If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515170403000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.381538,"lon":-116.455016,"icon":""}]} |
| Location: 00/03-04-051-17W5/0 | |
| Location Alias: 00/03-04-51-17 W5M | |
| Location Alias 2: 00/03-04-051-17 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 17 | |
| Section: 04 | |
| County/Municipality: Yellowhead County | |
| Well Name: TALISMAN HZ EDSON 3-4-51-17 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0465882 | |
| License Date: 2014-03-24 | |
| License Status: Amended | |
| Spud Date: 2014-09-23 | |
| Final Drill Date: 2014-10-11 | |
| Well Total Depth: 4108.00 m | |
| Surface Hole Latitude: 53.381538 | |
| Surface Hole Longitude: -116.455016 |
| Date | Event |
|---|---|
| 2014-03-24 | Obtained License |
| 2014-09-25 | Surface Casing Operation Performed |
| 2014-09-30 | Direction Drilling Operation Performed - Deviate |
| 2014-10-03 | Well Log Performed |
| 2014-10-04 | Intermediate Casing Operation Performed |
| 2014-10-07 | Direction Drilling Operation Performed - Horizontal |
| 2014-10-11 | Finished Drilling |
| 2014-10-11 | Well Log Performed |
| 2014-10-11 | Well Mode changed to Drilled and Cased |
| 2014-10-13 | Production Casing Operation Performed |
| 2014-10-14 | Rig Released |
| 2014-10-16 | Well Log Performed |
| 2014-11-16 | Well Log Performed |
| 2014-12-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-12-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2014-12-22 | Well Fluid changed to Shale Gas and Other |
| 2014-12-22 | Well Mode changed to Testing |
| 2015-01-02 | Well Began Production |
| 2015-01-02 | Well Fluid changed to Shale Gas and Other |
| 2015-01-02 | Well Mode changed to Flowing |
| 2019-03-28 | Well Fluid changed to Shale Gas and Other |
| 2019-03-28 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2014-09-23 | Precision Drilling Corporation | 545 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-09-30 | 2417.00 | Deviate (5 - 79 degrees) |
| 2014-10-07 | 2868.00 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-12-03 | Multi-Stage Fracture | 4054.80 | 4054.90 | 0 |
| 2014-12-04 | Multi-Stage Fracture | 3371.50 | 3371.60 | 0 |
| 2014-12-04 | Multi-Stage Fracture | 3291.80 | 3291.90 | 0 |
| 2014-12-04 | Multi-Stage Fracture | 3212.30 | 3212.40 | 0 |
| 2014-12-04 | Multi-Stage Fracture | 3133.40 | 3133.50 | 0 |
| 2014-12-04 | Multi-Stage Fracture | 3055.00 | 3055.10 | 0 |
| 2014-12-04 | Multi-Stage Fracture | 2976.00 | 2976.10 | 0 |
| 2014-12-04 | Multi-Stage Fracture | 2896.70 | 2896.80 | 0 |
| 2014-12-03 | Multi-Stage Fracture | 4000.20 | 4000.30 | 0 |
| 2014-12-03 | Multi-Stage Fracture | 3922.20 | 3922.30 | 0 |
| 2014-12-03 | Multi-Stage Fracture | 3843.60 | 3843.70 | 0 |
| 2014-12-03 | Multi-Stage Fracture | 3764.60 | 3764.70 | 0 |
| 2014-12-03 | Multi-Stage Fracture | 3685.90 | 3686.00 | 0 |
| 2014-12-03 | Multi-Stage Fracture | 3607.90 | 3608.00 | 0 |
| 2014-12-03 | Multi-Stage Fracture | 3528.30 | 3528.40 | 0 |
| 2014-12-04 | Multi-Stage Fracture | 3450.20 | 3450.30 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2014-12-03 | 2014-12-04 | 2,727 | 6,035 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 85.7852 | N/A | |||
| OilPlus 20/40 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 4.1171 | N/A | ||
| silica crystalline | 14808-60-7 | 100 | 4.1171 | N/A | ||||
| Sand 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 8.5635 | N/A | ||
| Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 1.09 | N/A | ||
| Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0107 | N/A | |
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0107 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0107 | N/A | ||||
| polyethylene glycol | 25322-68-3 | 100 | 0.0107 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0107 | N/A | ||||
| CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.1844 | N/A | |
| water | Not Available | 100 | 0.1844 | N/A | ||||
| GNE-1 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0471 | N/A | |
| propylene glycol | 57-55-6 | 100 | 0.0471 | N/A | ||||
| GFR-1 | Trican | Friction Reducer | non-hazardous ingredients | Not Available | 100 | 0.108 | N/A | |
| GSI-1 | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0935 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2014-11-21 | 2014-11-25 | Surface Water - Lake | 4482 |
| 2014-11-17 | 2014-11-21 | Recycled Fracturing Water (treated at well site) | 1590 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2014 | 169 | 0.0 | 0.0 | 0.0 |
| 2015 | 8141 | 0.0 | 0.0 | 0.0 |
| 2016 | 8333 | 0.0 | 0.0 | 0.0 |
| 2017 | 7869 | 0.0 | 0.0 | 0.0 |
| 2018 | 7504 | 0.0 | 0.0 | 0.0 |
| 2019 | 8204 | 0.0 | 0.0 | 0.0 |
| 2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-10-14 | No Incident Encountered | 0.00 | 0.00 |
| 2014-12-09 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]