X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515171501002

Well Details

Well ID: 0515171501002
Loading map...
Location: 00/01-15-051-17W5/2
Location Alias: 00/01-15-51-17 W5M
Location Alias 2: 00/01-15-051-17 W5/02
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 17
Section: 15
County/Municipality: Yellowhead County
Well Name: TALISMAN HZ EDSON 1-15-51-17
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0470694
License Date: 2014-10-16
License Status: Amended
Spud Date: 2014-11-09
Final Drill Date: 2014-12-03
Well Total Depth: 4710.00 m
Surface Hole Latitude: 53.410872
Surface Hole Longitude: -116.434551

For data sources see[1][2]

Well History

Date Event
2014-10-16 Obtained License
2014-11-12 Surface Casing Operation Performed
2014-11-23 Direction Drilling Operation Performed - Deviate
2014-11-23 Direction Drilling Operation Performed - Horizontal
2014-11-25 Direction Drilling Operation Performed - Horizontal
2014-11-26 Intermediate Casing Operation Performed
2014-12-03 Finished Drilling
2014-12-03 Well Log Performed
2014-12-03 Well Mode changed to Drilled and Cased
2014-12-05 Perforation Treatment Performed - Open-Hole Completion
2014-12-05 Production Casing Operation Performed
2014-12-07 Rig Released
2015-02-18 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-19 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-20 Perforation Treatment Performed - Multi-Stage Fracture
2015-03-01 Well Fluid changed to Shale Gas and Other
2015-03-01 Well Mode changed to Testing
2015-04-01 Well Began Production
2015-04-01 Well Fluid changed to Shale Gas and Other
2015-04-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-11-23 2202.50 Horizontal
2014-11-23 2223.30 Deviate (5 - 79 degrees)
2014-11-25 2777.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-12-05 Open Hole/Barefoot Completion 4686.00 4710.00 0
2015-02-18 Multi-Stage Fracture 4036.60 4036.70 0
2015-02-18 Multi-Stage Fracture 3957.00 3957.10 0
2015-02-19 Multi-Stage Fracture 3877.40 3877.50 0
2015-02-19 Multi-Stage Fracture 3797.70 3797.80 0
2015-02-19 Multi-Stage Fracture 3717.50 3717.60 0
2015-02-20 Multi-Stage Fracture 3637.60 3637.70 0
2015-02-20 Multi-Stage Fracture 3558.40 3558.50 0
2015-02-20 Multi-Stage Fracture 3478.70 3478.80 0
2015-02-20 Multi-Stage Fracture 3385.70 3385.80 0
2015-02-20 Multi-Stage Fracture 3292.90 3293.00 0
2015-02-18 Multi-Stage Fracture 4651.30 4651.40 0
2015-02-20 Multi-Stage Fracture 3199.70 3199.80 0
2015-02-20 Multi-Stage Fracture 3107.10 3107.20 0
2015-02-18 Multi-Stage Fracture 4592.60 4592.70 0
2015-02-18 Multi-Stage Fracture 4513.30 4513.40 0
2015-02-18 Multi-Stage Fracture 4434.40 4434.50 0
2015-02-18 Multi-Stage Fracture 4354.20 4354.30 0
2015-02-18 Multi-Stage Fracture 4274.80 4274.90 0
2015-02-18 Multi-Stage Fracture 4195.20 4195.30 0
2015-02-18 Multi-Stage Fracture 4116.10 4116.20 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-02-18 2015-02-20 2,658 8,028 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.1059 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 4.9414 N/A
silica crystalline 14808-60-7 100 4.9414 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 11.2099 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 1.327 N/A
Myacide GA-50 Trican Bactericide/Biocide glutaraldehyde 111-30-8 100 0.01 N/A
non-hazardous ingredients Not Available 100 0.01 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1772 N/A
water Not Available 100 0.1772 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0469 N/A
propylene glycol 57-55-6 100 0.0469 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0903 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.0903 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0903 N/A
GSI-1 Trican Scale Inhibitor non-hazardous ingredients Not Available 100 0.091 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-01-30 2015-01-30 Surface Water - Runoff 95
2015-01-29 2015-02-19 Surface Water - River 3819
2015-01-29 2015-02-13 Groundwater - Non-saline less than or equal to 150m deep 1006
2015-01-30 2015-02-16 Recycled Fracturing Water (treated at well site) 2356
2015-01-29 2015-02-19 Central Water Distribution Facility 875

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 6357 0.0 0.0 0.0
2016 8030 0.0 0.0 0.0
2017 7946 0.0 0.0 0.0
2018 6585 0.0 0.0 0.0
2019 7831 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-07 No Incident Encountered 0.00 0.00
2015-02-22 No Incident Encountered 0.00 0.00

For data sources see[9]

References