If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515170914000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.382105,"lon":-116.43188,"icon":""}]} |
| Location: 00/14-09-051-17W5/0 | |
| Location Alias: 00/14-09-51-17 W5M | |
| Location Alias 2: 00/14-09-051-17 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 17 | |
| Section: 09 | |
| County/Municipality: Yellowhead County | |
| Well Name: ROGCI HZ EDSON 14-9-51-17 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0478800 | |
| License Date: 2016-01-15 | |
| License Status: Amended | |
| Spud Date: 2017-09-08 | |
| Final Drill Date: 2017-09-24 | |
| Well Total Depth: 4482.00 m | |
| Surface Hole Latitude: 53.382105 | |
| Surface Hole Longitude: -116.431880 |
| Date | Event |
|---|---|
| 2016-01-15 | Obtained License |
| 2017-09-09 | Surface Casing Operation Performed |
| 2017-09-12 | Direction Drilling Operation Performed - Deviate |
| 2017-09-13 | Lost Circulation Occurred |
| 2017-09-16 | Well Log Performed |
| 2017-09-18 | Intermediate Casing Operation Performed |
| 2017-09-19 | Direction Drilling Operation Performed - Horizontal |
| 2017-09-24 | Finished Drilling |
| 2017-09-24 | Well Log Performed |
| 2017-09-24 | Well Mode changed to Drilled and Cased |
| 2017-09-26 | Production Casing Operation Performed |
| 2017-09-27 | Perforation Treatment Performed - Open-Hole Completion |
| 2017-09-27 | Rig Released |
| 2017-10-06 | Well Log Performed |
| 2017-11-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-11-03 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-11-04 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-11-13 | Well Fluid changed to Gas |
| 2017-11-13 | Well Mode changed to Testing |
| 2017-12-20 | Well Began Production |
| 2017-12-20 | Well Fluid changed to Gas |
| 2017-12-20 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-09-12 | 1532.00 | Deviate (5 - 79 degrees) |
| 2017-09-19 | 2877.60 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2017-09-27 | Open Hole/Barefoot Completion | 4475.10 | 4482.00 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 4009.80 | 4009.90 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3958.90 | 3959.00 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3896.50 | 3896.60 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3845.50 | 3845.60 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3789.80 | 3789.90 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3732.20 | 3732.30 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3675.50 | 3675.60 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3618.50 | 3618.60 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3561.60 | 3561.70 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3504.80 | 3504.90 | 0 |
| 2017-11-02 | Multi-Stage Fracture | 4464.10 | 4464.20 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3448.30 | 3448.40 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3391.30 | 3391.40 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3334.80 | 3334.90 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3277.60 | 3277.70 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3221.60 | 3221.70 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3166.50 | 3166.60 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3110.20 | 3110.30 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 3053.80 | 3053.90 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2997.20 | 2997.30 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2940.50 | 2940.60 | 0 |
| 2017-11-02 | Multi-Stage Fracture | 4402.80 | 4402.90 | 0 |
| 2017-11-04 | Multi-Stage Fracture | 2883.50 | 2883.60 | 0 |
| 2017-11-02 | Multi-Stage Fracture | 4346.20 | 4346.30 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 4290.40 | 4290.50 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 4232.90 | 4233.00 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 4176.00 | 4176.10 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 4124.80 | 4124.90 | 0 |
| 2017-11-03 | Multi-Stage Fracture | 4061.70 | 4061.80 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-11-02 | 2017-11-04 | 2,695 | 11,093 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | 7732-18-5 | 100 | 83.0828 | N/A | |||
| FRAC SAND. 30/50 CANADIAN | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 12.1361 | N/A | ||
| FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.1032 | N/A | ||
| TrueNorth 30/50 | BJ Services | Crystalline silica. Quartz | 14808-60-7 | 100 | 3.3098 | N/A | ||
| Alpha 544 | BJ Services | Bactericide/Biocide | 2.2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0088 | N/A | |
| Dibromoacetonitrile | 3252-43-5 | 100 | 0.0088 | N/A | ||||
| Polyethylene Glycol | 25322-68-3 | 100 | 0.0088 | N/A | ||||
| Sodium Bromide | 7647-15-6 | 100 | 0.0088 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0088 | N/A | ||||
| Breaker N | BJ Services | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0039 | N/A | |
| CC-2 | BJ Services | Clay Control | Choline chloride | 67-48-1 | 100 | 0.0914 | N/A | |
| Non-hazardous | Not Available | 100 | 0.0914 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0914 | N/A | ||||
| D-3 | BJ Services | Demulsifier | Ethoxylated alcohol. branched | 78330-19-5 | 100 | 0.065 | N/A | |
| Isopropanol | 67-63-0 | 100 | 0.065 | N/A | ||||
| Methanol | 67-56-1 | 100 | 0.065 | N/A | ||||
| MaxPerm-20A | BJ Services | Friction Reducer | Non-hazardous | 9014 | 100 | 0.0841 | N/A | |
| Oxyalkylated alcohol | 9014 | 100 | 0.0841 | N/A | ||||
| Petroleum distillates | 64742-47-8 | 100 | 0.0841 | N/A | ||||
| Polyacrylate | 9014 | 100 | 0.0841 | N/A | ||||
| ScaleTrol 14 | BJ Services | Scale Inhibitor | Phosphinocarboxylic acid copolymer | 110224-99-2 | 100 | 0.0117 | N/A | |
| Water | 7732-18-5 | 100 | 0.0117 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-10-23 | 2017-10-24 | Oilfield Produced Water | 74 |
| 2017-10-22 | 2017-10-30 | Oilfield Produced Water | 163 |
| 2017-10-22 | 2017-10-27 | Oilfield Produced Water | 61 |
| 2017-10-23 | 2017-10-25 | Oilfield Produced Water | 195 |
| 2017-10-21 | 2017-10-27 | Oilfield Produced Water | 104 |
| 2017-10-22 | 2017-10-23 | Waste Water - Oilfield | 33 |
| 2017-10-28 | 2017-10-29 | Oilfield Produced Water | 122 |
| 2017-10-21 | 2017-10-29 | Oilfield Produced Water | 82 |
| 2017-10-21 | 2017-10-28 | Oilfield Produced Water | 154 |
| 2017-10-22 | 2017-10-27 | Oilfield Produced Water | 33 |
| 2017-10-22 | 2017-10-27 | Oilfield Produced Water | 33 |
| 2017-10-26 | 2017-10-27 | Oilfield Produced Water | 30 |
| 2017-10-22 | 2017-10-27 | Oilfield Produced Water | 43 |
| 2017-10-21 | 2017-10-29 | Oilfield Produced Water | 127 |
| 2017-10-19 | 2017-10-20 | Municipal Water | 120 |
| 2017-10-24 | 2017-11-04 | Central Water Distribution Facility | 9720 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 387 | 0.0 | 0.0 | 0.0 |
| 2018 | 7422 | 0.0 | 0.0 | 0.0 |
| 2019 | 8199 | 0.0 | 0.0 | 0.0 |
| 2020 | 2145 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-09-13 | Lost Circulation | 1425.00 | 1425.00 |
| 2017-11-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]