X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515170302000

Well Details

Well ID: 0515170302000
Loading map...
Location: 00/02-03-051-17W5/0
Location Alias: 00/02-03-51-17 W5M
Location Alias 2: 00/02-03-051-17 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 17
Section: 03
County/Municipality: Yellowhead County
Well Name: ROGCI HZ EDSON 2-3-51-17
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0483873
License Date: 2017-06-06
License Status: Issued
Spud Date: 2017-08-22
Final Drill Date: 2017-09-03
Well Total Depth: 4390.00 m
Surface Hole Latitude: 53.382236
Surface Hole Longitude: -116.431934

For data sources see[1][2]

Well History

Date Event
2017-06-06 Obtained License
2017-08-23 Surface Casing Operation Performed
2017-08-26 Direction Drilling Operation Performed - Deviate
2017-08-29 Well Log Performed
2017-08-30 Intermediate Casing Operation Performed
2017-09-01 Direction Drilling Operation Performed - Horizontal
2017-09-03 Finished Drilling
2017-09-03 Well Log Performed
2017-09-03 Well Mode changed to Drilled and Cased
2017-09-05 Production Casing Operation Performed
2017-09-06 Perforation Treatment Performed - Open-Hole Completion
2017-09-06 Rig Released
2017-11-05 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-06 Perforation Treatment Performed - Multi-Stage Fracture
2017-11-17 Well Fluid changed to Gas
2017-11-17 Well Mode changed to Testing
2017-12-18 Well Began Production
2017-12-18 Well Fluid changed to Gas
2017-12-18 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-08-22 Precision Drilling Corporation 231 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-08-26 2141.90 Deviate (5 - 79 degrees)
2017-09-01 3065.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-06 Open Hole/Barefoot Completion 4384.00 4390.00 0
2017-11-06 Multi-Stage Fracture 3938.10 3938.20 0
2017-11-06 Multi-Stage Fracture 3887.20 3887.30 0
2017-11-06 Multi-Stage Fracture 3836.70 3836.80 0
2017-11-06 Multi-Stage Fracture 3785.80 3785.90 0
2017-11-06 Multi-Stage Fracture 3734.80 3734.90 0
2017-11-06 Multi-Stage Fracture 3683.30 3683.40 0
2017-11-06 Multi-Stage Fracture 3632.50 3632.60 0
2017-11-06 Multi-Stage Fracture 3580.70 3580.80 0
2017-11-06 Multi-Stage Fracture 3529.80 3529.90 0
2017-11-06 Multi-Stage Fracture 3479.00 3479.10 0
2017-11-05 Multi-Stage Fracture 4350.60 4350.70 0
2017-11-06 Multi-Stage Fracture 3426.20 3426.30 0
2017-11-06 Multi-Stage Fracture 3369.60 3369.70 0
2017-11-06 Multi-Stage Fracture 3313.70 3313.80 0
2017-11-06 Multi-Stage Fracture 3256.80 3256.90 0
2017-11-06 Multi-Stage Fracture 3200.20 3200.30 0
2017-11-06 Multi-Stage Fracture 3143.30 3143.40 0
2017-11-06 Multi-Stage Fracture 3086.90 3087.00 0
2017-11-05 Multi-Stage Fracture 4294.30 4294.40 0
2017-11-05 Multi-Stage Fracture 4243.50 4243.60 0
2017-11-05 Multi-Stage Fracture 4192.80 4192.90 0
2017-11-05 Multi-Stage Fracture 4141.90 4142.00 0
2017-11-06 Multi-Stage Fracture 4090.90 4091.00 0
2017-11-06 Multi-Stage Fracture 4040.50 4040.60 0
2017-11-06 Multi-Stage Fracture 3989.50 3989.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-11-05 2017-11-06 2,695 9,226 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 82.4329 N/A
FRAC SAND. 30/50 CANADIAN BJ Services Crystalline Silica (Quartz) 14808-60-7 100 12.7453 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 1.0858 N/A
PRIME PLUS 30/50 BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.3825 N/A
Alpha 544 BJ Services Bactericide/Biocide 2.2-Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0083 N/A
Dibromoacetonitrile 3252-43-5 100 0.0083 N/A
Polyethylene Glycol 25322-68-3 100 0.0083 N/A
Sodium Bromide 7647-15-6 100 0.0083 N/A
Water 7732-18-5 100 0.0083 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0029 N/A
CC-2 BJ Services Clay Control Choline chloride 67-48-1 100 0.0928 N/A
Non-hazardous Not Available 100 0.0928 N/A
Water 7732-18-5 100 0.0928 N/A
D-3 BJ Services Demulsifier Ethoxylated alcohol. branched 78330-19-5 100 0.0575 N/A
Isopropanol 67-63-0 100 0.0575 N/A
Methanol 67-56-1 100 0.0575 N/A
MaxPerm-20A BJ Services Friction Reducer Non-hazardous 9014 100 0.0783 N/A
Oxyalkylated alcohol 9014 100 0.0783 N/A
Petroleum distillates 64742-47-8 100 0.0783 N/A
Polyacrylate 9014 100 0.0783 N/A
ScaleTrol 14 BJ Services Scale Inhibitor Phosphinocarboxylic acid copolymer 110224-99-2 100 0.0104 N/A
Water 7732-18-5 100 0.0104 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-10-19 2017-10-20 Municipal Water 150
2017-10-24 2017-11-05 Central Water Distribution Facility 8085
2017-10-25 2017-10-30 Groundwater - Non-saline less than or equal to 150m deep 991

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 324 0.0 0.0 0.0
2018 8054 0.0 0.0 0.0
2019 8251 0.0 0.0 0.0
2020 2161 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-09-06 No Incident Encountered 0.00 0.00
2017-11-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References