If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515170302000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.382236,"lon":-116.431934,"icon":""}]} |
| Location: 00/02-03-051-17W5/0 | |
| Location Alias: 00/02-03-51-17 W5M | |
| Location Alias 2: 00/02-03-051-17 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 17 | |
| Section: 03 | |
| County/Municipality: Yellowhead County | |
| Well Name: ROGCI HZ EDSON 2-3-51-17 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0483873 | |
| License Date: 2017-06-06 | |
| License Status: Issued | |
| Spud Date: 2017-08-22 | |
| Final Drill Date: 2017-09-03 | |
| Well Total Depth: 4390.00 m | |
| Surface Hole Latitude: 53.382236 | |
| Surface Hole Longitude: -116.431934 |
| Date | Event |
|---|---|
| 2017-06-06 | Obtained License |
| 2017-08-23 | Surface Casing Operation Performed |
| 2017-08-26 | Direction Drilling Operation Performed - Deviate |
| 2017-08-29 | Well Log Performed |
| 2017-08-30 | Intermediate Casing Operation Performed |
| 2017-09-01 | Direction Drilling Operation Performed - Horizontal |
| 2017-09-03 | Finished Drilling |
| 2017-09-03 | Well Log Performed |
| 2017-09-03 | Well Mode changed to Drilled and Cased |
| 2017-09-05 | Production Casing Operation Performed |
| 2017-09-06 | Perforation Treatment Performed - Open-Hole Completion |
| 2017-09-06 | Rig Released |
| 2017-11-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-11-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-11-17 | Well Fluid changed to Gas |
| 2017-11-17 | Well Mode changed to Testing |
| 2017-12-18 | Well Began Production |
| 2017-12-18 | Well Fluid changed to Gas |
| 2017-12-18 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2017-08-22 | Precision Drilling Corporation | 231 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-08-26 | 2141.90 | Deviate (5 - 79 degrees) |
| 2017-09-01 | 3065.80 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-09-06 | Open Hole/Barefoot Completion | 4384.00 | 4390.00 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3938.10 | 3938.20 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3887.20 | 3887.30 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3836.70 | 3836.80 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3785.80 | 3785.90 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3734.80 | 3734.90 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3683.30 | 3683.40 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3632.50 | 3632.60 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3580.70 | 3580.80 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3529.80 | 3529.90 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3479.00 | 3479.10 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 4350.60 | 4350.70 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3426.20 | 3426.30 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3369.60 | 3369.70 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3313.70 | 3313.80 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3256.80 | 3256.90 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3200.20 | 3200.30 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3143.30 | 3143.40 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3086.90 | 3087.00 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 4294.30 | 4294.40 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 4243.50 | 4243.60 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 4192.80 | 4192.90 | 0 |
| 2017-11-05 | Multi-Stage Fracture | 4141.90 | 4142.00 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 4090.90 | 4091.00 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 4040.50 | 4040.60 | 0 |
| 2017-11-06 | Multi-Stage Fracture | 3989.50 | 3989.60 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-11-05 | 2017-11-06 | 2,695 | 9,226 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 82.4329 | N/A | |||
| FRAC SAND. 30/50 CANADIAN | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 12.7453 | N/A | ||
| FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.0858 | N/A | ||
| PRIME PLUS 30/50 | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 3.3825 | N/A | ||
| Alpha 544 | BJ Services | Bactericide/Biocide | 2.2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0083 | N/A | |
| Dibromoacetonitrile | 3252-43-5 | 100 | 0.0083 | N/A | ||||
| Polyethylene Glycol | 25322-68-3 | 100 | 0.0083 | N/A | ||||
| Sodium Bromide | 7647-15-6 | 100 | 0.0083 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0083 | N/A | ||||
| Breaker N | BJ Services | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0029 | N/A | |
| CC-2 | BJ Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0928 | N/A | |
| Non-hazardous | Not Available | 100 | 0.0928 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0928 | N/A | ||||
| D-3 | BJ Services | Demulsifier | Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.0575 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.0575 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.0575 | N/A | ||||
| MaxPerm-20A | BJ Services | Friction Reducer | Non-hazardous | 9014 | 100 | 0.0783 | N/A | |
| Oxyalkylated alcohol | 9014 | 100 | 0.0783 | N/A | ||||
| Petroleum distillates | 64742-47-8 | 100 | 0.0783 | N/A | ||||
| Polyacrylate | 9014 | 100 | 0.0783 | N/A | ||||
| ScaleTrol 14 | BJ Services | Scale Inhibitor | Phosphinocarboxylic acid copolymer | 110224-99-2 | 100 | 0.0104 | N/A | |
| Water | 7732-18-5 | 100 | 0.0104 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-10-19 | 2017-10-20 | Municipal Water | 150 |
| 2017-10-24 | 2017-11-05 | Central Water Distribution Facility | 8085 |
| 2017-10-25 | 2017-10-30 | Groundwater - Non-saline less than or equal to 150m deep | 991 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 324 | 0.0 | 0.0 | 0.0 |
| 2018 | 8054 | 0.0 | 0.0 | 0.0 |
| 2019 | 8251 | 0.0 | 0.0 | 0.0 |
| 2020 | 2161 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-09-06 | No Incident Encountered | 0.00 | 0.00 |
| 2017-11-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]