X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0515180102000

Well Details

Well ID: 0515180102000
Loading map...
Location: 00/02-01-051-18W5/0
Location Alias: 00/02-01-51-18 W5M
Location Alias 2: 00/02-01-051-18 W5/00
Country: Canada
Province: Alberta
Township: 051
Meridian: 5
Range: 18
Section: 01
County/Municipality: Yellowhead County
Well Name: ROGCI ET AL HZ EDSON 2-1-51-18
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0480714
License Date: 2016-10-11
License Status: Issued
Spud Date: 2017-01-16
Final Drill Date: 2017-01-28
Well Total Depth: 4415.00 m
Surface Hole Latitude: 53.382638
Surface Hole Longitude: -116.529564

For data sources see[1][2]

Well History

Date Event
2016-10-11 Obtained License
2017-01-18 Surface Casing Operation Performed
2017-01-21 Direction Drilling Operation Performed - Deviate
2017-01-23 Well Log Performed
2017-01-24 Intermediate Casing Operation Performed
2017-01-25 Direction Drilling Operation Performed - Horizontal
2017-01-28 Finished Drilling
2017-01-28 Well Log Performed
2017-01-28 Well Mode changed to Drilled and Cased
2017-01-29 Production Casing Operation Performed
2017-01-30 Rig Released
2017-01-31 Perforation Treatment Performed - Open-Hole Completion
2017-07-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-24 Well Fluid changed to Gas
2017-07-24 Well Mode changed to Testing
2017-08-18 Well Began Production
2017-08-18 Well Fluid changed to Gas
2017-08-18 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-01-16 Trinidad Drilling Ltd. 418 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-21 2257.60 Deviate (5 - 79 degrees)
2017-01-25 2999.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-31 Open Hole/Barefoot Completion 4398.00 4415.00 0
2017-07-21 Multi-Stage Fracture 3812.80 3812.90 0
2017-07-21 Multi-Stage Fracture 3741.20 3741.30 0
2017-07-21 Multi-Stage Fracture 3669.40 3669.50 0
2017-07-21 Multi-Stage Fracture 3597.90 3598.00 0
2017-07-21 Multi-Stage Fracture 3525.80 3525.90 0
2017-07-21 Multi-Stage Fracture 3453.80 3453.90 0
2017-07-21 Multi-Stage Fracture 3381.30 3381.40 0
2017-07-21 Multi-Stage Fracture 3309.30 3309.40 0
2017-07-21 Multi-Stage Fracture 3251.30 3251.40 0
2017-07-21 Multi-Stage Fracture 3193.50 3193.60 0
2017-07-21 Multi-Stage Fracture 4358.30 4358.40 0
2017-07-21 Multi-Stage Fracture 3135.30 3135.40 0
2017-07-21 Multi-Stage Fracture 3077.30 3077.40 0
2017-07-21 Multi-Stage Fracture 3019.70 3019.80 0
2017-07-21 Multi-Stage Fracture 4300.70 4300.80 0
2017-07-21 Multi-Stage Fracture 4228.70 4228.80 0
2017-07-21 Multi-Stage Fracture 4171.20 4171.30 0
2017-07-21 Multi-Stage Fracture 4099.10 4099.20 0
2017-07-21 Multi-Stage Fracture 4028.20 4028.30 0
2017-07-21 Multi-Stage Fracture 3956.10 3956.20 0
2017-07-21 Multi-Stage Fracture 3884.60 3884.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-07-21 2017-07-21 2,801 7,377 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 81.9908 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 12.9993 N/A
Sand - Tier 2 (40/70) Trican silica crystalline 14808-60-7 100 1.1892 N/A
True North RCS (30/50) Trican aluminum oxide 1344-28-1 100 3.551 N/A
hexamethylenetetramine 100-97-0 100 3.5509 N/A
silica crystalline 14808-60-7 100 3.551 N/A
titanium dioxide 13463-67-7 100 3.5509 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0097 N/A
2-mercaptoethanol 60-24-2 100 0.0097 N/A
dibromoacetonitrile 3252-43-5 100 0.0097 N/A
non-hazardous ingredients Not Available 100 0.0097 N/A
sodium bromide 7647-15-6 100 0.0097 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1533 N/A
non-hazardous ingredients Not Available 100 0.1533 N/A
TriVert 1000 Trican Diverting Agent non-hazardous ingredients Not Available 100 0.0054 N/A
FR-22 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0452 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0452 N/A
non-hazardous ingredients Not Available 100 0.0452 N/A
SI-14 Trican Scale Inhibitor methanol 67-56-1 100 0.0162 N/A
non-hazardous ingredients Not Available 100 0.0162 N/A
S-17X Trican Surfactant 1-hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0398 N/A
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol 26836-07-7 100 0.0398 N/A
methanol 67-56-1 100 0.0398 N/A
methyloxirane polymer with oxirane 11/6/9003 100 0.0398 N/A
non-hazardous ingredients Not Available 100 0.0398 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-07-12 2017-07-12 Recycled Fracturing Water (treated at well site) 2295
2017-07-12 2017-07-24 Surface Water - Lake 5448

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 2613 0.0 0.0 0.0
2018 8435 0.0 0.0 0.0
2019 8439 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-01-31 No Incident Encountered 0.00 0.00
2017-08-06 No Incident Encountered 0.00 0.00

For data sources see[10]

References