If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515170716000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.409549,"lon":-116.48983,"icon":""}]} |
| Location: 00/16-07-051-17W5/0 | |
| Location Alias: 00/16-07-51-17 W5M | |
| Location Alias 2: 00/16-07-051-17 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 17 | |
| Section: 07 | |
| County/Municipality: Yellowhead County | |
| Well Name: TALISMAN ET AL HZ EDSON 16-7-51-17 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0478429 | |
| License Date: 2015-12-11 | |
| License Status: Issued | |
| Spud Date: 2016-02-18 | |
| Final Drill Date: 2016-03-04 | |
| Well Total Depth: 4474.00 m | |
| Surface Hole Latitude: 53.409549 | |
| Surface Hole Longitude: -116.489830 |
| Date | Event |
|---|---|
| 2015-12-11 | Obtained License |
| 2016-02-20 | Surface Casing Operation Performed |
| 2016-02-23 | Direction Drilling Operation Performed - Deviate |
| 2016-02-24 | Well Log Performed |
| 2016-02-25 | Intermediate Casing Operation Performed |
| 2016-02-27 | Direction Drilling Operation Performed - Horizontal |
| 2016-03-04 | Finished Drilling |
| 2016-03-04 | Well Log Performed |
| 2016-03-04 | Well Mode changed to Drilled and Cased |
| 2016-03-07 | Perforation Treatment Performed - Open-Hole Completion |
| 2016-03-07 | Production Casing Operation Performed |
| 2016-03-07 | Rig Released |
| 2016-03-07 | Well Log Performed |
| 2016-10-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-10-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2016-10-06 | Well Fluid changed to Shale Gas and Other |
| 2016-10-06 | Well Mode changed to Testing |
| 2016-11-01 | Well Began Production |
| 2016-11-01 | Well Fluid changed to Shale Gas and Other |
| 2016-11-01 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2016-02-18 | Horizon Drilling Inc. | 48 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2016-02-23 | 2400.00 | Deviate (5 - 79 degrees) |
| 2016-02-27 | 2834.50 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2016-03-07 | Open Hole/Barefoot Completion | 4464.00 | 4474.00 | 0 |
| 2016-10-02 | Multi-Stage Fracture | 3876.90 | 3877.00 | 0 |
| 2016-10-02 | Multi-Stage Fracture | 3807.10 | 3807.20 | 0 |
| 2016-10-02 | Multi-Stage Fracture | 3737.70 | 3737.80 | 0 |
| 2016-10-02 | Multi-Stage Fracture | 3667.20 | 3667.30 | 0 |
| 2016-10-03 | Multi-Stage Fracture | 3596.70 | 3596.80 | 0 |
| 2016-10-03 | Multi-Stage Fracture | 3526.30 | 3526.40 | 0 |
| 2016-10-03 | Multi-Stage Fracture | 3457.40 | 3457.50 | 0 |
| 2016-10-03 | Multi-Stage Fracture | 3386.90 | 3387.00 | 0 |
| 2016-10-03 | Multi-Stage Fracture | 3316.90 | 3317.00 | 0 |
| 2016-10-03 | Multi-Stage Fracture | 3249.40 | 3249.50 | 0 |
| 2016-10-02 | Multi-Stage Fracture | 4414.50 | 4414.60 | 0 |
| 2016-10-03 | Multi-Stage Fracture | 3181.10 | 3181.20 | 0 |
| 2016-10-03 | Multi-Stage Fracture | 3112.00 | 3112.10 | 0 |
| 2016-10-03 | Multi-Stage Fracture | 3029.10 | 3029.20 | 0 |
| 2016-10-03 | Multi-Stage Fracture | 2960.70 | 2960.80 | 0 |
| 2016-10-03 | Multi-Stage Fracture | 2905.00 | 2905.10 | 0 |
| 2016-10-03 | Multi-Stage Fracture | 2848.40 | 2848.50 | 0 |
| 2016-10-02 | Multi-Stage Fracture | 4353.50 | 4353.60 | 0 |
| 2016-10-02 | Multi-Stage Fracture | 4296.80 | 4296.90 | 0 |
| 2016-10-02 | Multi-Stage Fracture | 4226.60 | 4226.70 | 0 |
| 2016-10-02 | Multi-Stage Fracture | 4156.10 | 4156.20 | 0 |
| 2016-10-02 | Multi-Stage Fracture | 4085.90 | 4086.00 | 0 |
| 2016-10-02 | Multi-Stage Fracture | 4017.30 | 4017.40 | 0 |
| 2016-10-02 | Multi-Stage Fracture | 3947.00 | 3947.10 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2016-10-02 | 2016-10-03 | 2,707 | 9,567 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 86.7561 | N/A | |||
| Sand - Tier 2 (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 10.2879 | N/A | ||
| Sand - Tier 2 (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 1.2718 | N/A | ||
| True North RCS (30/50) | Trican | aluminum oxide | 1344-28-1 | 100 | 3.1681 | N/A | ||
| hexamethylenetetramine | 100-97-0 | 100 | 3.1681 | N/A | ||||
| silica crystalline | 14808-60-7 | 100 | 3.0014 | N/A | ||||
| titanium dioxide | 13463-67-7 | 100 | 3.1681 | N/A | ||||
| AQUCAR DB20 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0103 | N/A | |
| 2-mercaptoethanol | 60-24-2 | 100 | 0.0103 | N/A | ||||
| dibromoacetonitrile | 3252-43-5 | 100 | 0.0103 | N/A | ||||
| non-hazardous ingredients | Not Available | 100 | 0.0103 | N/A | ||||
| sodium bromide | 7647-15-6 | 100 | 0.0103 | N/A | ||||
| CC-8 | Trican | Clay Control | choline chloride | 67-48-1 | 100 | 0.1627 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.1627 | N/A | ||||
| GFR-5D | Trican | Friction Reducer | anionic polyacrylamide | Not Available | 100 | 0.0303 | N/A | |
| GSI-1W | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.0476 | N/A | |
| propylene glycol | 57-55-6 | 100 | 0.0476 | N/A | ||||
| S-17W | Trican | Surfactant | ethylene/propylene oxide polymer | Not Available | 100 | 0.0435 | N/A | |
| methanol | 67-56-1 | 100 | 0.0435 | N/A | ||||
| water | Not Available | 100 | 0.0435 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2016-09-26 | 2016-10-03 | Surface Water - River | 10003 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2016 | 1721 | 0.0 | 0.0 | 0.0 |
| 2017 | 7888 | 0.0 | 0.0 | 0.0 |
| 2018 | 7457 | 0.0 | 0.0 | 0.0 |
| 2019 | 8060 | 0.0 | 0.0 | 0.0 |
| 2020 | 2088 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-03-07 | No Incident Encountered | 0.00 | 0.00 |
| 2016-10-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]