If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0515172001000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.425382,"lon":-116.481199,"icon":""}]} |
| Location: 00/01-20-051-17W5/0 | |
| Location Alias: 00/01-20-51-17 W5M | |
| Location Alias 2: 00/01-20-051-17 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 051 | |
| Meridian: 5 | |
| Range: 17 | |
| Section: 20 | |
| County/Municipality: Yellowhead County | |
| Well Name: ROGCI HZ EDSON 1-20-51-17 | |
| Operator Name: Repsol Oil & Gas Canada Inc. | |
| License Number: 0477562 | |
| License Date: 2015-11-09 | |
| License Status: Issued | |
| Spud Date: 2016-10-29 | |
| Final Drill Date: 2016-11-11 | |
| Well Total Depth: 4572.00 m | |
| Surface Hole Latitude: 53.425382 | |
| Surface Hole Longitude: -116.481199 |
| Date | Event |
|---|---|
| 2015-11-09 | Obtained License |
| 2016-10-30 | Surface Casing Operation Performed |
| 2016-11-02 | Direction Drilling Operation Performed - Deviate |
| 2016-11-03 | Well Log Performed |
| 2016-11-04 | Intermediate Casing Operation Performed |
| 2016-11-06 | Direction Drilling Operation Performed - Horizontal |
| 2016-11-11 | Finished Drilling |
| 2016-11-11 | Well Log Performed |
| 2016-11-11 | Well Mode changed to Drilled and Cased |
| 2016-11-12 | Production Casing Operation Performed |
| 2016-11-14 | Perforation Treatment Performed - Open-Hole Completion |
| 2016-11-14 | Rig Released |
| 2017-02-05 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-02-06 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-02-07 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2017-02-15 | Well Fluid changed to Gas |
| 2017-02-15 | Well Mode changed to Testing |
| 2017-03-08 | Well Began Production |
| 2017-03-08 | Well Fluid changed to Gas |
| 2017-03-08 | Well Mode changed to Flowing |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2016-10-29 | Trinidad Drilling Ltd. | 418 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2016-11-02 | 2399.50 | Deviate (5 - 79 degrees) |
| 2016-11-06 | 2807.70 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2016-11-14 | Open Hole/Barefoot Completion | 4560.00 | 4572.00 | 0 |
| 2017-02-05 | Multi-Stage Fracture | 4031.70 | 4031.80 | 0 |
| 2017-02-05 | Multi-Stage Fracture | 3970.30 | 3970.40 | 0 |
| 2017-02-05 | Multi-Stage Fracture | 3907.30 | 3907.40 | 0 |
| 2017-02-06 | Multi-Stage Fracture | 3844.20 | 3844.30 | 0 |
| 2017-02-06 | Multi-Stage Fracture | 3781.40 | 3781.50 | 0 |
| 2017-02-06 | Multi-Stage Fracture | 3718.40 | 3718.50 | 0 |
| 2017-02-06 | Multi-Stage Fracture | 3655.50 | 3655.60 | 0 |
| 2017-02-06 | Multi-Stage Fracture | 3592.30 | 3592.40 | 0 |
| 2017-02-06 | Multi-Stage Fracture | 3529.40 | 3529.50 | 0 |
| 2017-02-06 | Multi-Stage Fracture | 3466.40 | 3466.50 | 0 |
| 2017-02-05 | Multi-Stage Fracture | 4536.40 | 4536.50 | 0 |
| 2017-02-06 | Multi-Stage Fracture | 3404.10 | 3404.20 | 0 |
| 2017-02-06 | Multi-Stage Fracture | 3341.70 | 3341.80 | 0 |
| 2017-02-06 | Multi-Stage Fracture | 3278.80 | 3278.90 | 0 |
| 2017-02-06 | Multi-Stage Fracture | 3215.80 | 3215.90 | 0 |
| 2017-02-06 | Multi-Stage Fracture | 3152.80 | 3152.90 | 0 |
