If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515171501002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.410872,"lon":-116.434551,"icon":""}]} |
| Location: 00/01-15-051-17W5/2 | |
| Location Alias: 00/01-15-51-17 W5M | |
| Location Alias 2: 00/01-15-051-17 W5/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 17 | |
| Section: 15 | |
| County/Municipality: Yellowhead County | |
| Well Name: TALISMAN HZ EDSON 1-15-51-17 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0470694 | |
| License Date: 2014-10-16 | |
| License Status: Amended | |
| Spud Date: 2014-11-09 | |
| Final Drill Date: 2014-12-03 | |
| Well Total Depth: 4710.00 m | |
| Surface Hole Latitude: 53.410872 | |
| Surface Hole Longitude: -116.434551 |
| Date | Event |
|---|---|
| 2014-10-16 | Obtained License |
| 2014-11-12 | Surface Casing Operation Performed |
| 2014-11-23 | Direction Drilling Operation Performed - Deviate |
| 2014-11-23 | Direction Drilling Operation Performed - Horizontal |
| 2014-11-25 | Direction Drilling Operation Performed - Horizontal |
| 2014-11-26 | Intermediate Casing Operation Performed |
| 2014-12-03 | Finished Drilling |
| 2014-12-03 | Well Log Performed |
| 2014-12-03 | Well Mode changed to Drilled and Cased |
| 2014-12-05 | Perforation Treatment Performed - Open-Hole Completion |
| 2014-12-05 | Production Casing Operation Performed |
| 2014-12-07 | Rig Released |
| 2015-02-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-02-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2015-03-01 | Well Fluid changed to Shale Gas and Other |
| 2015-03-01 | Well Mode changed to Testing |
| 2015-04-01 | Well Began Production |
| 2015-04-01 | Well Fluid changed to Shale Gas and Other |
| 2015-04-01 | Well Mode changed to Flowing |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2014-11-23 | 2202.50 | Horizontal |
| 2014-11-23 | 2223.30 | Deviate (5 - 79 degrees) |
| 2014-11-25 | 2777.90 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2014-12-05 | Open Hole/Barefoot Completion | 4686.00 | 4710.00 | 0 |
| 2015-02-18 | Multi-Stage Fracture | 4036.60 | 4036.70 | 0 |
| 2015-02-18 | Multi-Stage Fracture | 3957.00 | 3957.10 | 0 |
| 2015-02-19 | Multi-Stage Fracture | 3877.40 | 3877.50 | 0 |
| 2015-02-19 | Multi-Stage Fracture | 3797.70 | 3797.80 | 0 |
| 2015-02-19 | Multi-Stage Fracture | 3717.50 | 3717.60 | 0 |
| 2015-02-20 | Multi-Stage Fracture | 3637.60 | 3637.70 | 0 |
| 2015-02-20 | Multi-Stage Fracture | 3558.40 | 3558.50 | 0 |
| 2015-02-20 | Multi-Stage Fracture | 3478.70 | 3478.80 | 0 |
| 2015-02-20 | Multi-Stage Fracture | 3385.70 | 3385.80 | 0 |
| 2015-02-20 | Multi-Stage Fracture | 3292.90 | 3293.00 | 0 |
| 2015-02-18 | Multi-Stage Fracture | 4651.30 | 4651.40 | 0 |
| 2015-02-20 | Multi-Stage Fracture | 3199.70 | 3199.80 | 0 |
| 2015-02-20 | Multi-Stage Fracture | 3107.10 | 3107.20 | 0 |
| 2015-02-18 | Multi-Stage Fracture | 4592.60 | 4592.70 | 0 |
| 2015-02-18 | Multi-Stage Fracture | 4513.30 | 4513.40 | 0 |
| 2015-02-18 | Multi-Stage Fracture | 4434.40 | 4434.50 | 0 |
| 2015-02-18 | Multi-Stage Fracture | 4354.20 | 4354.30 | 0 |
| 2015-02-18 | Multi-Stage Fracture | 4274.80 | 4274.90 | 0 |
| 2015-02-18 | Multi-Stage Fracture | 4195.20 | 4195.30 | 0 |
| 2015-02-18 | Multi-Stage Fracture | 4116.10 | 4116.20 | 0 |
For data sources see[5]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2015-02-18 | 2015-02-20 | 2,658 | 8,028 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | water | Not Available | 100 | 82.1059 | N/A | |||
| Prime Plus 30/50 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 4.9414 | N/A | ||
| silica crystalline | 14808-60-7 | 100 | 4.9414 | N/A | ||||
| Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 11.2099 | N/A | ||
| Sand 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 1.327 | N/A | ||
| Myacide GA-50 | Trican | Bactericide/Biocide | glutaraldehyde | 111-30-8 | 100 | 0.01 | N/A | |
| non-hazardous ingredients | Not Available | 100 | 0.01 | N/A | ||||
| CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.1772 | N/A | |
| water | Not Available | 100 | 0.1772 | N/A | ||||
| GNE-1 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.0469 | N/A | |
| propylene glycol | 57-55-6 | 100 | 0.0469 | N/A | ||||
| FR-12 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0903 | N/A | |
| anionic polyacrylamide copolymer | 25987-30-8 | 100 | 0.0903 | N/A | ||||
| distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0903 | N/A | ||||
| GSI-1 | Trican | Scale Inhibitor | non-hazardous ingredients | Not Available | 100 | 0.091 | N/A |
For data sources see[6]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2015-01-30 | 2015-01-30 | Surface Water - Runoff | 95 |
| 2015-01-29 | 2015-02-19 | Surface Water - River | 3819 |
| 2015-01-29 | 2015-02-13 | Groundwater - Non-saline less than or equal to 150m deep | 1006 |
| 2015-01-30 | 2015-02-16 | Recycled Fracturing Water (treated at well site) | 2356 |
| 2015-01-29 | 2015-02-19 | Central Water Distribution Facility | 875 |
For data sources see[7]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2015 | 6357 | 0.0 | 0.0 | 0.0 |
| 2016 | 8030 | 0.0 | 0.0 | 0.0 |
| 2017 | 7946 | 0.0 | 0.0 | 0.0 |
| 2018 | 6585 | 0.0 | 0.0 | 0.0 |
| 2019 | 7831 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2014-12-07 | No Incident Encountered | 0.00 | 0.00 |
| 2015-02-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]