11-29 2846.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-12-09 Open Hole/Barefoot Completion 4695.00 4713.00 0
2015-01-17 Multi-Stage Fracture 3959.40 3959.50 0
2015-01-17 Multi-Stage Fracture 3863.60 3863.70 0
2015-01-17 Multi-Stage Fracture 3799.40 3799.50 0
2015-01-17 Multi-Stage Fracture 3683.70 3683.80 0
2015-01-17 Multi-Stage Fracture 3599.70 3599.80 0
2015-01-17 Multi-Stage Fracture 3503.30 3503.40 0
2015-01-17 Multi-Stage Fracture 3420.60 3420.70 0
2015-01-17 Multi-Stage Fracture 3329.10 3329.20 0
2015-01-17 Multi-Stage Fracture 3236.50 3236.60 0
2015-01-17 Multi-Stage Fracture 3144.40 3144.50 0
2015-01-17 Multi-Stage Fracture 4673.90 4674.00 0
2015-01-17 Multi-Stage Fracture 3052.30 3052.40 0
2015-01-17 Multi-Stage Fracture 2971.40 2971.50 0
2015-01-17 Multi-Stage Fracture 4584.10 4584.20 0
2015-01-17 Multi-Stage Fracture 4500.50 4500.60 0
2015-01-17 Multi-Stage Fracture 4404.60 4404.70 0
2015-01-17 Multi-Stage Fracture 4320.30 4320.40 0
2015-01-17 Multi-Stage Fracture 4224.10 4224.20 0
2015-01-17 Multi-Stage Fracture 4140.20 4140.30 0
2015-01-17 Multi-Stage Fracture 4043.90 4044.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-17 2015-01-17 2,684 6,973 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.9414 N/A
30/50 Sanjel Crystalline Silica 14808-60-7 100 7.8008 N/A
50/140 Sanjel Crystalline Silica 14808-60-7 100 1.1999 N/A
B-1008 Sanjel Bactericide/Biocide BNPD 52-51-7 100 0.0082 N/A
Methyl Alcohol 67-56-1 100 0.0082 N/A
SCC-6L Sanjel Clay Control 1.6-Hexanediamine dihydrochloride 6055-52-3 100 0.1659 N/A
Non-Hazardous Ingredients Not Available 100 0.1659 N/A
FRW-3 Sanjel Friction Reducer Isoparaffinic Solvent 64742-47-8 100 0.0825 N/A
Non-Hazardous Ingredients Not Available 100 0.0825 N/A
Surfactant 68131-40-8 100 0.0825 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-01-13 2015-01-23 Surface Water - Lake 4285

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3933 0.0 0.0 0.0
2016 8639 0.0 0.0 0.0
2017 7943 0.0 0.0 0.0
2018 2352 0.0 0.0 0.0
2019 8495 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-09 No Incident Encountered 0.00 0.00
2015-01-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References