| 2017-02-07 | Multi-Stage Fracture | 3090.00 | 3090.10 | 0 |
| 2017-02-07 | Multi-Stage Fracture | 3027.00 | 3027.10 | 0 |
| 2017-02-07 | Multi-Stage Fracture | 2964.00 | 2964.10 | 0 |
| 2017-02-07 | Multi-Stage Fracture | 2901.10 | 2901.20 | 0 |
| 2017-02-07 | Multi-Stage Fracture | 2838.30 | 2838.40 | 0 |
| 2017-02-05 | Multi-Stage Fracture | 4471.70 | 4471.80 | 0 |
| 2017-02-05 | Multi-Stage Fracture | 4408.80 | 4408.90 | 0 |
| 2017-02-05 | Multi-Stage Fracture | 4346.00 | 4346.10 | 0 |
| 2017-02-05 | Multi-Stage Fracture | 4283.10 | 4283.20 | 0 |
| 2017-02-05 | Multi-Stage Fracture | 4220.10 | 4220.20 | 0 |
| 2017-02-05 | Multi-Stage Fracture | 4169.50 | 4169.60 | 0 |
| 2017-02-05 | Multi-Stage Fracture | 4095.10 | 4095.20 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2017-02-05 | 2017-02-07 | 2,665 | 10,383 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 82.8175 | N/A | |||
| Sand (30/50) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 12.4119 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 12.4119 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 12.4119 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 12.4119 | N/A | ||||
| Sand (40/70) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 1.1283 | N/A | ||
| Crystalline silica. quartz | 14808-60-7 | 100 | 1.1283 | N/A | ||||
| Iron Oxide | 1309-37-1 | 100 | 1.1283 | N/A | ||||
| Titanium Oxide | 13463-67-7 | 100 | 1.1284 | N/A | ||||
| True North (30/50) | Canyon Technical Services | Crystalline silica. quartz | 14808-60-7 | 100 | 3.2969 | N/A | ||
| Chemcide PT | Canyon Technical Services | Bactericide/Biocide | Methyl Alcohol | 67-56-1 | 100 | 0.0276 | N/A | |
| N-Coco Alkyltrimethylenediamine diacetates | 61791-64-8 | 100 | 0.0276 | N/A | ||||
| CAN-1911 Clay Stabilizer | Canyon Technical Services | Clay Control | 1.6-Hexandiamine. dihydrochloride | 6055-52-3 | 100 | 0.18 | N/A | |
| Water | 7732-18-5 | 100 | 0.18 | N/A | ||||
| CAN-2413 Non-emulsifier | Canyon Technical Services | Demulsifier | Isopropyl Alcohol | 67-63-0 | 100 | 0.0404 | N/A | |
| Methanol | 67-56-1 | 100 | 0.0404 | N/A | ||||
| Non-hazardous base ingredient(s) | Not Available | 100 | 0.0404 | N/A | ||||
| Sulfonic Acids (Petroleum) | 61789-85-3 | 100 | 0.0404 | N/A | ||||
| CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0786 | N/A | |
| CAN-1402 Scale Inhibitor | Canyon Technical Services | Scale Inhibitor | Methyl Alcohol | 67-56-1 | 100 | 0.0184 | N/A | |
| Potassium Chloride | 7447-40-7 | 100 | 0.0184 | N/A | ||||
| Water | 7732-18-5 | 100 | 0.0184 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2017-01-31 | 2017-02-09 | Central Water Distribution Facility | 9000 |
| 2017-02-07 | 2017-02-07 | Recycled Fracturing Water (treated at well site) | 1831 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2017 | 6616 | 0.0 | 0.0 | 0.0 |
| 2018 | 6554 | 0.0 | 0.0 | 0.0 |
| 2019 | 8107 | 0.0 | 0.0 | 0.0 |
| 2020 | 2083 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2016-11-14 | No Incident Encountered | 0.00 | 0.00 |
| 2017-02-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]