X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515162503002

Well Details

Well ID: 0515162503002
Loading map...
Location: 00/03-25-051-16W5/2
Location Alias: 00/03-25-51-16 W5M
Location Alias 2: 00/03-25-051-16 W5/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 16
Section: 25
County/Municipality: Yellowhead County
Well Name: POC EDSON 14-26-51-16
Operator Name: Perpetual Operating Corp.
License Number: 0472140
License Date: 2014-11-25
License Status: Amended
Spud Date: 2015-01-12
Final Drill Date: 2015-02-10
Well Total Depth: 4485.00 m
Surface Hole Latitude: 53.439776
Surface Hole Longitude: -116.244935

For data sources see[1][2]

Well History

Date Event
2014-11-25 Obtained License
2015-01-14 Surface Casing Operation Performed
2015-01-15 Direction Drilling Operation Performed - Deviate
2015-01-17 Direction Drilling Operation Performed - Deviate
2015-01-17 Direction Drilling Operation Performed - Horizontal
2015-01-23 Direction Drilling Operation Performed - Horizontal
2015-01-23 Well Log Performed
2015-02-03 Intermediate Casing Operation Performed
2015-02-10 Finished Drilling
2015-02-10 Well Log Performed
2015-02-10 Well Mode changed to Drilled and Cased
2015-02-12 Liner Casing Operation Performed
2015-02-13 Perforation Treatment Performed - Open-Hole Completion
2015-02-13 Rig Released
2015-08-19 Perforation Treatment Performed - Multi-Stage Fracture
2015-08-23 Well Began Production
2015-08-23 Well Fluid changed to Gas
2015-08-23 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2015-01-15 694.00 Deviate (5 - 79 degrees)
2015-01-17 2229.90 Horizontal
2015-01-17 2269.00 Deviate (5 - 79 degrees)
2015-01-23 2706.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-02-13 Open Hole/Barefoot Completion 4478.00 4485.00 0
2015-08-19 Multi-Stage Fracture 3697.80 3697.90 0
2015-08-19 Multi-Stage Fracture 3605.00 3605.10 0
2015-08-19 Multi-Stage Fracture 3523.50 3523.60 0
2015-08-19 Multi-Stage Fracture 3431.40 3431.50 0
2015-08-19 Multi-Stage Fracture 3339.50 3339.60 0
2015-08-19 Multi-Stage Fracture 3246.90 3247.00 0
2015-08-19 Multi-Stage Fracture 3165.20 3165.30 0
2015-08-19 Multi-Stage Fracture 3073.50 3073.60 0
2015-08-19 Multi-Stage Fracture 2981.00 2981.10 0
2015-08-19 Multi-Stage Fracture 2888.20 2888.30 0
2015-08-19 Multi-Stage Fracture 4417.30 4417.40 0
2015-08-19 Multi-Stage Fracture 2763.60 2763.70 0
2015-08-19 Multi-Stage Fracture 4324.20 4324.30 0
2015-08-19 Multi-Stage Fracture 4242.40 4242.50 0
2015-08-19 Multi-Stage Fracture 4148.90 4149.00 0
2015-08-19 Multi-Stage Fracture 4057.10 4057.20 0
2015-08-19 Multi-Stage Fracture 3964.40 3964.50 0
2015-08-19 Multi-Stage Fracture 3883.30 3883.40 0
2015-08-19 Multi-Stage Fracture 3790.40 3790.50 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-08-19 2015-08-19 2,546 6,833 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.2794 N/A
30/50 Sanjel Crystalline Silica 14808-60-7 100 7.6801 N/A
50/140 Sanjel Crystalline Silica 14808-60-7 100 1.1811 N/A
B-1008 Sanjel Bactericide/Biocide BNPD 52-51-7 100 0.0093 N/A
Methyl Alcohol 67-56-1 100 0.0093 N/A
SCC-6L Sanjel Clay Control 1.6-Hexanediamine dihydrochloride 6055-52-3 100 0.1696 N/A
Non-Hazardous Ingredients Not Available 100 0.1696 N/A
LDP-F-1915 Sanjel Friction Reducer Alcohols. C11-14 iso. C13-rich. ethoxylated 78330-21-9 100 0.0856 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0856 N/A
Non-Hazardous Ingredients Not Available 100 0.0856 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-08-19 2015-08-28 Surface Water - Lake 6849

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 1680 0.0 0.0 0.0
2016 8711 0.0 0.0 0.0
2017 7535 0.0 0.0 0.0
2018 8351 0.0 0.0 0.0
2019 8687 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-13 No Incident Encountered 0.00 0.00
2015-08-26 No Incident Encountered 0.00 0.00

For data sources see[9]

References